2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.
Monday 7/31/2023
Pavement Striping 7am – 7pm
Salomon Circle: Loop Road to End of Pavement
Loop Road: Vista Boulevard to Horsemens Park
Packer Way: Cul de Sac to E Glendale Avenue
Tuesday 8/1/2023
Pavement Striping 7am – 7pm
Cola Court: Cul de Sac to Vista Boulevard
Prototype Court: End of Cul de Sac to Gateway Drive
Portman Avenue: Patriot Boulevard to Offenhauser Drive
Wednesday 8/2/2023
Pavement Striping 7am – 7pm
Sandhill Road: Double R Boulevard to Double Diamond Parkway
Brookside Court: Rock Boulevard to End of Cul de Sac
Thursday 8/3/2023
Pavement Striping 7am – 7pm
Trademark Drive: Double R Boulevard to End of Cul de Sac
Bluestone Drive: Portman Avenue to Huffaker Lane
Friday 8/4/2023
Pavement Striping 7am – 7pm
Wolverine Way: Glendale Avenue to Standford Way
Catron Drive: Parr Boulevard to Parr Circle
Colbert Drive: S Longley Lane to Maestro Street
Saturday 8/5/2023
Pavement Striping 7am – 7pm
Manuel Street: Second Street to Kuenzli Street
S Stanford Boulevard: Greg Street to S McCarran Boulevard
Clayton Place: Isidor Court to Isidor Court
4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139
Construction of the eastbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.
Mesa Park Road is open in the northbound/uphill direction only. The southbound/downhill direction on Mesa Park Road will remain closed through Phase 2 of construction. This closure has been extended through mid-September while construction of the following occurs:
- 4th Street eastbound lanes and islands
- Southern portion of the roundabout
The project is anticipated to be completed by Fall of 2023.
For more information, visit https://www.4th-woodland-roundabout.com/
ARROWCREEK PARKWAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844
Rolling lane reductions may occur for pavement marking operations. Single lane closures in limited areas are anticipated to resume Monday 8/7/2023.
CALIFORNIA AVENUE RECONSTRUCTION-NEWLANDS CIRCLE TO ARLINGTON PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
Construction begins Monday June 19, 2023. Contractor is currently planning to maintain two-way traffic but expect delays.
HOLCOMB AVENUE REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881
Construction on Holcomb will proceed on August 7, 2023, following the Hot August Nights special event.
Parking on street will be limited within areas of improvements until striping is completed.
INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139
Minor shoulder closures may occur for final construction items.
ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861
- One traffic lane in each direction will be maintained along Oddie Boulevard.
Phase 1 – Pyramid Way to Sullivan Lane (Sparks):
- Construction crews are finishing landscape work.
Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):
- New traffic pattern – two-way traffic on the northside of Oddie Boulevard
- Construction crews working on southside of Oddie Boulevard installing underground conduit for street lighting, storm drain and retaining curb
Phase 3 – east of US 395 Ramps to Sutro Street (Reno):
- Intermittent traffic lane shifts during construction hours.
- Traffic swapped to the southside.
- Montello Street (half intersection closure) Monday, July 24 through Friday, September 29. Detours in place.
- Construction crews working on storm drain installation, underground conduit and concrete work (sidewalk and retaining curb)
Phase 4 – Sutro Street to I-80 Ramps (Reno):
- Intermittent traffic lane shifts during construction hours.
For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com
SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824
Lane and shoulder closures will be in place.