Weekly Traffic Control Report

October 31, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM

RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

 

Monday 11/4/2019

Pavement Crack Sealing

Village Parkway: Cold Springs Drive to Cody Court

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)

Greg Street: Franklin Way to I-80 Right of Way

Seventh Street: Genoa Avenue to Elgin Avenue

 

Tuesday 11/5/2019

Pavement Crack Sealing

Village Parkway: Cold Springs Drive to Cody Court

 

Wednesday 11/6/2019

Pavement Crack Sealing

Ingenuity Avenue: Pyramid Highway to Hawco Court

Hawco Court: Ingenuity Avenue to End of Pavement

Digital Court: Ingenuity Avenue to End of Pavement

Isidor Court: Circuit Court to Academy Way

Distribution Drive: West Calle De La Plata to Isidor Court

Circuit Court: Isidor Court to End of Pavement

Inventors Place: Isidor Court to End of Pavement

Utility Adjustments

Los Altos Parkway: Vista Boulevard (South) to Goodwin Road

 

Thursday 11/7/2019

Pavement Crack Sealing

Ingenuity Avenue: Pyramid Highway to Hawco Court

Hawco Court: Ingenuity Avenue to End of Pavement

Digital Court: Ingenuity Avenue to End of Pavement

Isidor Court: Circuit Court to Academy Way

Distribution Drive: West Calle De La Plata to Isidor Court

Circuit Court: Isidor Court to End of Pavement

Inventors Place: Isidor Court to End of Pavement

Utility Adjustments

Los Altos Parkway: Vista Boulevard (South) to Goodwin Road

 

Friday 11/8/2019

Pavement Crack Sealing

Disc Drive: Vista Boulevard to Sparks Boulevard

Sullivan Lane: Prater Way to El Rancho Boulevard

Wedekind Road: Sutro Street to El Rancho Drive

Baring Boulevard: McCarran Boulevard to Vista Boulevard

Greenbrae Drive: 4th Street to Stanford Way

Prater Way: Pyramid Highway to Northern Nevada Medical Center

Utility Adjustments

Los Altos Parkway: Vista Boulevard (South) to Goodwin Road

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The road is open with no controls.  Signal work that remains will occur later this year and may require traffic control for a short period of time.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

  • New traffic signal at the intersection of N Virginia Street and Lemmon Drive.
  • Construction is on hold until signal equipment arrives in November.

 

RENO CONSOLIDATED 19-01 – SUTRO STREET, LAKE STREET, FIRST STREET AND STATE STREET

RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Monday, Nov. 4 through Friday, Nov. 8:

  • Sutro Street will be closed to northbound traffic from E. Commercial Row to 4th Street. Southbound traffic will remain open. Northbound traffic will be detoured at E. Commercial Row to Sage Street to 4th Street.

Friday, Nov. 8 at 6 p.m. through Monday, Nov. 11 at 5 a.m.:

  • Sutro Street will be closed from Kuenzli Street to 4th Street. Access to the Waste Management Sage Transfer Station will be maintained by detouring from 4th Street to Sage Street to E. Commercial Row. Northbound traffic will be detoured on Kirman Avenue to Kuenzli Street to Wells Avenue. Southbound traffic will be detoured at 6th Street to Wells Avenue.

 

These closures are in place for safety and so that the RTC can remove the existing roadway and repave it.

This project is part of a larger project called Reno Consolidated 19-01, which will reconstruct and rehabilitate select Reno roadways identified for improvement or maintenance.

 

RENO CONSOLIDATED 19-02 PROJECT – NORTH HILLS BOULEVARD FROM GOLDEN VALLEY ROAD TO BUCK DRIVE AND THE INTERSECTION OF HUNTER LAKE DRIVE AT FOSTER DRIVE

RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

North Hills Boulevard:

  • Paving operations on Thursday 10/31 thru Saturday 11/02 (Temperature dependent) southbound lane closure between Round Table Pizza driveway and Buck Drive. Only northbound traffic allowed.
  • Paving will start at 8:30 am and will last until 8:00 pm (approximately) each day.

 

  • Lane closures on Golden Valley Road will be minimized as much as possible. The contractor will schedule operations to avoid working at the intersection as school is letting out in the afternoon.
  • Signal timing adjustments have been made to help minimize congestion.
  • Traffic Control will continue as it has been.

 

  • Between Golden Valley Road and Beckwourth Drive:
    • Two-way traffic remains in this segment and will be flagger controlled during construction hours.
    • Traffic is shifted using the center turn lane as a travel lane.
    • Please use caution and share the road with bicyclists.
  • Between Beckwourth Drive and Buck Drive:
    • Detours in place. Southbound lane closure. Only northbound traffic allowed.
    • Northbound traffic is flagger controlled during construction hours approximately 7 am to 5 pm, Monday thru Saturday.
    • Speed limit reduced to 25 MPH and traffic will be allowed on pulverized material (unpaved lane). Watch for construction equipment during construction hours.

Hunter Lake/Foster Drive:

  • Construction is substantially complete.
  • Traffic Control has been removed.

 

RENO CONSOLIDATED 19-03 PROJECT – SIERRA HIGHLANDS DRIVE, COLBERT DRIVE, HAMMILL LANE, RALSTON STREET, AND OHM PLACE

RTC Project Manager, Warren Call, P.E. – (775) 335-1881

Ralston Street:

  • Between University Terrace and 11th Street – roadwork is substantially complete.  Watch for flaggers and traffic controls that may be used for punch list work.

Ohm Place:

  • Roadwork is substantially complete.  Watch for flaggers and traffic controls that may be used for punch list work.

Sierra Highlands:

  • Roadwork is substantially complete.  Watch for flaggers and traffic controls that may be used for punch list work.

Hammil Lane:

  • Construction is in progress and will continue thru the end of October.  Pavement removal will occur on Wednesday and Thursday.  Watch for flaggers and traffic controls that will be in place throughout construction.

Colbert Drive:

  • Construction is underway on Colbert Drive from Longley Lane to 500 feet north on Colbert Drive.  pavement removal will occur on Monday and Tuesday.  Watch for flaggers and traffic controls that will be in place throughout construction.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

Roadway closures will be in place for construction of the roundabout at the intersections of Virginia Street and Center Street/Mary Street. Businesses will always remain accessible.

Virginia Street:

  • Regency Wy to Center St – traffic is reduced to southbound direction only.
  • Northbound through traffic is detoured from Regency Wy to Holcomb Ave to Center St to Liberty St. Drivers can also use northbound Haskell St to Martin St to Virginia St. Two-way traffic is available north of Center St.
  • Northbound traffic with the final destination within the construction zone can utilize one of the many sidestreets from Holcomb Ave, Lake St, or Haskell St, which include:
    • Continental Dr, Regency Wy, Walts Ln, Mt Rose St, Pueblo St, Arroyo St, Caliente St, Vassar St, Martin St, Taylor St, Cheney St, St Lawerance Ave, Moran St, and Stewart St.

Center Street and Mary Street at Virginia Street:

  • ROAD CLOSURE: Work in this area will require closure of either Center St or Mary St at Virginia St. During limited instances both streets may be closed at the same time.
  • Detours will be in place.

For the most up to date information on traffic control, please visit the Virginia Street Website.  

See weekly traffic report archive