Weekly Traffic Control Report

September 15, 2017

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

September 15, 2017

1:00 PM PST

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT

  • Construction is in progress. For current traffic information Click here.
  • Traffic control and work zones will be in place and changing frequently. Use caution and look for flaggers for direction. Expect traffic delays.


ANNUAL PAVEMENT PRESERVATION PROJECT

Various roads within the cities of Sparks, Reno and Washoe County. Traffic control will include isolated lane shifts and/or lane closures with possible flagger controls.

Friday 9/15
Slurry Seal
College Dr: Village Blvd to Mt. Rose Hwy (SR 431)
Village Blvd: Lakeshore Blvd to Eagle Dr

Pavement Patching
Caughlin Pkwy: McCarran Blvd to Sierra Crest Way
Fourth St: McCarran Blvd to Keystone Ave

Raise Utilities
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Plumb Ln: Hunter Lake Dr to Virginia St

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Country Club Dr: Mt. Rose Hwy (SR 431) to Lakeshore Blvd
College Dr: Village Blvd to Mt. Rose Hwy (SR 431)
Village Blvd: Lakeshore Blvd to Eagle Dr

Saturday 9/16
No work scheduled

Sunday 9/17
Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Traffic Signal Loops (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Monday 9/18
Pavement Patching
Lemmon Dr: Sky Vista Pkwy to Patrician Dr

Raise Utilities
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Crack Sealing
Plumb Ln: Hunter Lake Dr to Virginia St
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Traffic Signal Loops (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Tuesday 9/19
Pavement Patching
Lemmon Dr: Sky Vista Pkwy to Patrician Dr
Echo Ave: Moya Blvd to Mt. Anderson St
Lear Blvd: Stead Blvd to Zeolite Dr
Silver Lake Rd: Red Rock Rd to Stead Blvd
Terminal Way: Plumb Ln to Mill St

Raise Utilities
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Crack Sealing
Plumb Ln: Hunter Lake Dr to Virginia St
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Traffic Signal Loops (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Wednesday 9/20
Pavement Patching
Echo Ave: Moya Blvd to Mt. Anderson St
Lear Blvd: Stead Blvd to Zeolite Dr
Silver Lake Rd: Red Rock Rd to Stead Blvd

Raise Utilities
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Crack Sealing
Plumb Ln: Hunter Lake Dr to Virginia St
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd
Lemmon Dr: Sky Vista Pkwy to Patrician Dr

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Traffic Signal Loops (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Thursday 9/21
Pavement Patching
Third St: Sierra St to Vine St
Lake St: Fourth St to Sixth St
Second St: Truckee River Bridge to Giroux St
Sinclair St: Liberty St to Mill St

Raise Utilities
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Echo Ave: Moya Blvd to Mt. Anderson St
Lear Blvd: Stead Blvd to Zeolite Dr
Silver Lake Rd: Red Rock Rd to Stead Blvd

Friday 9/22
Pavement Patching
Third St: Sierra St to Vine St
Lake St: Fourth St to Sixth St
Second St: Truckee River Bridge to Giroux St
Sinclair St: Liberty St to Mill St

Raise Utilities
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr
Maestro Dr: Longley Ln to Double R Blvd

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Echo Ave: Moya Blvd to Mt. Anderson St
Lear Blvd: Stead Blvd to Zeolite Dr
Silver Lake Rd: Red Rock Rd to Stead Blvd


PYRAMID WAY AND MCCARRAN BLVD INTERSECTION PROJECT

  • Construction is in progress. For current traffic information Click here.
  • Traffic control and work zones will be in place and changing frequently. Use caution and look for flaggers for direction. Expect traffic delays.


SOUTHEAST CONNECTOR PROJECT

From Pembroke Dr to South Meadows Pkwy and Veterans Pkwy (4.5 miles)

  • Flaggers may be located at Mira Loma Dr and Pembroke Dr to control vehicular traffic. Flaggers will stop traffic for short durations to allow construction vehicles to cross Mira Loma Dr and Pembroke Dr.
  • Be aware and pay attention to the traffic control signs. Lane reductions are in place at the intersection of South Meadows Pkwy and Veterans Pkwy. Brief delays are expected.

 

See weekly traffic report archive