2023 BRIDGE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
The Vine Street Bridge will be closed through Friday, November 24. Detour routes are marked in the area.
2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.
Monday 11/20/2023
Crack Seal 7pm – 7am
Depaoli Street: Fifth Street to Tacchino Street
Tacchino Street: Depaoli Street to Fourth Street
Ferrari Street: Fourth Street to Fifth Street
Fifth Street: Ferrari Street to End
Kirman Avenue: Kuenzli Street to Ryland Street
Ryland Street: Holcomb Avenue to Kirman Avenue
Mill Street: Wells Avenue to Terminal Way
Redwood Place: Market Street to Mill Street
Louise Street: Market Street to Mill Street
Market Street: Villanova Drive to Kietzke Lane
Automotive Way: Kietzke Lane to Market Street
Yale Way: Harvard Way to Market Street
Pacific Avenue: S 21st Street to S 19th Street
Harvard Way: Linden Street to Vassar Street
Matley Lane: Vassar Street to Mill Street
Bible Way: Vassar Street to Mill Street
Telegraph Street: Vassar Street to Greg Street
Condor Way: Airmotive Way to End
S Rock Boulevard: Glendale Avenue to Bridge
Marietta Way: Glendale Avenue to End
Veterans Parkway: Geiger Grade to South Meadows Parkway
Mira Loma Drive: Air Center Circle to Herons Landing
Neil Road: Kietzke Lane to McCarran Boulevard
Campus Way: Sierra Center Parkway to Neil Road
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard
Del Monte Lane: Bonde Lane to Kietzke Lane
South Meadows Parkway: Gateway Drive to Echo Valley Parkway
S 18th Street: Glendale Avenue to Crane Way
S 21st Street: Greg Street to Pacific Avenue
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
S 19th Street: Alley to Pacific Avenue
Utility Adjustment
Thomas Creek Road: Zolezzi Lane to Mt. Rose Highway
Foothill Road: Thomas Creek Road to Virginia Street
Joule Street: Rock Boulevard to Edison Way
Plumb Lane: McCarran Boulevard to Orange Lane
Longley Lane: Virginia Street to Rock Boulevard
Talbot Lane: Sierra Rose Drive to Redfield Parkway
Reno Corporate Drive: Double R Boulevard to Barron Way
Patriot Boulevard: Virginia Street to Colbert Lane
Tuesday 11/21/2023
Crack Seal 7pm – 7am
Depaoli Street: Fifth Street to Tacchino Street
Tacchino Street: Depaoli Street to Fourth Street
Ferrari Street: Fourth Street to Fifth Street
Fifth Street: Ferrari Street to End
Kirman Avenue: Kuenzli Street to Ryland Street
Ryland Street: Holcomb Avenue to Kirman Avenue
Mill Street: Wells Avenue to Terminal Way
Redwood Place: Market Street to Mill Street
Louise Street: Market Street to Mill Street
Market Street: Villanova Drive to Kietzke Lane
Automotive Way: Kietzke Lane to Market Street
Yale Way: Harvard Way to Market Street
Pacific Avenue: S 21st Street to S 19th Street
Harvard Way: Linden Street to Vassar Street
Matley Lane: Vassar Street to Mill Street
Bible Way: Vassar Street to Mill Street
Telegraph Street: Vassar Street to Greg Street
Condor Way: Airmotive Way to End
S Rock Boulevard: Glendale Avenue to Bridge
Marietta Way: Glendale Avenue to End
Veterans Parkway: Geiger Grade to South Meadows Parkway
Mira Loma Drive: Air Center Circle to Herons Landing
Neil Road: Kietzke Lane to McCarran Boulevard
Campus Way: Sierra Center Parkway to Neil Road
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard
Del Monte Lane: Bonde Lane to Kietzke Lane
South Meadows Parkway: Gateway Drive to Echo Valley Parkway
S 18th Street: Glendale Avenue to Crane Way
S 21st Street: Greg Street to Pacific Avenue
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
S 19th Street: Alley to Pacific Avenue
Utility Adjustment
Thomas Creek Road: Zolezzi Lane to Mt. Rose Highway
Foothill Road: Thomas Creek Road to Virginia Street
Joule Street: Rock Boulevard to Edison Way
Plumb Lane: McCarran Boulevard to Orange Lane
Longley Lane: Virginia Street to Rock Boulevard
Talbot Lane: Sierra Rose Drive to Redfield Parkway
Reno Corporate Drive: Double R Boulevard to Barron Way
Patriot Boulevard: Virginia Street to Colbert Lane
Wednesday 11/22/2023
Crack Seal 7pm – 7am
Depaoli Street: Fifth Street to Tacchino Street
Tacchino Street: Depaoli Street to Fourth Street
Ferrari Street: Fourth Street to Fifth Street
