Weekly Traffic Control Report

June 23, 2023

2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Sunday 6/25/2023
Pavement Crack Sealing 7pm – 7am
Eagle Canyon Drive: Pyramid Hwy to Calle De La Plata
David Allen Parkway: Kiley Parkway to Fortunato Loop
Vista Boulevard: Brierly Way to Wingfield Hills
E Greenbrae Drive: McCarran Boulevard to Howard Drive
El Rancho Drive: Clear Acre Lane to Moorpark Court
Lemmon Drive: Virginia Street to US-395
Silver Lake Road: Silver Shores Drive to Sky Vista Parkway

Pavement Striping 7pm – 7am
Wedge Parkway: Whites Creek Lane to Arrowcreek Parkway
Wedge Parkway: Mount Rose Hwy to De Spain Lane

Monday 6/26/2023
Micro-Surfacing (Slurry)
Sierra Street: Virginia Street to Eleventh Street

Pavement Patching
Victorian Avenue: El Rancho Boulevard to Pyramid Way
Golden Valley Road: North Hills to Pontiac Drive
Golden Valley Road: Marlin Drive to Spearhead
Somersett Ridge Parkway: US Hwy 40 to Del Webb Parkway

Pavement Crack Sealing 7pm – 7am
Eagle Canyon Drive: Pyramid Hwy to Calle De La Plata
David Allen Parkway: Kiley Parkway to Fortunato Loop
Vista Boulevard: Brierly Way to Wingfield Hills
E Greenbrae Drive: McCarran Boulevard to Howard Drive
El Rancho Drive: Clear Acre Lane to Moorpark Court
Lemmon Drive: Virginia Street to US-395
Silver Lake Road: Silver Shores Drive to Sky Vista Parkway

Pavement Striping 7pm – 7am
De Spain Lane: Mount Rose Hwy to Butch Cassidy
Sierra Street: Virginia Street to Eleventh Street

Tuesday 6/27/2023
Micro-Surfacing (Slurry)
Reno Corporate Drive: Double R Boulevard to Barron Way
Double Eagle Court: End of cul-de-sac to Gateway Drive

Pavement Patching
Victorian Avenue: El Rancho Boulevard to Pyramid Way
Golden Valley Road: North Hills to Pontiac Drive
Golden Valley Road: Marlin Drive to Spearhead
Somersett Ridge Parkway: US Hwy 40 to Del Webb Parkway
South Verdi Road: Bridge Street to Garson Road

Pavement Crack Sealing 7pm – 7am
Eagle Canyon Drive: Pyramid Hwy to Calle De La Plata
David Allen Parkway: Kiley Parkway to Fortunato Loop
Vista Boulevard: Brierly Way to Wingfield Hills
E Greenbrae Drive: McCarran Boulevard to Howard Drive
El Rancho Drive: Clear Acre Lane to Moorpark Court
Lemmon Drive: Virginia Street to US-395
Silver Lake Road: Silver Shores Drive to Sky Vista Parkway

Pavement Striping 7pm – 7am
Locust Street: Casazza Drive to Mill Street
Reno Corporate Drive: Double R Boulevard to Barron Way
Double Eagle Court: end of cul-de-sac to Gateway Drive

Wednesday 6/28/2023
Micro-Surfacing (Slurry)
Giroux Street: Kuenzil Street to Kuenzil Street
Kuenzil Street: Kietzke Lane to Sunshine Lane
Prosperity Street: Kietzke Lane to Golden Lane
Lewis Street: Golden Lane to end

Pavement Patching
Somersett Ridge Parkway: US Hwy 40 to Del Webb Parkway
South Verdi Road: Bridge Street to Garson Road

Pavement Crack Sealing 7pm – 7am
Eagle Canyon Drive: Pyramid Hwy to Calle De La Plata
David Allen Parkway: Kiley Parkway to Fortunato Loop
Vista Boulevard: Brierly Way to Wingfield Hills
E Greenbrae Drive: McCarran Boulevard to Howard Drive
El Rancho Drive: Clear Acre Lane to Moorpark Court
Lemmon Drive: Virginia Street to US-395
Silver Lake Road: Silver Shores Drive to Sky Vista Parkway

