2022 RTC Preventive Maintenance Project
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874
Monday 7/11
Micro-Surfacing
Veterans Parkway Multi-Use Path
Pavement Patching – Grinder Patch
Peckham Lane: Virginia Street to Longley Lane
Terminal Way: Plumb Lane to Mill Street
Pavement Striping
Eastlake Boulevard: Cattleguard to Coyote Drive
Pavement Crack Sealing (Night Work – 7:00 p.m. – 7:00 a.m.)
Boxington Way: Lincoln Way to Lillard Drive
Deming Way: Spice Islands Drive to End
E Lincoln Way: Stanford Way to McCarran Boulevard
E Lincoln Way: Sparks Boulevard to Lillard Drive
E Prater Way: Sparks Boulevard to City Limits
Franklin Way: Spice Islands Drive to Kleppe Lane
Hulda Court: Hulda Way to End
Lillard Drive: Brierley Way to Prater Way
Purina Way: Spice Islands Drive to Greg Street
United Circle: Spice Islands Drive to Spice Islands Drive
Tuesday 7/12
Micro-Surfacing
Veterans Parkway Multi-Use Path
Pavement Patching – Grinder Patch
Fourth Street: Virginia Street to Evans Avenue
State Street: Virginia Street to Holcomb Avenue
Pavement Striping
Veterans Parkway Multi-Use Path
Pavement Crack Sealing (Night Work – 7:00 p.m. – 7:00 a.m.)
15th Street: C Street to Prater Way
Boxington Way: Lincoln Way to Lillard Drive
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
E Lincoln Way: Stanford Way to McCarran Boulevard
E Lincoln Way: Sparks Boulevard to Lillard Drive
E Prater Way: Sparks Boulevard to City Limits
Franklin Way: Spice Islands Drive to Kleppe Lane
Greenbrae Drive: El Rancho Boulevard to Rock Boulevard
Hulda Court: Hulda Way to End
Lillard Drive: Brierley Way to Prater Way
Purina Way: Spice Islands Drive to Greg Street
Snider Way: Stanford Way to Steneri Way
Spice Islands Court: Spice Islands Drive to Cul De Sac
United Circle: Spice Islands Drive to Spice Islands Drive
Wednesday 7/13
Micro-Surfacing
Veterans Parkway Multi-Use Path
Pavement Patching – Grinder Patch
La Posada Drive: Cordoba Boulevard to End of Curb
Pavement Patching – Hand Patch
Isidor Court: Circuit Court to Academy Way
Distribution Drive: Calle De La Plata to Isidor Court
Pavement Striping
Veterans Parkway Multi-Use Path
Pavement Crack Sealing (Night Work – 7:00 p.m. – 7:00 a.m.)
15th Street: C Street to Prater Way
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
Franklin Way: Spice Islands Drive to Kleppe Lane
Hulda Court: Hulda Way to End
Lillard Drive: Brierley Way to Prater Way
Purina Way: Spice Islands Drive to Greg Street
Snider Way: Stanford Way to Steneri Way
Spice Islands Court: Spice Islands Drive to Cul De Sac
United Circle: Spice Islands Drive to Spice Islands Drive
Clean Water Way: McCarran Boulevard to Cor Soi
Mill Street: Rock Boulevard to McCarran Boulevard
Terminal Way: Mill Street to Plumb Lane
Peckham Lane: Virginia Street to Longley Lane
Thomas Creek Road: Holcomb Lane to Foothill Road
Thursday 7/14
Micro-Surfacing
Wingfield Hills Road: David Allen Parkway to Rolling Meadows Drive
Pavement Striping
Veterans Parkway Multi-Use Path
Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Wingfield Hills Road: David Allen Parkway to Rolling Meadows Drive
Pavement Crack Sealing (Night Work – 7:00 p.m. – 7:00 a.m.)
Clean Water Way: McCarran Boulevard to Cor Soi
Mill Street: Rock Boulevard to McCarran Boulevard
Terminal Way: Mill Street to Plumb Lane
Peckham Lane: Virginia Street to Longley Lane
Thomas Creek Road: Holcomb Lane to Foothill Road
Friday 7/15
Micro-Surfacing
Wingfield Hills Road: David Allen Parkway to Rolling Meadows Drive
Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Wingfield Hills Road: David Allen Parkway to Rolling Meadows Drive
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) Phase 4 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871
Construction to begin July 11, 2022 on Sharlands Avenue from Robb Drive to Mae Anne Avenue. Shoulder or lane closures are possible.
