Weekly Traffic Control Report

July 29, 2022

2022 RTC Preventive Maintenance Project
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874

Sunday 7/31/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Lakeshore Boulevard: Village Boulevard to Tahoe Boulevard
Country Club Drive: Tahoe Boulevard to Mt. Rose Highway
Incline Way: Country Club Drive to Southwood Boulevard
Northwood Boulevard: Tahoe Boulevard to Village Boulevard
Tanager Street: Village Boulevard to Southwood Boulevard
Robb Drive: Sharlands Avenue to Las Brisas Boulevard

Monday 8/1/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Lakeshore Boulevard: Village Boulevard to Tahoe Boulevard
Country Club Drive: Tahoe Boulevard to Mt. Rose Highway
Incline Way: Country Club Drive to Southwood Boulevard
Northwood Boulevard: Tahoe Boulevard to Village Boulevard
Tanager Street: Village Boulevard to Southwood Boulevard
Robb Drive: Sharlands Avenue to Las Brisas Boulevard

Tuesday 8/2/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Lakeshore Boulevard: Village Boulevard to Tahoe Boulevard
Country Club Drive: Tahoe Boulevard to Mt. Rose Highway
Incline Way: Country Club Drive to Southwood Boulevard
Northwood Boulevard: Tahoe Boulevard to Village Boulevard
Tanager Street: Village Boulevard to Southwood Boulevard
Robb Drive: Sharlands Avenue to Las Brisas Boulevard

Wednesday 8/3/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Lakeshore Boulevard: Village Boulevard to Tahoe Boulevard
Country Club Drive: Tahoe Boulevard to Mt. Rose Highway
Incline Way: Country Club Drive to Southwood Boulevard
Northwood Boulevard: Tahoe Boulevard to Village Boulevard
Tanager Street: Village Boulevard to Southwood Boulevard
Robb Drive: Sharlands Avenue to Las Brisas Boulevard

Thursday 8/4/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Lakeshore Boulevard: Village Boulevard to Tahoe Boulevard
Country Club Drive: Tahoe Boulevard to Mt. Rose Highway
Incline Way: Country Club Drive to Southwood Boulevard
Northwood Boulevard: Tahoe Boulevard to Village Boulevard
Tanager Street: Village Boulevard to Southwood Boulevard
Robb Drive: Sharlands Avenue to Las Brisas Boulevard

 

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) Phase 4 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction to began July 25, 2022 on Sharlands Avenue from Robb Drive to Mae Anne Avenue. Shoulder or lane closures are possible.

 

KINGS ROW REHABILITATION PROJECT – PHASE 2 – WYOMING AVENUE TO MCCARRAN BOULVARD
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

  • Kings Row is closed to northbound (uphill) traffic between McCarran Boulevard and Wyoming Avenue. Traffic accessing Kings Row is encouraged to use the residential side streets and access the Kings Row area via McCarran Boulevard to Kings Row southbound or Wyoming Avenue and Conway Lane to the neighborhood streets.
  • Drivers should expect delays and rerouting when looking to access Kings Row neighborhood, look for signs and traffic control devices; please drive slowly.
  • Pedestrian detours will be provided and temporary alternative bus stops will be available to transit riders.
  • On street parking is not allowed along Kings Row during construction working hours (7:00 a.m. to 5:00 p.m.); however, overnight parking within the work zone is permitted.

 

LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

For additional information on construction status, visit the Project website at http://northvalleysimprovements.com/lemmon-drive/.

 

MILL STREET COMPLETE STREET – MILL STREET FROM TERMINAL WAY TO MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Traffic Control Changes!
Spanish Springs Construction has begun work on the NORTH side of Mill Street between Rock Boulevard and Terminal Way. The two right westbound lanes will be closed and westbound traffic will be reduced to one lane. Between Rock and McCarran there is work happening at the Edison intersection and the outside southbound lane will be closed.  Expect delays during the morning and afternoon rush and consider alternate routes.  Business and side street access will be maintained.

 

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1: Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see daily intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Construction crews are performing  privacy screens’ footing excavation, posts/panels installation, retaining curb, installing light pole bases, constructing curb and gutter and grade planter/landscape.
  • Roadwork activities:
    • Traffic Swap” (Oddie Boulevard westbound traffic will be shifted to the eastbound lanes.)

One lane in each direction will be maintained along Oddie Boulevard. For additional information on construction status and time-lapse pictures, visit the Project website at http://Oddiewellsproject.com. 

 

RENO CONSOLIDATED 20-01 – MAYBERRY DRIVE, CALIFORNIA AVENUE, FIRST STREET
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

California Avenue – westbound traffic will be closed on California Avenue at Booth Street beginning on Wednesday, June 22, 2022 for roadway reconstruction. The detour is anticipated to be in effect for approximately six weeks. Westbound traffic will be detoured at Booth Street to Foster Drive to Hunter Lake Drive to Mayberry Drive to California Avenue. Eastbound traffic will not be affected.

California Avenue is closed to through traffic.  Local traffic may access properties along California Avenue and Westfield Avenue from Hunter Lake Drive.

 

RENO CONSOLIDATED 22-01 – SKY MOUNTAIN DRIVE, SKY VALLEY DRIVE
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874

Two way traffic is back!  Paving and striping have been completed.  The contractor will be making some repairs in various locations so continue to expect some traffic control activities throughout the project.

 

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction Sky Vista project will begin August 15, 2022.  Lane and shoulder closures will be in place.

 

TE SPOT 10 – SOUTH PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of a new roundabout at the intersection of 4th Street and Woodland Avenue will begin August 15, 2022. Lane closures and detours will be in place.

 

TRAFFIC SIGNAL INSTALLATION (TSI) 22-01 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of traffic signal at Mill Street and Telegraph Street is on-going with other construction on the Mill Street project. Traffic signal at South Meadows Boulevard and Wilbur May Boulevard construction to begin August 2022.