Weekly Traffic Control Report

September 8, 2017

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

September 8, 2017

3:00 PM PST

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT

  • Construction is in progress. For current traffic information Click here.
  • Traffic control and work zones will be in place and changing frequently. Use caution and look for flaggers for direction. Expect traffic delays.


ANNUAL PAVEMENT PRESERVATION PROJECT

Various roads within the cities of Sparks, Reno and Washoe County. Traffic control will include isolated lane shifts and/or lane closures with possible flagger controls.

Saturday 9/9
Slurry Seal
Sparks Blvd: Baring Blvd to Pyramid Hwy

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy

Sunday 9/10
Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln

Monday 9/11
Slurry Seal
Sparks Blvd: Baring Blvd to Pyramid Hwy

Chip Seal
Lakeshore Blvd: Juanita Dr to Tahoe Blvd (SR 28) East
Incline Wy: Country Club Dr to Village Blvd
Country Club Dr: Lakeshore Dr to 2nd Tee Dr
Village Blvd: Lakeshore Blvd to Incline Wy
Southwood Blvd: Tahoe Blvd (SR 28) West to Tahoe Blvd (SR 28) East
Mays Blvd: Southwood Blvd to Lakeshore Blvd

Pavement Patching
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)

Lower Utilities
Montello St: Ninth St to Oddie Blvd
Lemmon Dr: Sky Vista Pkwy to Patrician Dr
Lear Blvd: Stead Blvd to Zeolite Dr (West)
Silver Lake Rd: Red Rock Rd to Stead Blvd
Echo Ave: Moya Blvd to Mt. Anderson St

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Highway
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy

Tuesday 9/12
Pavement Patching
Offenhauser Dr: Gateway Dr to Portman Ave
Gateway Dr: South Meadows Pkwy to Offenhauser Dr

Raise Utilities
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Plumb Ln: Hunter Lake Dr to Virginia St

Lower Utilities
Montello St: Ninth St to Oddie Blvd
Lemmon Dr: Sky Vista Pkwy to Patrician Dr
Lear Blvd: Stead Blvd to Zeolite Dr (West)
Silver Lake Rd: Red Rock Rd to Stead Blvd
Echo Ave: Moya Blvd to Mt. Anderson St

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy

Wednesday 9/13
Pavement Patching
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Raise Utilities
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Plumb Ln: Hunter Lake Dr to Virginia St

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Thursday 9/14
Slurry Seal
Country Club Dr: Mt. Rose Hwy (SR 431) to Lakeshore Blvd

Pavement Patching
Caughlin Pkwy: McCarran Blvd to Sierra Crest Way
Fourth St: McCarran Blvd to Keystone Ave

Raise Utilities
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Plumb Ln: Hunter Lake Dr to Virginia St

Lower Utilities
Lake St: Fourth St to Sixth St
Sinclair St: Liberty St to Mill St
West 3rd St: Sierra St to Vine St
Keystone Ave: California Ave to Interstate 80
Fourth St: McCarran Blvd to Keystone Ave

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Friday 9/15
Slurry Seal
College Dr: Village Blvd to Mt. Rose Hwy (SR 431)
Village Blvd: Lakeshore Blvd to Eagle Dr

Pavement Patching
Caughlin Pkwy: McCarran Blvd to Sierra Crest Way
Fourth St: McCarran Blvd to Keystone Ave

Raise Utilities
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
Plumb Ln: Hunter Lake Dr to Virginia St

Pavement Striping (7:00 PM to 5:00 AM)
Sparks Blvd: Baring Blvd to Pyramid Hwy
Plumas St: McCarran Blvd to Plumb Ln
Moana Ln: Plumas St to Baker Ln
Arlington Ave: Skyline Blvd to Plumb Ln
South Meadows Pkwy: Gateway Dr to Wilbur May Pkwy
Double Diamond Pkwy: Double R Blvd (N) to Double R Blvd (S)
Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy
Country Club Dr: Mt. Rose Hwy (SR 431) to Lakeshore Blvd
College Dr: Village Blvd to Mt. Rose Hwy (SR 431)
Village Blvd: Lakeshore Blvd to Eagle Dr


PYRAMID WAY AND MCCARRAN BLVD INTERSECTION PROJECT

  • Construction is in progress. For current traffic information Click here.
  • Traffic control and work zones will be in place and changing frequently. Use caution and look for flaggers for direction. Expect traffic delays.


SOUTHEAST CONNECTOR PROJECT

From Pembroke Dr to South Meadows Pkwy and Veterans Pkwy (4.5 miles)

  • Flaggers may be located at Mira Loma Dr and Pembroke Dr to control vehicular traffic. Flaggers will stop traffic for short durations to allow construction vehicles to cross Mira Loma Dr and Pembroke Dr.
  • Be aware and pay attention to the traffic control signs. Lane reductions are in place at the intersection of South Meadows Pkwy and Veterans Pkwy. Brief delays are expected.

 

See weekly traffic report archive