KINGS ROW REHABILITATION PROJECT – PHASE 2 – WYOMING AVENUE TO MCCARRAN BOULVARD
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872
- Kings Row between Apollo Way and Wyoming Avenue is closed to through traffic. Traffic is detoured at Apollo Way back to Wyoming Avenue.
- Kings Row is closed to northbound (uphill) traffic between McCarran Boulevard and Apollo Way. Traffic accessing Kings Row is encouraged to use the residential side streets and access the Kings Row area via McCarran Boulevard to Kings Row southbound or Wyoming Avenue and Conway Lane to the neighborhood streets.
- Drivers should expect delays and rerouting when looking to access Kings Row neighborhood, look for signs and traffic control devices; please drive slowly.
- Pedestrian detours will be provided and temporary alternative bus stops will be available to transit riders.
- On street parking is not allowed along Kings Row during construction working hours (7:00 a.m. to 5:00 p.m.); however, overnight parking within the work zone is permitted.
LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
For additional information on construction status, visit the Project website at http://northvalleysimprovements.com/lemmon-drive/.
MILL STREET COMPLETE STREET – 1-580 to MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Traffic Control Changes!
Spanish Springs Construction has begun work on the NORTH side of Mill Street between Rock Boulevard and Terminal Way. The two right westbound lanes will be closed and westbound traffic will be reduced to one lane. Expect delays during the morning and afternoon rush and consider alternate routes. Business and side street access will be maintained.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
Phase 1: Pyramid Way to Sullivan Lane (Sparks):
- Drivers may see daily intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
- Construction crews are performing drainage work, privacy screens’ footing excavation, posts/panels installation, removing backyard fences and installing light pole bases.
- Roadwork activities:
- “Traffic Swap” (Oddie Boulevard westbound traffic will be shifted to the eastbound lanes.)
- Intermittent lane closures on Pyramid Way.
Phase 4: Sutro Street to I-80 ramps (Reno):
- Utility exploration (potholing).
One lane in each direction will be maintained along Oddie Boulevard. For additional information on construction status and time-lapse pictures, visit the Project website at http://Oddiewellsproject.com.
RENO CONSOLIDATED 20-01 – MAYBERRY DRIVE, CALIFORNIA AVENUE, FIRST STREET
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
California Avenue – westbound traffic will be closed on California Avenue at Booth Street beginning on Wednesday, June 22, 2022 for roadway reconstruction. The detour is anticipated to be in effect for approximately six weeks. Westbound traffic will be detoured at Booth Street to Foster Drive to Hunter Lake Drive to Mayberry Drive to California Avenue. Eastbound traffic will not be affected.
California Avenue is closed to through traffic. Local traffic may access properties along California Avenue and Westfield Avenue from Hunter Lake Drive.
RENO CONSOLIDATED 22-01 – SKY MOUNTAIN DRIVE, SKY VALLEY DRIVE
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874
Traffic is now reversed to the counterclockwise direction allowing work on the other half of the roadway. This week the contractor continues removing drives and sidewalk to be improved. Forming and pouring new sidewalk, curb and gutter will begin.
As part of the project, one-way traffic will be in place for the duration of construction. In addition to improving construction safety and efficiency, one-way traffic will allow vehicles to remain in the traditional right-hand travel lane, retain on-street parking during construction, maintain a bike lane, and allow for continued transit service.
TE SPOT 10 – FUEL TAX PROJECT
RTC Project Manager, Sara Going, P.E. – (775) 335-1897
RTC’s contractor will be completing signal work within the intersection at Victorian & 16th Street in Downtown Sparks throughout the week of July 11-15th. Travelers should expect temporary lane reductions and minor delays during daytime hours.
Bus stops located to the east and west of the intersection will be temporarily relocated during the week, but will remain open to transit riders.
TE SPOT 10 – SOUTH PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871
Construction of a new roundabout at the intersection of 4th Street and Woodland Avenue will begin July 25, 2022.
TRAFFIC SIGNAL INSTALLATION (TSI) 22-01 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871
Construction of traffic signal at Mill Street and Telegraph Street is on-going with other construction on the Mill Street project. Traffic signal at South Meadows Boulevard and Wilbur May Boulevard construction to begin in mid-July.