2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Sunday 6/4/2023
Pavement Crack Sealing 7pm – 7am
Sun Valley Boulevard: 7th Avenue to E. Highland Ranch Parkway
Calle De La Plata: Pyramid Hwy to Encanto Drive
Neighborhood Way: Eagle Canyon Drive to N. of Eagle Canyon Drive
Icon Court: Isidor Court to N. of Isidor Court
Ingenuity Avenue: Nw of Hawco Court to Nw of Haco Court
Clayton Place: E. of Isidor Court to E. of Isidor Court
Neighborhood Way: Eagle Canyon Drive to N. of Eagle Canyon Drive
Monday 6/5/2023
Pavement Crack Sealing
Technology Way: Double R Boulevard to Double Diamond Parkway
Trademark Drive: Double R Boulevard to End
Colbert Drive: Longley Lane to Maestro Drive
Louie Lane: Barron Way to Longley Lane
Barron Way: Louie Lane to S Reno Corporate Drive
Quail Manor Court: Airway Drive to Airway Drive
Reno Corporate Drive: Double R Boulevard to Barron Way
E Greg Street: So McCarran Boulevard to RR Xing
Wolverine Way: Glendale Avenue to Stanford Way
Sierra Street: Virginia Street to Eleventh Street
Catron Drive: Parr Boulevard to Parr Circle
Plaza Street: Virginia Street to S Lake Street
Vine Street: Second Street to University Terrace
Kuenzli Street: Kietzke Lane to Sunshine Lane
Lewis Street: End of Street to Golden Lane
Manuel Street: Second Street to Kuenzli Street
Prosperity Street: Kietzke Lane to Golden Lane
Micro-Surfacing
Belmar Drive: Earthstone Drive to Los Altos Parkway
Eighth Avenue: Sun Valley Drive to Lupin Drive
Fifth Avenue: Lupin Drive to Sun Valley Drive
Pavement Crack Sealing 7pm-7am
Belmar Drive: Earthstone Drive to Los Altos Parkway
Eighth Avenue: Sun Valley Drive to Lupin Drive
Fifth Avenue: Lupin Drive to Sun Valley Drive
Sun Valley Boulevard: 7th Avenue to E. Highland Ranch Parkway
Neighborhood Way: Eagle Canyon Drive to N. of Eagle Canyon Drive
Tuesday 6/6/2023
Micro-Surfacing
Joule Street: Rock Boulevard to Edison Way
Financial Boulevard: Capital Boulevard to Mill Street
Pavement Crack Sealing
E Greg Street: So McCarran Boulevard to RR Xing
Wolverine Way: Glendale Avenue to Stanford Way
S Stanford Way: Glendale Avenue to So McCarran Boulevard
Packer Way: Cul De Sac to Glendale Avenue
Cola Court: Cul De Sac to Vista Boulevard
Loop Road: Vista Boulevard to Horsemens Park
Salomon Circle: Loop Road to EOP
Disc Drive: Vista Boulevard to Sparks Boulevard
Lewis Street: W/End of Street to Golden Lane
Manuel Street: Second Street to Kuenzli Street
Prosperity Street: Kietzke Lane to Golden Lane
Villanova Drive: Harvard Way to Terminal Way
Wrondel Way: Hubbard Way to Apple Street
Golden Valley Road: Marlin Drive to West of Spearhead Drive
Pavement Striping 7pm – 7am
Joule Street: Rock Boulevard to Edison Way
Financial Boulevard: Capital Boulevard to Mill Street
Sun Valley Boulevard: 7th Avenue to E. Highland Ranch Parkway
Neighborhood Way: Eagle Canyon Drive to N. of Eagle Canyon Drive
Wednesday 6/7/2023
Micro-Surfacing
Energy Way: Rock Boulevard to Edison Way
Corporate Boulevard: Capital Boulevard to Mill Street
Pavement Crack Sealing
Disc Drive: Vista Boulevard to Sparks Boulevard
Sparks Boulevard: Baring Boulevard to Pyramid Hwy
E Prater Way: Stanford Way to Sparks Boulevard
Victorian Avenue: El Rancho Boulevard to Pyramid Way
Golden Valley Road: Marlin Drive to West of Spearhead Drive
College Drive: West Side Village Boulevard to East Side
Lakeshore Boulevard: S.R. 28 to Village Boulevard
Mays Boulevard: Southwood Boulevard to Lakeshore Boulevard
Southwood Boulevard: S. Of S.R. 28 to S. of S.R. 28
Village Boulevard: Tahoe Boulevard to Eagle Drive
Pavement Striping 7pm – 7am
Energy Way: Rock Boulevard to Edison Way
Corporate Boulevard: Capital Boulevard to Mill Street
Sun Valley Boulevard: 7th Avenue to E. Highland Ranch Parkway
Neighborhood Way: Eagle Canyon Drive to N. of Eagle Canyon Drive
Thursday 6/8/2023
Micro-Surfacing
Reactor Way: Rock Boulevard to Energy Way
Ampere Drive: Rock Boulevard to Edison Way
Pavement Patching
Casazza Drive: Wells Avenue to Kietzke Lane
Kirman Avenue: Ryland Street to Apple Street
Wrondel Way: Hubbard Way to Apple Street
Locust Street: Casazza Drive to Mill Street
Lewis Street: End of Street to Golden Lane
Plaza Street: Virginia Street to Lake Street
Vine Street: Second Street to University Terrace
Pavement Crack Sealing
Sparks Boulevard: Baring Boulevard to Pyramid Hwy
E Prater Way: Stanford Way to Sparks Boulevard
Victorian Avenue: El Rancho Boulevard to Pyramid Way
College Drive: West Side Village Boulevard to East Side S.R.