Fifth Street: Ferrari Street to End
Kirman Avenue: Kuenzli Street to Ryland Street
Ryland Street: Holcomb Avenue to Kirman Avenue
Mill Street: Wells Avenue to Terminal Way
Redwood Place: Market Street to Mill Street
Louise Street: Market Street to Mill Street
Market Street: Villanova Drive to Kietzke Lane
Automotive Way: Kietzke Lane to Market Street
Yale Way: Harvard Way to Market Street
Pacific Avenue: S 21st Street to S 19th Street
Harvard Way: Linden Street to Vassar Street
Matley Lane: Vassar Street to Mill Street
Bible Way: Vassar Street to Mill Street
Telegraph Street: Vassar Street to Greg Street
Condor Way: Airmotive Way to End
S Rock Boulevard: Glendale Avenue to Bridge
Marietta Way: Glendale Avenue to End
Veterans Parkway: Geiger Grade to South Meadows Parkway
Mira Loma Drive: Air Center Circle to Herons Landing
Neil Road: Kietzke Lane to McCarran Boulevard
Campus Way: Sierra Center Parkway to Neil Road
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard
Del Monte Lane: Bonde Lane to Kietzke Lane
South Meadows Parkway: Gateway Drive to Echo Valley Parkway
S 18th Street: Glendale Avenue to Crane Way
S 21st Street: Greg Street to Pacific Avenue
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
S 19th Street: Alley to Pacific Avenue
Utility Adjustment
Thomas Creek Road: Zolezzi Lane to Mt. Rose Highway
Foothill Road: Thomas Creek Road to Virginia Street
Joule Street: Rock Boulevard to Edison Way
Plumb Lane: McCarran Boulevard to Orange Lane
Longley Lane: Virginia Street to Rock Boulevard
Talbot Lane: Sierra Rose Drive to Redfield Parkway
Reno Corporate Drive: Double R Boulevard to Barron Way
Patriot Boulevard: Virginia Street to Colbert Lane
4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
The project is substantially complete. Minor punch list work will be taking place off the roadway.
LAS BRISAS AND LOS ALTOS RESURFACING PROJECT
RTC Project Manager, Jessica Dover, P.E. – (775) 335-1831
Work on Los Altos Parkway is ongoing. Drivers can anticipate lane closures and detours during construction. Business access will be maintained at all times.
Las Brisas Boulevard between Robb Drive and McCarran Boulevard
Robb Drive to McCarran Boulevard – Work on Las Brisas Boulevard (Brittania Drive to McCarran Boulevard) will resume in Spring 2024.
Los Altos Parkway between North Vista Boulevard and South Vista Boulevard
Contractor will be on site to complete minor work items throughout December 2023. Two-way traffic will be maintained.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
Phase 1 – Pyramid Way to Sullivan Lane (Sparks):
- Construction is complete. Minor punch item list work will take place.
Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):
- Construction crews are removing/replacing concrete median.
- Two-way traffic (one lane in each direction)
- Intermittent lane shifts for median work.
Phase 3 – east of US 395 Ramps to Sutro Street (Reno):
- Construction crews are removing/replacing concrete median.
- NEW TRAFFIC PATTERN:
- Intermittent lane shifts for median work.
- Two-way traffic (one lane in each direction)
- Montello Street intersection will be OPEN before Thanksgiving. Traffic signal power shut down. Detours are in place.
Phase 4 – Sutro Street to I-80 Ramps (Reno):
- Ongoing underground work.
- Lane closures. One lane in each direction.
For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com
PYRAMID WAY AND NORTH MCCARRAN BOULEVARD FIBER CONNECTIVITY
RTC Project Manager, Alex Wolfson, P.E. – (775) 335-1880
The following nightly work will occur between 9:00 p.m. and 5:30 a.m., Sunday nights through Friday mornings.
- Lane closures on Pyramid Way northbound between Nugget Avenue and C Street
- Lane closure on the Interstate 80 eastbound off-ramp to Pyramid Way.
- Periodic closures of Victorian Avenue on the east side of the Pyramid Way intersection; a signed detour will be provided.
In addition, shoulder and bike lane closures on North McCarran Boulevard westbound between North Rock Boulevard and Sullivan Lane during daytime hours.
SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
Lane and shoulder closures will be in place.