Weekly Traffic Control Report

June 14, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Friday 6/14
Pavement Crack Sealing
Toll Rd: Geiger Grade Rd to Ravazza St
Wedge Pkwy: De Spain Ln to Mt Rose Hwy
Zolezzi Ln: Arrowcreek Pkwy to Roundabout
Maestro Dr: Colbert Dr to Double R Blvd
Sierra Center Pkwy: Virginia St to Maestro Dr
Campus Wy: Sierra Center Pkwy to Neil Rd
Mira Loma Dr: McCarran Blvd to Heron’s Landing
Mira Loma Dr: Aircenter Circle to Longley Ln

Monday 6/17
Pavement Crack Sealing
Eagle Canyon Dr: Pyramid Hwy to Calle De La Plata
Lazy 5 Pkwy: Pyramid Hwy to David Allen Pkwy
David Allen Pkwy: Kiley Pkwy to Fortunato Loop
El Rancho Dr: Clear Acre Ln to Moorpark Ct
Veterans Pkwy: Truckee River Bridge to Clean Water Bridge

Pavement Patching
Vista Blvd: Brierley Wy to Wingfield Pkwy
Los Altos Pkwy: Vista Blvd to Promedio Pkwy

Tuesday 6/18
Pavement Crack Sealing
Eagle Canyon Dr: Pyramid Hwy to Calle De La Plata
Lazy 5 Pkwy: Pyramid Hwy to David Allen Pkwy
David Allen Pkwy: Kiley Pkwy to Fortunato Loop
El Rancho Dr: Clear Acre Ln to Moorpark Ct
Veterans Pkwy: Truckee River Bridge to Clean Water Bridge

Pavement Patching
Rock Blvd: Glendale to Truckee River Bridge
Telegraph St: Vassar St to Greg St
Mill St: Lake St to Matley Ln
Mira Loma Dr: McCarran Blvd to Heron’s Landing
Mira Loma Dr: Aircenter Cir to Longley Ln

Wednesday 6/19
Pavement Crack Sealing
Eagle Canyon Dr: Pyramid Hwy to Calle De La Plata
Lazy 5 Pkwy: Pyramid Hwy to David Allen Pkwy
David Allen Pkwy: Kiley Pkwy to Fortunato Loop
El Rancho Dr: Clear Acre Ln to Moorpark Ct
Veterans Pkwy: Truckee River Bridge to Clean Water Bridge

Pavement Patching
Mira Loma Dr: McCarran Blvd to Heron’s Landing
Mira Loma Dr: Aircenter Cir to Longley Ln
Sierra Center Pkwy: Virginia St to Maestro Dr
Campus Wy: Sierra Center Pkwy to Neil Rd

Thursday 6/20
Pavement Crack Sealing
Eagle Canyon Dr: Pyramid Hwy to Calle De La Plata
Lazy 5 Pkwy: Pyramid Hwy to David Allen Pkwy
David Allen Pkwy: Kiley Pkwy to Fortunato Loop
El Rancho Dr: Clear Acre Ln to Moorpark Ct
Veterans Pkwy: Truckee River Bridge to Clean Water Bridge

Pavement Patching
Sierra Center Pkwy: Virginia St to Maestro Dr
Maestro Dr: Colbert Dr to Double R Blvd

Friday 6/21
Pavement Crack Sealing
Eagle Canyon Dr: Pyramid Hwy to Calle De La Plata
Lazy 5 Pkwy: Pyramid Hwy to David Allen Pkwy
David Allen Pkwy: Kiley Pkwy to Fortunato Loop
El Rancho Dr: Clear Acre Ln to Moorpark Ct
Veterans Pkwy: Truckee River Bridge to Clean Water Bridge

Pavement Patching
South Meadows Pkwy: Gateway Dr to Veterans Pkwy

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT
From Newlands Circle to Booth Street

Starting Wednesday, June 12, 2019, at 6:00 a.m. through mid-July 2019:

  • California Ave will reopen to traffic in both directions in the construction zone.
  • Booth St will be closed in both directions from California Ave to Foster Dr during this same time period.
  • Keystone Ave will also remain closed to northbound traffic from Booth St to Riverside Dr.
  • Keystone Ave will not be accessible from California Ave.

Detours will be in place during construction. For safety reasons, there is no pedestrian access through California Ave from Newlands Cir to Booth St during construction.

In mid-July, the California Avenue/Keystone Avenue intersection will return to a full closure so crews can finish construction before Reno High School is back in session.

 

CLEAN WATER WAY
From McCarran Blvd to Truckee Meadows Water Reclamation Facility (TMWRF)

Road construction is complete.  No traffic controls are in place.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
Construction starts June 17, 2019.

  • Between Plumb Ln and Mt. Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Wells Ave to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    •  Moran (between Virginia St and Center St)
    • East Taylor (between Virginia St and Center St)
    • Martin (between Virginia St and Haskell St)
    • Caliente (between Virginia St and Haskell St)
  • NV Energy Gas will be performing gas line lowering work within the vicinity of Virginia St.

For the most up to date information on traffic control, please visit the Virginia Street WebsiteThe next phase of construction, which includes reconstructing the roadway and sidewalks, is scheduled to start in Summer 2019.

See weekly traffic report archive