Weekly Traffic Control Report

September 9, 2022

2022 CORRECTIVE MAINTENANCE PROJECT – ROCK BOULEVARD FROM MCCARRAN TO THE TRUCKEE RIVER BRIDGE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The contractor will continue Mill Street and fill operations, then transition to micro-surfacing.  Traffic will be reduced to one lane each direction and work area will be congested.  Slow down and expect delays.

2022 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Friday (9/9/2022)
Micro-Surfacing
– Caughlin Parkway:  Sourdough Circle to Sawbuck Road
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– El Rancho Boulevard:  Victorian Avenue to Sullivan Lane
– Carville Drive:  Silverada Boulevard to Paradise Drive

Saturday (9/10/2022)
   No work

Sunday (9/11/2022)
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– First Street:  Center Street to Lake Street
– Fourth Street: Virginia Street to Evans Avenue
Carville Drive:  Silverada Boulevard to Paradise Drive
– Ralston Street:  University Terrace to Eleventh Street
– North Hills Boulevard:  Golden Valley Road to Buck Drive

Monday (9/12/2022)
Micro-Surfacing
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– North Hills Boulevard:  Golden Valley Road to Buck Drive
– Caughlin Parkway:  Sourdough Circle to Sawbuck Road
– Mayberry Drive:  Fourth Street to Hunter Lake Drive

Tuesday (9/13/2022)
Micro-Surfacing
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Caughlin Parkway:  Sourdough Circle to Sawbuck Road
– Mayberry Drive:  Fourth Street to Hunter Lake Drive

Wednesday (9/14/2022)
Micro-Surfacing
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Mayberry Drive:  Fourth Street to Hunter Lake Drive

Thursday (9/15/2022)
Micro-Surfacing
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Mayberry Drive:  Fourth Street to Hunter Lake Drive

Friday (9/16/2022)
Micro-Surfacing
– Hunter Lake Drive:  Rodney Drive to Idlewild Drive
– Somersett Ridge Parkway:  US Hwy 40 to Del Webb Parkway
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Hunter Lake Drive:  Rodney Drive to Idlewild Drive
– Somersett Ridge Parkway:  US Hwy 40 to Del Webb Parkway

Note:  This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction will continue on Double R Boulevard between South Meadows Parkway and Sandhill Drive.  Lane closures are in place during this phase of the project.

MILL STREET COMPLETE PROJECT – MILL STREET FROM TERMINAL WAY TO MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The project is substantially complete.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see daily intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Pyramid Way:  Intermittent lane closures between 9:00 a.m. – 2:00 p.m.
  • Paving operations are ongoing until Friday, September 16.
    – Rock Boulevard intersection (north side) closure with detour.
    – 12th Street intersection (north side) closure with detour.
    – Sullivan Lane:  Lane closures during construction hours.
  • Traffic swap (to new pavement) north side of Oddie Boulevard starting Saturday, September 17.
  • One lane in each direction will be maintained along Oddie Boulevard.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

PECKHAM LANE REHABILITATION PROJECT
RTC Project Manager, Andrew Jayankura, P.E., PTOE, RSP1 – (775) 332-2139

Roadway rehabilitation of Peckham Lane between South Virginia Street and Baker Lane have begun and will continue through October 2022.  Detours will be in place around the vicinity of the project.

RENO CONSOLIDATED 22-01 – SKY MOUNTAIN DRIVE, SKY VALLEY DRIVE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The project is substantially complete.

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

SPARKS BOULEVARD IMPROVEMENT PROJECT – SOUTH PHASE
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Granite Construction Company is working in both the southbound and northbound lanes, as well as outside shoulders along Sparks Boulevard between Lincoln Way and Greg Street.  Nightly lane closures will reduce traffic to one lane in the southbound direction between Lincoln Way and Greg Street, and in the northbound direction between Greg Street and I-80 eastbound off-ramp.  Daytime single-lane closures will also be in place on Sparks Boulevard in the southbound direction between Kleppe Lane and Greg Street from 10:00 a.m. to 6:00 p.m.

Upcoming Marathon Shift Work:

Weekend Closure 1:  Friday, September 9, 2022, 8:00 p.m. through Monday, September 12, 2022,  6:00 a.m. – Sparks Boulevard will be closed in the southbound direction from Lincoln Way to the I-80 eastbound off-ramp.  All northbound traffic will remain open.  Traffic will be detoured to and from Sparks Boulevard through Lincoln Way to Lillard Drive/Brierley Way to Vista Boulevard.

Weekend Closure 2:  Friday, September 16, 2022, 8:00 p.m. through Monday, September 19, 2022, 6:00 a.m. – Sparks Boulevard will be closed in the southbound direction from Lincoln Way to Greg Street and northbound from Greg Street to the I-80 westbound off-ramp.  All on-ramps and off-ramps at Sparks Boulevard interchange (with the exception of the I-80 eastbound off-ramp, right turn) will be closed and traffic will be detoured to Vista Boulevard.

Drivers should expect delays during the morning commute.  Look for signs and traffic control devices.  Please drive with caution.

TE SPOT 10 – SOUTH PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of a new roundabout at the intersection of 4th Street and Woodland Avenue is delayed until September 12, 2022.  Lane closures and detours will be in place.  The first phase of this project will be relocation of overhead utilities to underground with the roundabout construction starting spring 2023.

TRAFFIC SIGNAL INSTALLATION (TSI) 22-01 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Traffic signal at South Meadows Boulevard and Wilbur May Boulevard construction continues through October 2022.