Pavement Striping 7pm – 7am
Kirman Avenue: Ryland Street to Apple Street
Giroux Street: Kuenzil Street to Kuenzil Street
Kuenzil Street: Kietzke Lane to Sunshine Lane
Prosperity Street: Kietzke Lane to Golden Lane
Lewis Street: Golden Lane to end

Thursday 6/29/2023
Micro-Surfacing (Slurry)
Gould Street: Mill Street to Second Street
Villanova Drive: Harvard Way to Terminal Way

Pavement Crack Sealing 7pm – 7am
Eagle Canyon Drive: Pyramid Hwy to Calle De La Plata
David Allen Parkway: Kiley Parkway to Fortunato Loop
Vista Boulevard: Brierly Way to Wingfield Hills
E Greenbrae Drive: McCarran Boulevard to Howard Drive
El Rancho Drive: Clear Acre Lane to Moorpark Court
Lemmon Drive: Virginia Street to US-395
Silver Lake Road: Silver Shores Drive to Sky Vista Parkway

Pavement Striping 7pm – 7am
Casazza Drive: Wells Avenue to Kietzke Lane
Apple Street: Kirman Avenue to Kietzke Lane
Gould Street: Mill Street to Second Street
Villanova Drive: Harvard Way to Terminal Way

Friday 6/30/2023
Micro-Surfacing (Slurry)
Wrondel Way: Hubbard Way to Apple Street
Linden Drive: Kietzke Lane to Harvard Way

Pavement Striping 7pm – 7am
Wrondel Way: Hubbard Way to Apple Street
Linden Drive: Kietzke Lane to Harvard Way

4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

Construction of the westbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.

Mesa Park Road from W. 4th Street to 500 feet north remains closed and the closure has been extended through the month of June while construction of the following occurs:

  • 4th Street westbound lanes and islands
  • Northern portion of the roundabout

The project is anticipated to be completed by the end of August 2023.
For more information, visit https://www.4th-woodland-roundabout.com/

ARROWCREEK PARKWAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844

Lane and shoulder closures will be in place on Arrowcreek Parkway, S. Virginia Street, and Damonte Ranch Parkway. Traffic delays may occur.

CALIFORNIA AVE. RECONSTRUCTION-NEWLANDS CIRCLE TO ARLINGTON PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Construction begins Monday June 19, 2023.  Contractor is currently planning to maintain two way traffic but expect delays.

HOLCOMB AVENUE REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Construction crews working on the west side of Holcomb Avenue between Burns Street and Liberty Street. Southbound traffic on Holcomb will be shifted and one lane of traffic in each direction will be maintained.

Sinclair Street will remain closed between the Sinclair/Thoma Intersection and the Sinclair/Holcomb Intersection for reconfiguration and full depth reconstruction.

Parking on street will be limited within areas of improvements and driveways will be temporarily impacted during construction. Short traffic delays and detours may occur.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139

Minor shoulder closures may occur for final construction items.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • One traffic lane in each direction will be maintained along Oddie Boulevard.
  • Construction crews finishing work on center median (concrete) and landscaping.

Phase 2 & 3 – Sullivan Lane (Sparks) to Sutro Street (Reno):

  • One traffic lane in each direction will be maintained along Oddie Boulevard.
  • Intermittent traffic lane shifts during construction hours.
  • Paving operations work starting on June 23 through July 10. Half intersection closures (Sullivan, El Rancho & Silverada). Detours in place.

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • Tentative start date for underground construction work July 5th.
    • One traffic lane in each direction will be maintained along Oddie Boulevard.
    • Intermittent traffic lane shifts during construction hours.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

PEPPERMILL BUS RAPID TRANSIT PROJECT
RTC Project Manager, Ian Chamberlain – (775) 335-0023

Single bus lane closure adjacent to transit station on northbound S. Virginia Street in place.

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

SPARKS BOULEVARD IMPROVEMENT PROJECT – SOUTH PHASE
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Anticipate lane closures and short traffic delays at night for striping operations.

SUTRO STREET AND ENTERPRISE ROAD REHABILITATION PROJECT
RTC Project Manager, Maria Paz Fernandez, P.E.  – (775) 335-1861

Sutro Street – 9th Street to Oddie Boulevard:

  • Sutro/9th Street intersection closure – weekend of July 8th through July 10th.

Enterprise Road – Evans Avenue to Valley Road:

  • Paving operations during the last 2 weeks of June.
  • Road closed – June 5th through June 30th. Detours in place.

 