Weekly Traffic Control Report

July 18, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Monday 7/22
Pavement Crack Sealing Punch List (Nightwork)
Clearacre Lane: Wedekind Road to McCarran Boulevard
Harvard Way: Linden Street to Vassar Street
Wedge Parkway: De Spain Lane to Mt. Rose Highway
South Verdi Road: South Verdi Court to Bridge Street

Slurry Seal
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Los Altos Parkway: Vista Boulevard to Promedio Parkway
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Los Altos Parkway: Vista Boulevard to Promedio Parkway

Tuesday 7/23
Pavement Crack Sealing Punch List (Nightwork)
Beaumont Parkway: Avenida de Landa to Clubhouse Drive
Mira Loma Drive: South McCarran Boulevard to Heron’s Landing
Double Diamond Parkway: Double R Boulevard to Double R Boulevard
Double R Boulevard: Damonte Ranch Road to South Meadows Parkway
Sierra Center Parkway: Virginia Street to Maestro Drive
Veterans Parkway: Geiger Grade RAB to South Meadows Parkway
Toll Road: Geiger Grade Road to Ravazza Road

Slurry Seal
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Harvard Street: Linden Street to Vassar Street
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Harvard Street: Linden Street to Vassar Street

Wednesday 7/24
Pavement Crack Sealing Punch List (Nightwork)
Eagle Canyon Parkway: Pyramid Way to W Calle de la Plata
Red Rock Road: Moya Boulevard to CA State Line
Vista Boulevard: Brierley Way to Wingfield Parkway
Sparks Boulevard: I-80 Highway to East Prater Way
Matley Lane: Vassar Street to Mill Street

Slurry Seal
Clearacre Lane: Wedekind Road to McCarran Boulevard
Market Street: Villanova Drive to Kietzke Lane
Yale Street: Harvard Way to Market Street
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Clearacre Lane: Wedekind Road to McCarran Boulevard
Market Street: Villanova Drive to Kietzke Lane
Yale Street: Harvard Way to Market Street
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Los Altos Parkway: Vista Boulevard to Promedio Parkway

Thursday 7/25
Pavement Crack Sealing Punch List (Nightwork)
Marietta Way: Glendale Avenue to End of Pavement
Bible Way: Vassar Street to Mill Street
South Rock Boulevard: Glendale Avenue to Center of Bridge
Vassar Street: Virginia Street to Telegraph Street
Mill Street: Lake Street to I-80 On/Off Ramps
Automotive Way: Kietzke Lane to Market Street
Kirman Avenue: Kuenzli Street to Ryland Street

Slurry Seal
Clearacre Lane: Wedekind Road to McCarran Boulevard
Valley Road: Fourth Street to Enterprise Way
Yale Street: Harvard Way to Market Street
Telegraph Street: Vassar Street to Greg Street
Redwood Place: Market Street to Mill Street
Matley Lane: Vassar Street to Mill Street
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Clearacre Lane: Wedekind Road to McCarran Boulevard
Valley Road: Fourth Street to Enterprise Way
Yale Street: Harvard Way to Market Street
Telegraph Street: Vassar Street to Greg Street
Redwood Place: Market Street to Mill Street
Matley Lane: Vassar Street to Mill Street
Silver Lake Road: Mariner Cove Drive to Sky Vista Parkway
Harvard Street: Linden Street to Vassar Street

Friday 7/26
Pavement Crack Sealing Punch List (Nightwork)
Valley Road: Fourth Street to Enterprise Way
Ferrari Street: Fourth Street to Fifth Street
Depaoli Street: Fifth Street to Tacchino Street
Tacchino Street: Depaoli Street to Fourth Street
Yale Way: Harvard Way to Market Street
Market Street: Villanova Drive to Kietzke Lane

