Weekly Traffic Control Report

June 30, 2023

2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Wednesday 7/5/2023
Micro-Surfacing (Slurry)
South Verdi Road: Bridge Street to Garson Road
Wedekind Road: Sutro Street to City Limits
Talbot Lane: End of Cul de Sac to Redfield Parkway
Lymberry Street: Moana Lane to Cadillac Place

Pavement Striping 7pm – 7am
South Verdi Road: Ridge Street to Garson Road
Wedekind Road: Sutro Street to End of City Limits
Talbot Lane: South End of Cul de Sac to Redfield Parkway
Lymberry Street: Moana Lane to Cadillac Place

Thermoplastic
Quail Manor Court: Airway Drive to End
Double Eagle Court: Gateway Drive to End
Wrondel Way: Hubbell Way to Apple Street
Villanova Drive: Harvard Way to Market Street
Technology Way: Double R Boulevard to Double Diamond Parkway
Kuenzli Street: Kietzke Lane to Sunshine Lane
Gould Street: Mill Street to Second Street
Giroux Street: Kuenzil Street to End
Ridgeview Drive: Plumas Street to Lakeside Drive
Prosperity Street: Kietzke Lane to Golden Lane
Linden Street: Kietzke Lane to Harvard Way
Lewis Street: Golden Lane to End

Thursday 7/6/2023
Micro-Surfacing (Slurry)
Greenbrae Drive: 4th Street to Stanford Way
Wedekind Road: Malapi Way to Malapi Way
Seventh Avenue: Tassel Drive to Sun Valley Boulevard
E Prater Way: Stanford Way to Sparks Boulevard

Pavement Striping 7pm – 7am
Greenbrae Drive: 4th Street to Stanford Way
Wedekind Road: Malapi Way too Malapi Way
Seventh Avenue: Tassel Drive to Sun Valley Boulevard
E Prater Way: Stanford Way to Sparks Boulevard

Thermoplastic
Quail Manor Court: Airway Drive to End
Double Eagle Court: Gateway Drive to End
Wrondel Way: Hubbell Way to Apple Street
Villanova Drive: Harvard Way to Market Street
Technology Way: Double R Boulevard to Double Diamond Parkway
Kuenzli Street: Kietzke Lane to Sunshine Lane
Gould Street: Mill Street to Second Street
Giroux Street: Kuenzil Street to End
Ridgeview Drive: Plumas Street to Lakeside Drive
Prosperity Street: Kietzke Lane to Golden Lane
Linden Street: Kietzke Lane to Harvard Way
Lewis Street: Golden Lane to End

Friday 7/7/2023
Micro-Surfacing (Slurry)
E Prater Way: Stanford Way to Sparks Boulevard
Golden Valley Road: Marlin Drive to Spearhead

Pavement Striping 7pm – 7am
E Prater Way: Stanford Way to Sparks Boulevard
Golden Valley Road: Marlin Drive to Spearhead Way

Thermoplastic
Quail Manor Court: Airway Drive to End
Double Eagle Court: Gateway Drive to End
Wrondel Way: Hubbell Way to Apple Street
Villanova Drive: Harvard Way to Market Street
Technology Way: Double R Boulevard to Double Diamond Parkway
Kuenzli Street: Kietzke Lane to Sunshine Lane
Gould Street: Mill Street to Second Street
Giroux Street: Kuenzil Street to End
Ridgeview Drive: Plumas Street to Lakeside Drive
Prosperity Street: Kietzke Lane to Golden Lane
Linden Street: Kietzke Lane to Harvard Way
Lewis Street: Golden Lane to End

Saturday 7/8/2023
Micro-Surfacing (Slurry)
Cola Court: Cul de Sac to Vista Boulevard
Loop Road: Vista Boulevard to Horsemens Park
Packer Way: Cul de Sac to Glendale Avenue
Salomon Circle: Loop Road to End of Pavement
S Stanford Way: Glendale Avenue to S McCarran Boulevard

Pavement Striping 7pm – 7am
Cola Court: Cul de Sac to Vista Boulevard
Loop Road: Vista Boulevard to Horsemens Park
Packer Way: Cul de Sac to Glendale Avenue
Salomon Circle: Loop Road to End of Pavement
S Standford Way: Glendale Avenue to S McCarran Boulevard

4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

Construction of the westbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.

Mesa Park Road from W. 4th Street to 500 feet north remains closed and the closure has been extended through mid-July while construction of the following occurs:

  • 4th Street westbound lanes and islands
  • Northern portion of the roundabout

The project is anticipated to be completed by the end of August 2023.
For more information, visit https://www.4th-woodland-roundabout.com/

ARROWCREEK PARKWAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844

Lane and shoulder closures will be in place on Arrowcreek Parkway, S. Virginia Street, and Damonte Ranch Parkway. Traffic delays may occur.

CALIFORNIA AVE. RECONSTRUCTION-NEWLANDS CIRCLE TO ARLINGTON PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Construction begins Monday June 19, 2023.  Contractor is currently planning to maintain two-way traffic but expect delays.

HOLCOMB AVENUE REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Construction crews working on the pavement removal (cold milling) and permanent pavement patching on Holcomb Avenue between Burns Street and Liberty Street commencing after the July 4th holiday. Traffic on Holcomb will be shifted and one lane of traffic in each direction will be maintained.

Sinclair Street will remain closed between the Sinclair/Thoma Intersection and the Sinclair/Holcomb Intersection for reconfiguration and full depth reconstruction.

Parking on street will be limited within areas of improvements and driveways will be temporarily impacted during construction. Short traffic delays and detours may occur.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139

Minor shoulder closures may occur for final construction items.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • One traffic lane in each direction will be maintained along Oddie Boulevard.
  • Construction crews finishing work on center median (concrete) and landscaping.

Phase 2 & 3 – Sullivan Lane (Sparks) to Sutro Street (Reno):

  • One traffic lane in each direction will be maintained along Oddie Boulevard.
  • Intermittent traffic lane shifts during construction hours.
  • Paving operations work starting on June 23 through July 10. Half intersection closures (Sullivan, El Rancho & Silverada). Detours in place.
  • Traffic will be swapped to the northside tentatively on Wednesday July 12.

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • Underground construction begins July 5th.
    • One traffic lane in each direction will be maintained along Oddie Boulevard.
    • Intermittent traffic lane shifts during construction hours.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

PEPPERMILL BUS RAPID TRANSIT PROJECT
RTC Project Manager, Ian Chamberlain – (775) 335-0023

Project is complete.

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

SPARKS BOULEVARD IMPROVEMENT PROJECT – SOUTH PHASE
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Project is complete.

SUTRO STREET AND ENTERPRISE ROAD REHABILITATION PROJECT
RTC Project Manager, Maria Paz Fernandez, P.E.  – (775) 335-1861

Sutro Street – 9th Street to Oddie Boulevard:

  • Sutro/9th Street intersection closure – Saturday July 8th through Monday July 10th. Detours in place.
  • Bus routes 2, 5 & 15 and stops impacted on special route detours.

Enterprise Road – Evans Avenue to Valley Road:

  • Road open – intermittent lane closure for stripping, raising utilities and other minor work.

 