Weekly Traffic Control Report

September 16, 2022

2022 CORRECTIVE MAINTENANCE PROJECT – ROCK BOULEVARD FROM MCCARRAN TO THE TRUCKEE RIVER BRIDGE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The contractor has completed resurfacing operations and will be finalizing striping and utility raising activities. Traffic control will vary throughout the corridor. Slow down and expect delays.

PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Sunday (9/18/2022)
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
– Thomas Creek Road:  Holcomb Lane to Foothill Road

Monday (9/19/2022)
Micro-Surfacing
– Hunter Lake Drive:  Rodney Drive to Idlewild Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
– Mayberry Drive:  Fourth Street to Hunter Lake Drive
– Hunter Lake Drive:  Rodney Drive to Idlewild Drive

Tuesday (9/20/2022)
Micro-Surfacing
-Hunter Lake Drive: Rodney Drive to Idlewild Drive
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
Hunter Lake Drive: Rodney Drive to Idlewild Drive

Wednesday (9/21/2022)
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
-Various project streets second coat

Thursday (9/22/2022)
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
-Various project streets second coat

Friday (9/23/2022)
Pavement Striping (night work – 7:00 p.m. – 7:00 a.m.)
-Various project streets second coat

Note:  This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction has moved to Gieger Grade from South Virginia to Veterans Parkway. Work is off the shoulder with no traffic control needed. The next portion will be on Veterans Parkway from Gieger Grade to Curti Ranch Road. Traffic control will be shoulder and lane closures for this portion.

Beginning the week of September 19th Q& D will begin patching roadway and sidewalk along Sharlands Avenue from Robb Drive to Mae Anne Avenue. Lane closures will be in place for this work.

MILL STREET COMPLETE PROJECT – MILL STREET FROM TERMINAL WAY TO MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The project is substantially complete.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see daily intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Pyramid Way Intermittent lane closure between 9:00 a.m. – 2:00 p.m.
    •  NVE will be doing night work from 9:00 pm until 5:30 am.
  • Traffic swap (to new pavement) north side of Oddie Boulevard starting Saturday, September 17.
  • One lane in each direction will be maintained along Oddie Boulevard.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

PECKHAM LANE REHABILITATION PROJECT
RTC Project Manager, Andrew Jayankura, P.E., PTOE, RSP1 – (775) 332-2139

Roadway rehabilitation of Peckham Lane between South Virginia Street and Baker Lane have begun and will continue through October 2022. Detours will be in place around the vicinity of the project.

RENO CONSOLIDATED 22-01 – SKY MOUNTAIN DRIVE, SKY VALLEY DRIVE
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The project is substantially complete.

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

SPARKS BOULEVARD IMPROVEMENT PROJECT – SOUTH PHASE
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Granite Construction Company is working in both the southbound and northbound lanes as well as outside shoulders along Sparks Boulevard between Lincoln Way and Greg Street. Nightly lane closures will reduce traffic to one lane in the southbound direction between Lincoln Way and Greg Street and in the northbound direction between Greg Street and I-80 eastbound off-ramp. Daytime single-lane closures will also be in place on Sparks Boulevard in the southbound direction between Kleppe Lane and Greg Street from 10:00 a.m. to 6:00 p.m. The Sparks Boulevard westbound off-ramp thru/left turn lane to southbound Sparks Boulevard will be closed until Monday, September 19, 2022, at 6:00 a.m.

Upcoming Marathon Shift Work:
Weekend Closure:  Friday, September 16, 2022, at 8:00 p.m. through Monday, September 19, 2022, at 6:00 a.m. Sparks Boulevard will be closed in the southbound direction from Lincoln Way to Greg Street and northbound from Greg Street to the I-80 westbound off-ramp. All on-ramps and off-ramps at Sparks Boulevard interchange (with the exception of the I-80 eastbound off-ramp, right turn) will be closed and traffic will be detoured to Vista Boulevard.

Drivers should expect delays during the morning commute, look for signs and traffic control devices. Please drive with caution.

TE SPOT 10 – SOUTH PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of a new roundabout at the intersection of 4th Street and Woodland Avenue will commence September 14th. Lane, shoulder closures and detours will be in place. The first phase of this project will be relocation of overhead utilities to underground with the roundabout construction starting spring 2023.

TRAFFIC SIGNAL INSTALLATION (TSI) 22-01 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Traffic signal at South Meadows Boulevard and Wilbur May Boulevard construction continues through October 2022.

See weekly traffic report archive