Weekly Traffic Control Report

March 25, 2022

BUS STOP IMPROVEMENT AND CONNECTIVITY PROGRAM  – PHASE 3 PROJECT
RTC Project Manager, Sara Going, P.E. – (775) 335-1897

RTC’s contractor, Sierra Nevada Construction, will be working on sidewalks and bus pads at the following locations:

  • York Way and Rock Boulevard
  • Rock Boulevard and Vance Way
  • York Way and 4th Street
  • Glendale Avenue and Summit Racing
  • Greg Street and Deming Way
  • Greg Street and Linda Way
  • Greg Street and Marietta Way

Drivers should expect lane and shoulder closures at these locations. Pedestrian detours will be provided and temporary alternative bus stops will be available to transit riders.

 

GOLDEN VALLEY AT BECKWOURTH – TRAFFIC SIGNAL PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

There will be intermittent lane, shoulder and sidewalk closures for signal pole installation.

 

KINGS ROW REHABILITATION PROJECT – PHASE 2 – WYOMING AVENUE TO MCCARRAN BOULVARD
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

  • Message boards and other traffic control equipment will begin mobilizing to the area the week of March 28, 2022.
  • Work activities are planned to start the week of April 4, 2022.

 

LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

For additional information on construction status, visit the Project website at http://northvalleysimprovements.com/lemmon-drive/.

 

MILL STREET COMPLETE STREET – 1-580 to MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Spanish Springs Construction continues work on the south side of Mill Street between McCarran Boulevard and Telegraph.  The two right eastbound lanes will be closed and eastbound traffic will be reduced to one lane.  Business and side street access will be maintained.

 

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

El Rancho Drive – Greenbrae Drive to Oddie Boulevard (Sparks):

  • Construction work is in progress and expected to continue until mid-April.
  • One lane in each direction will be maintained.
  • Access will be maintained, but alternate routes are recommended.
  • Detours in place starting on March 28 – April 1, 2022 – Roadwork activities.

Phase 1: Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see intermittent daily shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Construction crews are doing drainage work, median patching, privacy screens’ footing excavation and install/pour posts, and panels.
  • Roadwork activities:
    • Temporary striping for “Traffic Swap” (Oddie Boulevard westbound traffic will be shifted to the eastbound lanes.)
  • Lane closures on Pyramid Way from J Street to I Street starting March 28 – April 8, 2022 from 9:00 a.m. – 4:00 p.m.

One lane in each direction will be maintained along Oddie Boulevard.  For additional information on construction status and time-lapse pictures, visit the Project website at http://Oddiewellsproject.com. 

 

RENO CONSOLIDATED 20-01 – MAYBERRY DRIVE, CALIFORNIA AVENUE, FIRST STREET
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

California Avenue – Hunter Lake Drive to Booth Street

California Avenue to westbound traffic between Booth Street and Mayberry Drive will  be closed. Westbound traffic will be detoured at Booth Street to Foster Drive to Hunter Lake Drive to allow the contractor to complete water line adjustments that must be done prior to the roadway work.

Mayberry Drive – Memory Lane to California Avenue

RTC plans to reconfigure it to a four-way intersection with crosswalks, use roadway geometrics to slow traffic entering the neighborhood, and create fewer conflict points between pedestrians, bicycles and cars, creating a safer roadway. Also, rehabilitate the roadway and maintain sidewalk connectivity and existing bike lanes.

 

TE SPOT 10 – FUEL TAX
RTC Project Manager, Sara Going, P.E. – (775) 335-1897

Work will resume on the TE Spot 10 – Fuel Tax Project at the following locations:

Steamboat Parkway & Horse Ranch Road
Sparks Boulevard and Ion Drive
Victorian Avenue and 16th Street

Drivers should expect temporary lane and shoulder closures at these locations. Pedestrian detours may be present as crews complete sidewalk and striping at pedestrian crossings.

 

TE SPOT 10 – NORTH
RTC Project Manager, Andrew Jayankura, P.E., PTOE – (775) 332-2139

Construction to resume in early May for roadway slurry seal and striping.

The intersection is open for normal operations. New roadway configuration in place.  Please use caution driving through the intersection.

See weekly traffic report archive