Weekly Traffic Control Report

June 26, 2020

2020 PREVENTIVE MAINTENANCE PROGRAM
RTC Project Manager, Scott Gibson, P.E. – (775)335-1874

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Monday 6/29
Pavement Crack Sealing (Night Work: 7:00 PM to 5:00 AM)
Greg Street: Rock Boulevard to McCarran Boulevard
East Greg Street: Stanford Way to Sparks Boulevard

Tuesday 6/30
Pavement Crack Sealing (Night Work: 7:00 PM to 5:00 AM)
Sierra Street: Virginia Street to California Avenue

Wednesday 7/1
Micro-Surfacing
Wingfield Springs Road: Poco Bueno Circle to Calle De Oro Parkway

Pavement Crack Sealing (Night Work: 7:00 PM to 5:00 AM)
Third Street: Sierra Street to Vine Street
Fifth Street: West Street to Virginia Street

Thursday 7/2
Micro-Surfacing
Wingfield Springs Road: Poco Bueno Circle to Calle De Oro Parkway

Pavement Crack Sealing (Night Work: 7:00 PM to 5:00 AM)
Fifth Street: West Street to Virginia Street
Overmeyer Road: Bergin Way to Watson Way
Bergin Way: Kresge Lane to End of Pavement
Watson Way: Glendale Avenue to Dunn Circle
Kresge Lane: McCarran Boulevard to Watson Way

Friday 7/3
NO WORK SCHEDULED

 

ITS PHASE 2B
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

6/22 – 7/10
No work planned, waiting on NDOT project on I580.

 

E PRATER WAY REHABILITATION
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Construction in progress on E Prater Wy between McCarran Blvd and Sparks Blvd. The project is expected to take about six months to complete.

Two-way traffic continues within the construction zone, with one lane in each direction.

The RTC appreciates the community’s patience during the construction process.

 

SUN VALLEY BOULEVARD MULTI-MODAL IMPROVEMENTS – PHASE 1: 7TH AVE TO HIGHLAND RANCH PKWY
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Construction in progress.  Crews currently working along the west side of Sun Valley Blvd.

  • 7th Ave and Middle Fork: one lane closure, two way traffic maintained. Expect delays.

 

TE SPOT 8 – PACKAGE 1
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

The project is substantially complete.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

South Virginia Street:

  • Plumb Ln to Vassar St: two-way traffic with isolated shoulder and street parking closures to install project appurtenances.
  • Vassar St to Liberty St: traffic is reduced to southbound direction only.
    • Northbound through traffic is detoured at Holcomb Ave to Center St to Liberty St.
    • Northbound traffic can also use Mt Rose St to Plumas St to Liberty St.
  • Travelers with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave, Center St, Plumas St, or Haskell St; which include:
    • Pueblo St, Arroyo St, Vassar St, La Rue Ave, Martin St, Taylor St, Cheney St, St Lawrence Ave, Thoma St, California St, Moran St, and Stewart St.

Center Street/Mary Street at Virginia Street:

  • Roundabout work in this area requires closure of Mary St at Virginia St.  Detours will be in place.

North Virginia Street:

  • West Stadium Parking Garage to 8th St: traffic is reduced to one-lane in each direction.
  • 8th St: northern shoulder is closed between Center St and North Virginia St.

For the most up to date information on traffic control, please visit the Virginia Street Website

 

Construction has been classified as an essential service by Governor Sisolak. Construction crews have implemented safety and social-distancing precautions.