Weekly Traffic Control Report

July 21, 2023

2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Sunday 7/23/2023
Micro-Surfacing (Slurry) 7pm – 7am
Plumb Lane: Arlington Avenue to Orange Lane

Pavement Striping 7pm – 7am
Longley Lane: Virginia Street to Rock Boulevard
Plumas Street: Plumb Lane to California Avenue
Sandhill Road: Double R Boulevard to Double Diamond Parkway
Plumb Lane: McCarran Boulevard to Orange Lane

Monday 7/24/2023
Micro-Surfacing (Slurry) 7pm – 7am
Plumb Lane: Arlington Avenue to Orange Lane
Wells Avenue: Virginia Street to Seventh Street

Pavement Patching 7pm – 7am
Sparks Boulevard: North of Baring Boulevard to Pyramid Hwy
Disc Drive: Sparks Boulevard to Vista Boulevard

Pavement Striping 7pm – 7am
Longley Lane: Virginia Street to Rock Boulevard
Plumas Street: Plumb Lane to California Avenue
Sandhill Road: Double R Boulevard to Double Diamond Parkway
Plumb Lane: McCarran Boulevard to Orange Lane
Prototype Court: End of Cul de Sac to Gateway Drive
Portman Avenue: Patriot Boulevard to Offenhauser Drive
Brookside Court: Rock Boulevard to End of Cul de Sac

Loop Installation 7pm – 7am
Wells Avenue: Virginia Street to Seventh Street

Tuesday 7/25/2023
Micro-Surfacing (Slurry) 7pm – 7am
Wells Avenue: Virginia Street to Seventh Street

Pavement Patching 7pm – 7am
Sparks Boulevard: North of Baring Boulevard to Pyramid Hwy
Disc Drive: Sparks Boulevard to Vista Boulevard

Pavement Crack Sealing 
Lakeshore Boulevard: S.R. 28 to E Side Village Boulevard

Pavement Striping 7pm-7am 
Longley Lane: Virginia Street to Rock Boulevard
Plumb Lane: McCarran Boulevard to Orange Lane
Trademark Drive: Double R Boulevard to End of Cul de Sac
Victorian Avenue: El Rancho Boulevard to Pyramid Way
Wells Avenue: Virginia Street to Seventh Street

Loop Installation 7pm – 7am
Wells Avenue: Virginia Street to Seventh Street

Wednesday 7/26/2023
Micro-Surfacing (Slurry) 7pm – 7am
Wells Avenue: Virginia Street to Seventh Street

Pavement Patching 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Hwy
Disc Drive: Sparks Boulevard to Vista Boulevard

Pavement Crack Sealing 
Lakeshore Boulevard: S.R. 28 to E Side Village Boulevard

Pavement Striping 7pm – 7am
Longley Lane: Virginia Street to Rock Boulevard
Plumb Lane: McCarran Boulevard to Orange Lane
Wells Avenue: Virginia Street to Seventh Street
Meadowood Mall Link: Meadowood Mall Circle to McCarran Boulevard
Louie Lane: Barron Way to Longley Lane
Bluestone Drive: Portman Avenue to Huffaker Lane

Thursday 7/27/2023
Micro-Surfacing (Slurry) 7pm – 7am
Wells Avenue: Virginia Street to Seventh Street

Pavement Patching 7pm – 7am
Terminal Way: Plumb Lane to Plumb Lane

Pavement Striping 7pm – 7am
Longley Lane: Virginia Street to Rock Boulevard
Plumb Lane: McCarran Boulevard to Orange Lane
Wells Avenue: Virginia Street to Seventh Street
Greg Street: End of Plain Cement Concrete to Bridge Joint
E Greg Street: South McCarran Boulevard to RR Xing

Chip Seal
Lakeshore Boulevard: S.R. 28 to Village Boulevard

Friday 7/28/2023
Micro-Surfacing (Slurry) 7pm – 7am
Meadowood Mall Way: Virginia Street to Kietzke Lane
Manuel Street: Second Street to Kuenzli Street

Pavement Striping 7pm – 7am
Longley Lane: Virginia Street to Rock Boulevard
Plumb Lane: McCarran Boulevard to Orange Lane
Wells Avenue: Virginia Street to Seventh Street
Wolverine Way: Glendale Avenue to Stanford Way
Catron Drive: Parr Boulevard to Parr Circle

4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

Construction of the eastbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.

Mesa Park Road is open in the northbound/uphill direction only. The southbound/downhill direction on Mesa Park Road will remain closed through Phase 2 of construction. This closure has been extended through mid-September while construction of the following occurs:

  • 4th Street eastbound lanes and islands
  • Southern portion of the roundabout

The project is anticipated to be completed by Fall of 2023.
For more information, visit https://www.4th-woodland-roundabout.com/

ARROWCREEK PARKWAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844

Lane and shoulder closures will be in place on Arrowcreek Parkway, S. Virginia Street, and Damonte Ranch Parkway. Two-way traffic will be maintained on Arrowcreek Parkway, but watch for traffic shifts and expect delays.

Closure of the Zolezzi Lane at the Zolezzi Lane/Arrowcreek Parkway intersection Wednesday, July 26 through Thursday, July 27. Detour via Thomas Creek Road will be in place.

CALIFORNIA AVENUE RECONSTRUCTION-NEWLANDS CIRCLE TO ARLINGTON PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Construction begins Monday June 19, 2023.  Contractor is currently planning to maintain two-way traffic but expect delays.

HOLCOMB AVENUE REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Traffic on Holcomb will be shifted and one lane of traffic in each direction will be maintained.

Parking on street will be limited within areas of improvements and driveways will be temporarily impacted during construction. Short traffic delays and detours may occur.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139

Minor shoulder closures may occur for final construction items.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

  • One traffic lane in each direction will be maintained along Oddie Boulevard.

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Construction crews are finishing landscape work.

Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):

  • New traffic pattern – Two-way traffic on the northside of Oddie Boulevard
  • Construction crews working on southside of Oddie Boulevard installing underground conduit for street lighting, storm drain and retaining curb

Phase 3 – east of US 395 Ramps to Sutro Street (Reno):

  • Intermittent traffic lane shifts during construction hours.
  • Traffic swapped to the southside.
  • Montello Street (half intersection closure) Monday, July 24 through Friday, September 29. Detours in place.
  • Construction crews working on storm drain installation, underground conduit and concrete work (sidewalk and retaining curb)

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • Intermittent traffic lane shifts during construction hours.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

SUTRO STREET AND ENTERPRISE ROAD REHABILITATION PROJECT
RTC Project Manager, Maria Paz Fernandez, P.E.  – (775) 335-1861

Sutro Street – 9th Street to Oddie Boulevard:

  • Road open – intermittent lane closure for striping, raising utilities and other minor work.

Enterprise Road – Evans Avenue to Valley Road:

  • Road open – intermittent lane closure for striping, raising utilities and other minor work.

 