2019 PREVENTIVE MAINTENANCE PROGRAM

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Friday 9/13/2019
Slurry Seal
Ninth Street: Virginia Street to Evans Avenue
Ninth Street: Evans Avenue to Valley Road
Ninth Street: Wells Avenue to Shoshone Drive
Cabela Drive: Round-A-Bout to South Verdi Road
South Verdi Road: Verdi Court to Bridge Street
Boomtown-Garson Road: Cabela Drive to I-80 On/Off Ramps

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Ninth Street: Virginia Street to Evans Avenue
Ninth Street: Evans Avenue to Valley Road
Ninth Street: Wells Avenue to Shoshone Drive
Cabela Drive: Round-A-Bout to South Verdi Road
South Verdi Road: Verdi Court to Bridge Street
Boomtown-Garson Road: Cabela Drive to I-80 On/Off Ramps
Lakeside Drive: Huffaker Lane to Bartley Ranch Regional Park Entrance
Double Diamond Parkway: Double R Boulevard (North) to Double R Boulevard (South)

Saturday 9/14/2019
Slurry Seal
Fifth Street: Ferrari Street to Cul-De-Sac
Depaoli Street: Fifth Street to Tacchino Street
Ferrari Street: Fourth Street to Fifth Street
Tacchino Street: Depaoli Street to Fourth Street
Ralston Street: Fifth Street to University Terrace
Ryland Street: Holcomb Avenue to Kirman Avenue

Sunday 9/15/2019
Slurry Seal
Vista Boulevard: Brierley Way to Prater Way

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Vista Boulevard: Brierley Way to Prater Way
Fifth Street: Ferrari Street to Cul-De-Sac
Depaoli Street: Fifth Street to Tacchino Street
Ferrari Street: Fourth Street to Fifth Street
Tacchino Street: Depaoli Street to Fourth Street
Ralston Street: Fifth Street to University Terrace
Ryland Street: Holcomb Avenue to Kirman Avenue
Ninth Street: Virginia Street to Evans Avenue
Ninth Street: Evans Avenue to Valley Road
Ninth Street: Wells Avenue to Shoshone Drive
Cabela Drive: Round-A-Bout to South Verdi Road
South Verdi Road: Verdi Court to Bridge Street
Boomtown-Garson Road: Cabela Drive to I-80 On/Off Ramps

Monday 9/16/2019

Slurry Seal
South Verdi Road: Verdi Court to Bridge Street
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
South Verdi Road: Verdi Court to Bridge Street
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway
Cabela Drive: Round-A-Bout to South Verdi Road
Boomtown-Garson Road: Cabela Drive to I-80 On/Off Ramps

 

Tuesday 9/17/2019

Slurry Seal
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway
Fifth Street: Ferrari Street to Cul-De-Sac
Depaoli Street: Fifth Street to Tacchino Street
Ferrari Street: Fourth Street to Fifth Street
Tacchino Street: Depaoli Street to Fourth Street
Ralston Street: Fifth Street to University Terrace
Ryland Street: Holcomb Avenue to Kirman Avenue
Cabela Drive: Round-A-Bout to South Verdi Road
Boomtown-Garson Road: Cabela Drive to I-80 On/Off Ramps

 

Wednesday 9/18/2019

Pavement Patching
Sky Vista Parkway: Trading Post Road to Vista Knoll Parkway

Slurry Seal
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street+

Thursday 9/19/2019

Pavement Patching
Sky Vista Parkway: Trading Post Road to Vista Knoll Parkway

Slurry Seal
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway

 

Friday 9/20/2019
Slurry Seal
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Seventh Street: Robb Drive to Washington Street
Seventh Street: Sierra Street to Virginia Street
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway

 

Saturday 9/21/2019
Slurry Seal
Mesa Park Road: West Fourth Street to Mae Anne Avenue
Mae Anne Avenue: Mesa Park Road to La Salle Heights

 

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

The road is open with no controls.  Signal work that remains will occur later this year and may require traffic control for a short period of time.

 

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive
Construction on hold until signal equipment arrives mid-November.

