Weekly Traffic Control Report

May 2, 2019

GREEN BIKE STAMP ENHANCEMENTS
Green pavement markings for bicycle facility enhancements.

Night Work 8 pm – 6 am with minimal lane and shoulder closures.

Thursday 5/2
Veterans Pkwy at Steamboat Pkwy
S Meadows Pkwy at Double R Blvd

Sunday 5/5
Thomas Creek Rd
S Virginia St at Huffaker Ln
S Virginia at Neil Rd
Virginia St at Sierra Center Pkwy

Monday 5/6
Peckham Ln at Longely Ln
Victorian/Nichols Cycle Track
Lincoln Wy at Legends RAB
Lincoln Wy at Legends Bay
White Lake Pkwy at Crystal Canyon Blvd

TRAFFIC ENGINEERING SPOT 7 – PACKAGE 2

Monday 5/20  –  Friday 5/24
Slurry and striping work:
Victorian Ave at 11th St and 14th St: lane closures
Vista at Prater: lane closures

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

  • NV Energy Gas will be performing gas line lowering work within the vicinity of Virginia St.

For the most up to date information on traffic control, please visit the Virginia Street WebsiteThe next phase of construction, which includes reconstructing the roadway and sidewalks, is scheduled to start in Summer 2019.

See weekly traffic report archive