BUS STOP IMPROVEMENT AND CONNECTIVITY PROGRAM – PHASE 3 PROJECT
RTC Project Manager, Sara Going, P.E. – (775) 335-1897
RTC’s contractor, Sierra Nevada Construction, will be working on sidewalks and bus pads at the following locations:
- W 4th Street and Keystone Avenue
- E 2nd Street and Park Street
- Mill Street and Kirman Avenue (Renown)
- Valley Road and Highland Avenue
- Wedekind Road and Community Garden Apartments
Drivers should expect lane and shoulder closures at these locations. Pedestrian detours will be provided and temporary alternative bus stops will be available to transit riders.
GOLDEN VALLEY AT BECKWOURTH – TRAFFIC SIGNAL PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871
Construction will begin March 7, 2022.
LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
For additional information on construction status, visit the Project website at http://northvalleysimprovements.com/lemmon-drive/.
MILL STREET COMPLETE STREET – 1-580 to MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Spanish Springs Construction continues work on the south side of Mill Street between McCarran Boulevard and Rock Boulevard. The two right eastbound lanes will be closed and eastbound traffic will be reduced to one lane. Business and side street access will be maintained.
Electrical work between Telegraph Street and Rock Boulevard is also taking place. The outside eastbound lane will be closed to accommodate that work.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
El Rancho Drive – Greenbrae Drive to Oddie Boulevard (Sparks)
- Construction work is in progress and expected to continue until mid-March – removing and replacing median.
- One lane in each direction will be maintained.
- Access will be maintained, but alternate routes are recommended.
Phase 1: Pyramid Way to Sullivan Lane (Sparks)
- Drivers may see intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
- Construction crews are doing underground electrical work, excavating/forming/building/backfilling (front and back) retaining walls.
- Median removal and patching.
One lane in each direction will be maintained along Oddie Boulevard. For additional information on construction status and time-lapse pictures, visit the Project website at Oddiewellsproject.com.
RENO CONSOLIDATED 20-01 – MAYBERRY DRIVE, CALIFORNIA AVENUE, FIRST STREET
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
California Avenue – Hunter Lake Drive to Booth Street
RTC will rehabilitate the roadway, make ADA improvements, create bicycle and pedestrian connectivity, add and maintain sidewalks, and improve safety. At the California Avenue/Mayberry Drive intersection, the RTC plans to reconfigure it to a four-way intersection with crosswalks, use roadway geometrics to slow traffic entering the neighborhood, and create fewer conflict points between pedestrians, bicycles and cars, creating a safer roadway and improve ADA access to the Route 16 transit stops on California Avenue near Arbutus Street and Hunter Lake Drive.
Mayberry Drive – Memory Lane to California Avenue
RTC plans to reconfigure it to a four-way intersection with crosswalks, use roadway geometrics to slow traffic entering the neighborhood, and create fewer conflict points between pedestrians, bicycles and cars, creating a safer roadway. Also, rehabilitate the roadway and maintain sidewalk connectivity and existing bike lanes.
Drivers can expect lane closures and detours as the project progresses.
TE SPOT 10 – FUEL TAX
RTC Project Manager, Sara Going, P.E. – (775) 335-1897
No work scheduled. Construction will continue mid-March 2022.
TE SPOT 10 – NORTH
RTC Project Manager, Andrew Jayankura, P.E., PTOE – (775) 332-2139
Construction will be postponed until next spring for pavement slurry seal. The intersection is open for normal operations.
New roadway configuration in place. Please use caution driving through the intersection.