Slurry Seal
Kirman Avenue: Kuenzli Street to Ryland Street
El Rancho Drive: Clearacre Lane to Moorpark Court
Matley Lane: Vassar Street to Mill Street
Condor Way: Airmotive Way to End of Street
Louise Street: Market Street to Mill Street
Automotive Way: Kietzke Lane to Market Street
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Kirman Avenue: Kuenzli Street to Ryland Street
El Rancho Drive: Clearacre Lane to Moorpark Court
Matley Lane: Vassar Street to Mill Street
Condor Way: Airmotive Way to End of Street
Louise Street: Market Street to Mill Street
Automotive Way: Kietzke Lane to Market Street

Saturday 7/27
Slurry Seal
David Allen Parkway: Kiley Parkway East to Fortunato Loop
Lazy 5 Parkway: Pyramid Highway to David Allen Parkway

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
David Allen Parkway: Kiley Parkway East to Fortunato Loop
Lazy 5 Parkway: Pyramid Highway to David Allen Parkway

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

Starting July 22, 2019, at 7:00 a.m. through Saturday, July 27, 2019

15th Street

From C Street to Prater Way open to traffic in both directions in the construction zone.  Construction crews will be working on concrete improvements and NV Energy crews will be lowering shallow gas services.

  • Booth St is now open to traffic between Westfield Ave and Idlewild Dr. and Business access off Booth St will be provided between California Ave and Westfield Ave during this same time period.
  • Keystone Ave is now open to northbound and Southbound traffic from to Foster.
  • Keystone Ave will not be accessible from California Ave.

Detours will be in place during construction. For safety reasons, there is no pedestrian access through California Ave from Newlands Cir to Booth St during construction.

In early August the California Ave/Keystone Ave intersection will reopen before Reno High School is back in session.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive
Construction scheduled to begin July 29, 2019.

Lane closures for traffic signal conduit installation.

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting July 22, 2019, at 7:00 a.m. through Saturday, July 27, 2019:

  •  15th Street
    • From C Street to Prater Way open to traffic in both directions in the construction zone.  Construction crews will be working on concrete improvements and NV Energy crews will be lowering shallow gas services.
    • From Victorian Avenue to C Street closed to thru traffic.  Businesses and residences within the closure will be provided access from Victorian Avenue or the Alley on 16th Street between Victorian Avenue and C Street.  Traffic will be detoured at 15th Street to 16th to C Street or Victorian Avenue and to Victorian Plaza Circle to C Street or Victorian Avenue.  Construction crews will be working on utilities, median, and concrete improvements.
  •  C Street from 16th to 15th Street open to eastbound traffic only in the construction zone.  Traffic will be detoured at 15th Street to Victorian Avenue to 16th Street.  Construction crews will be working on utilities and concrete improvements.
  •  El Rancho Drive from G Street to Oddie Blvd will be open to traffic in both directions.  Traffic lanes will be moved over to the west half of the roadway for construction of concrete improvements on the east side. There will be two southbound and one northbound traffic lane.
  • Traffic on Franklin Way from East Greg Street to Spice Islands Drive will be open to southbound traffic only in the construction zone.  Northbound traffic will be detoured at Spice Islands Drive to Purina Way to East Greg Street.  Construction crews will be working on concrete improvements.
  •  Hulda Court traffic will be impacted with driveway closures for concrete improvements.

Pedestrian detours will be in place during construction.  El Rancho Drive pedestrian detour will be from Oddie Blvd into Paradise Park, down to Elementary Drive, and south to G St using existing sidewalk on the west side El Rancho Dr.  For safety reasons, there is no pedestrian access on the east side of El Rancho Drive from G St to Oddie Blvd during construction.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Between Plumb Ln and Mt Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Wells Ave to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    • Tahoe/Saint Lawrence (between Virginia St and Forest St)
    • Moran (between Virginia St and Center St)
    • East Taylor (between Virginia St and Center St)Martin (between Virginia St and Haskell St)
    • Caliente (between Virginia St and Haskell St)

For the most up to date information on traffic control, please visit the Virginia Street Website.  

See weekly traffic report archive