Weekly Traffic Control Report

July 27, 2018

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

WEEKLY TRAFFIC CONTROL REPORT

July 27, 2018

3:00 PM PST

2018 PREVENTIVE MAITENANCE PROGRAM
This schedule contains temperature sensitive work and may be modified if weather conditions are unfavorable.

Friday 7/27

Pavement Crack Sealing
Red Rock Rd: Moya Blvd to Moya Blvd

Silver Lake Rd: Red Rock Rd to Mariner Cover Dr

Virginia St: Business 395 to Stead Blvd

Lancaster Dr: Yorkshire Dr to Virginia St

Eighth Ave: Sun Valley Blvd to Lupin Dr

Lupin Dr: Fifth Ave to Ninth Ave

Fifth Ave: Lupin Dr to Sun Valley Blvd

Pavement Patching
Los Altos Pkwy: Vista Blvd to Pyramid Hwy

N Wingfield Pkwy: Vista Blvd to Wingfield Springs Rd

Vista Blvd: Wingfield Springs Pkwy to Hubble Dr

 

Sunday 7/29 thru Thursday 8/2

Pavement Crack Sealing – Night Work (7:00 PM to 6:00 AM)
Sierra St: Virginia St to California Ave

Center St: Truckee River Bridge to Ninth St

University Terrace: Vine St to Sierra St

Ninth St: Virginia St to Shoshone

Ralston St: Fifth St to University Terrace

Seventh St: Sierra St to Virginia St

Sixth St: Ralston St to Virginia St

Fifth St: West St to Tacchino St

N Arlington: First St to Sixth St

Lake St: Mill St to Second St

Court St: Arlington Ave to Virginia St

Liberty St: Arlington Ave to Center St

Ryland St: Holcomb Ave to Kirman Ave

 

Thursday 8/2 thru Friday 8/3

Pavement Patching
Rio Wrangler Pkwy: Western Skies Dr to Steamboat Pkwy

Wedge Pkwy: Mt Rose Hwy to White Creek Ln

Thomas Creek Rd: Zolezzi Ln to Mt Rose Hwy

 

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT
Construction is in progress.  For current traffic information Click here.

  • Traffic control and work zones will be in place and changing frequently, use caution and look for flaggers for direction.
  • Expect traffic delays.

 

EVANS AVENUE BICYCLE IMPROVEMENTS PROJECT
From 2nd Street to N McCarran Blvd (1.8 miles)

  • Traffic Control expected to be minimal and intermittent until construction is completed.

 

ITS PROJECT – PHASE 2A
Work will include conduit and pull box installation at the following locations:

  • N Virginia St between Comstock and 15th St- fiber pulled in and striping will take place 7/25, shoulder closures will occur.
  • Wells St EB on ramp, shoulder area – work continues through 7/27.
  • McCarran between Prater and Baring – work begins week of 7/30 – 8/31.
  • McCarran between Greg and Nugget – work begins week of 7/30 – 8/31.

 

SOUTHEAST CONNECTOR PROJECT
From Pembroke Drive to South Meadows Pkwy and Veterans Pkwy (4.5 miles)

  • The Southeast connector is open to traffic.  The speed limit is 45 mph.  Look for traffic signs and use caution as everyone becomes familiar with the new roadway, signalized intersections, and the multi-use path.
  • Intermittent shoulder closures and single lane closures in specific locations will occur over the next several months.  Details will be provided on this weekly report.
  • More information is available at the project website www.SouthEastConnector.com.

 

 

 