Weekly Traffic Control Report

May 9, 2019

CLEAN WATER WAY
From McCarran Blvd to Truckee Meadows Water Reclamation Facility (TMWRF)

Roadway reconstruction will begin Monday, May 13.  Traffic Controls will be in place on McCarran Blvd and Clean Water Wy, with traffic down to one lane on Clean Water Wy with flagger controls.

Use caution when traveling through the construction work zone, expect delays.

 

GREEN BIKE STAMP ENHANCEMENTS
Green pavement markings for bicycle facility enhancements.

Project complete.

 

TRAFFIC ENGINEERING SPOT 7 – PACKAGE 2

Monday 5/20  –  Friday 5/24
Slurry and striping work:
Victorian Ave at 11th St and 14th St: lane closures
Vista at Prater: lane closures

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

  • NV Energy Gas will be performing gas line lowering work within the vicinity of Virginia St.

For the most up to date information on traffic control, please visit the Virginia Street WebsiteThe next phase of construction, which includes reconstructing the roadway and sidewalks, is scheduled to start in Summer 2019.

See weekly traffic report archive