Weekly Traffic Control Report

July 5, 2018

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

WEEKLY TRAFFIC CONTROL REPORT

July 5, 2018

11:00 AM PST

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT

  • Construction is in progress.  For current traffic information Click here
  • Traffic control and work zones will be in place and changing frequently, use caution and look for flaggers for direction.
  • Expect traffic delays.

EVANS AVENUE BICYCLE IMPROVEMENTS PROJECT

From 2nd St to N McCarran Blvd (1.8 miles)

  • Traffic Control expected to be minimal and intermittent until construction is completed.

ITS PROJECT – PHASE 2A

Work will include conduit and pull box installation at the following locations:

  • N Virginia St between Comstock and 15th St – Work completed.
  • Wells St EB on ramp, shoulder area – Work begins week of 7/6
  • McCarran between Prater and Baring – No work.
  • McCarran between Greg and Nugget – No work.

SOUTHEAST CONNECTOR PROJECT

From Pembroke Drive to South Meadows Pkwy and Veterans Pkwy (4.5 miles)

  • The Southeast connector will be open to traffic by approximately 9 pm on Friday July 6th. Look for traffic signs and use caution as everyone becomes familiar with the new roadway, signalized intersections, and the multi-use path.
  • More information is available at the project website www.SouthEastConnector.com.

 

See weekly traffic report archive