Lakeshore Boulevard: S.R. 28 to Village Blvd.
Mays Boulevard: Southwood Boulevard to Lakeshore Boulevard
Southwood Boulevard: S. of S.R. 28 to S. of S.R. 28
Village Boulevard: Tahoe Boulevard to Eagle Drive
Pavement Striping 7pm – 7am
Reactor Way: Rock Boulevard to Energy Way
Ampere Drive: Rock Boulevard to Edison Way
Belmar Drive: Earthstone Drive to Los Altos Parkway
Eighth Avenue: Sun Valley Drive to Lupin Drive
Fifth Avenue: Lupin Drive to Sun Valley Drive
Friday 6/9/2023
Micro-Surfacing
Coliseum Way: Peckham Lane to Moana Lane
Talbot Lane: End to Redfield Parkway
Pavement Patching
Casazza Drive: Wells Avenue to Kietzke Lane
Kirman Avenue: Ryland Street to Apple Street
Wrondel Way: Hubbard Way to Apple Street
Locust Street: Casazza Drive to Mill Street
Lewis Street: End of Street to Golden Lane
Plaza Street: Virginia Street to Lake Street
Vine Street: Second Street to University Terrace
Pavement Crack Sealing
Sparks Boulevard: Baring Boulevard to Pyramid Hwy
E Prater Way: Stanford Way to Sparks Boulevard
Victorian Avenue: El Rancho Boulevard to Pyramid Way
College Drive: West Side Village Boulevard to S.R. 431
Lakeshore Boulevard: S.R. 28 to Village Boulevard
Mays Boulevard: Southwood Boulevard to Lakeshore Boulevard
Southwood Boulevard: S. of S.R. 28 to S. of S.R. 28
Village Boulevard: Tahoe Boulevard to Eagle Drive
Pavement Striping 7pm – 7am
Coliseum Way: Peckham Lane to Moana Lane
Talbot Lane: End to Redfield Parkway
HOLCOMB AVENUE REHABILITATION
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881
Construction crews working on the east side of Holcomb Avenue between Burns Street and Liberty Street. Northbound traffic on Holcomb will be shifted and one lane of traffic in each direction will be maintained.
Parking on street will be limited within areas of improvements and driveways will be temporarily impacted during construction. Short traffic delays and detours may occur.
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139
Minor shoulder closures may occur for final construction items.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
Phase 1 – Pyramid Way to Sullivan Lane (Sparks):
- One traffic lane in each direction will be maintained along Oddie Boulevard.
- Construction crews finishing work on center median (concrete) and landscaping.
Phase 2 & 3 – Sullivan Lane (Sparks) to Sutro Street (Reno):
- One traffic lane in each direction will be maintained along Oddie Boulevard.
- Intermittent traffic lane shifts during construction hours.
- Construction crews are continuing to work on installing underground light conduit, retaining wall, signals and fence removals. Additional construction crews will work on storm drain installations.
- New traffic pattern – travel lanes (one in each direction) shifted to the south side of Oddie Boulevard from Sullivan Lane to east of US-395 ramps.
- Paving operations work starting on June 16 through June 30. Half intersection closures (Sullivan, El Rancho & Silverada). Detours in place.
Phase 4 – Sutro Street to I-80 Ramps (Reno):
- Tentative start date for underground construction work July 5th.
- One traffic lane in each direction will be maintained along Oddie Boulevard.
- Intermittent traffic lane shifts during construction hours.
For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com
PEPPERMILL BUS RAPID TRANSIT
RTC Project Manager, Ian Chamberlain – (775) 335-0023
Single bus lane closure adjacent to transit station on northbound S. Virginia Street in place.
SKY VISTA WIDENING AND REHABILITATION
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
Lane and shoulder closures will be in place.
SPARKS BOULEVARD IMPROVEMENT – SOUTH PHASE
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881
A single lane and shoulder closure will be in place northbound between Greg Street and the I-80 Eastbound Ramps. Anticipate lane closures and short traffic delays at night for striping operations.
SUTRO STREET AND ENTERPRISE ROAD REHABILITATION
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
Sutro Street – 9th Street to Oddie Boulevard:
- Lanes open in both directions.
- Sutro/9th Street intersection closure – weekend of July 8th.
Enterprise Road – Evans Avenue to Valley Road:
- Road closed – June 5th through June 30th. Detours in place.
4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Engineering Manager, Doug Maloy, P.E. – (775) 335-1865
Construction of the retaining wall is complete. Construction of the westbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. The project is anticipated to be completed by the end of August 2023.
Mesa Park Road from W. 4th Street to 500 feet north remains closed and the closure has been extended through the month of June while construction of the following occurs:
- 4th Street westbound lanes and islands.
- Northern portion of the roundabout.
Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.
For more information, visit 4th-woodland-roundabout.com