 

 

RENO CONSOLIDATED 19-01 – SUTRO STREET, LAKE STREET, FIRST STREET AND STATE STREET

Construction closures and detours for the project will continue the week of September 16. The project is expected to be complete by September 30.
Lake Street will be closed to through traffic from the Truckee River bridge to Second Street. Northbound traffic will be detoured at Mill Street to Wells Avenue to Kuenzli Street and at Liberty Street to Center Street. Southbound traffic will be detoured at Second Street to Virginia Street to Liberty Street to Sinclair Street. Businesses within the closure will be provided southbound access at 2nd Street to westbound 1st Street.
1st Street will be closed to through traffic from Center Street to Lake Street. Businesses within the closure will be provided southbound access at 2nd Street to westbound at 1st Street. Drivers will be able to access the Cal Neva parking garage using Second Street to Lover’s Lane Alley.
All detours will be marked.
This project is part of a larger project called Reno Consolidated 19-01, which will reconstruct and rehabilitate select Reno roadways identified for improvement or maintenance.

To learn more, please visit detours map.

 

 

RENO CONSOLIDATED 19-02 PROJECT – NORTH HILLS BOULEVARD FROM GOLDEN VALLEY ROAD TO BUCK DRIVE AND THE INTERSECTION OF HUNTER LAKE DRIVE AT FOSTER DRIVE

North Hills Blvd:

  • Demolition, sidewalk and drainage work with one lane closure.
  • Two-way traffic maintained at all times.
  • Please share the road to bicyclists.
  • One lane-two way traffic with flaggers between Buck Dr. and Beckwourth Dr.
  • Between Beckwourth Dr. and Golden Valley Rd. traffic is shifted using the center turn lane as a travel lane.
  • Access to the mail drop boxes may be closed for pipe work across the driveways.

Hunter Lake/Foster Dr:

  • Construction to start on Monday September 9th.

 

 

RENO CONSOLIDATED 19-03 PROJECT – SIERRA HIGHLANDS DRIVE, COLBERT DRIVE, HAMMILL LANE, RALSTON STREET, AND OHM PLACE

Ralston Street between University Terrace and 11th Street; Starting August 5th at 7:00 am thru October 3rd construction will be in progress with concrete removal and replacement for sidewalk and curb/gutters; roadway reconstruction. Traffic controls in place along Ralston Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the Ralston Street construction zones from 7am-7pm, Monday through Friday from August 5th to the first of October. During construction, we will also provide access for trash pickup on Tuesdays – please place your Green Waste cans out on Tuesday for pickup. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions.

Ohm Place construction is schedule to begin Monday, 09/09, with partial cloure. Beginning the week of 09/16 full closure of Ohm Place will be in effect through the beginning of October.  Traffic controls will be in place with business detours for NV Energy offices.

 

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting September 16, 2019, at 7:00 a.m. through Saturday September 21, 2019:
Drivers can expect the following road and lane closures. All detours will be marked.

15th Street C Street to Prater Way:

  • Street will be closed to through traffic from C Street to Prater Way during raising utilities and striping. Northbound traffic will be detoured at C Street to 16th Street to Prater Way, or to at Victorian Avenue to Pyramid Way to Prater Way. Southbound traffic will be detoured at Prater Way to 16th Street to C Street or to Pyramid Way to Victorian Avenue. Businesses and residences within the closure will be provided southbound access from Prater Way and Northbound access from Victorian Avenue.
  • Franklin Way 15th Street C Street to Prater Way:
    Street will be closed to northbound traffic from Greg Street to Spice Island Drive during roadway removal.  Nouthbound traffic will be detoured at Spice Island Drive to Purina Way to Greg Street.

To learn more, please visit detours map.

 

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Starting September 16, 2019 construction will continue northward on the western side of Virginia Street to Vassar St from Plumb Ln
    • Between Plumb Ln and Stewart St traffic will be reduced to southbound only, northbound traffic will be detoured at Regency Way to Vassar St.
        • Martin (between Virginia St and Haskell St)
        • Arroyo (between Virginia St and Haskell St)
        • Cheney (between Virginia St and Center St)
        • Stewart Street (between Virginia St and Center St)
        • Caliente Street (between Virginia St and Haskell St)The following side streets are also under construction and closed to through traffic, local access is provided:

For the most up to date information on traffic control, please visit the Virginia Street Website.  

See weekly traffic report archive