Weekly Traffic Control Report

January 10, 2020

2019 PREVENTIVE MAINTENANCE PROGRAM
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Monday 1/13/2020
Pavement Crack Sealing
Avenida De Landa: Sharlands Avenue to Robb Drive

Tuesday 1/14/2020
Pavement Crack Sealing
Avenida De Landa: Sharlands Avenue to Robb Drive

Wednesday 1/15/2020
Pavement Crack Sealing
Avenida De Landa: Sharlands Avenue to Robb Drive

Thursday 1/16/2020
NO WORK SCHEDULED

Friday 1/17/2020
NO WORK SCHEDULED

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Monday 1/20
The Foster Drive on ramp from Booth to Keystone will be closed for pedestrian rail installation.

 

ITS PHASE 2B PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

1/6 – 1/21
Work will continue along Baring Blvd.  Intermittent lane and shoulder closures should be expected.  Pull boxes and a 55’ pole for a traffic camera will be installed at Baring Blvd and N Truckee Ln.  

1/22 – 1/31
Shoulder and lane closures along Sparks Blvd from Baring Blvd to Disc Dr.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

No work currently scheduled.  Traffic signal is in operation.

 

TE SPOT 8 – PACKAGE 1
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

1/7 – 1/24
Construction will begin at the intersection of Evans Ave and Enterprise Rd with shoulder and lane closures.

 

TE SPOT 8 – PACKAGE 2
RTC Project Manager, Andrew Jayankura, P.E., PTOE. – (775) 332-2139

No work currently scheduled.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

Virginia Street:

  • Vassar St to Stewart St – traffic is reduced to southbound direction only. Traffic control will shift lanes throughout this section of Virginia St.
  • Northbound through traffic is detoured at Holcomb Ave to Center St to Liberty St.  Drivers can also use Mt Rose Street to northbound Haskell St to Martin St to Virginia St. Two-way traffic is available north of Stewart St.
  • Northbound traffic with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave, Center St, or Haskell St; which include:
    • Pueblo St, Arroyo St, Caliente St, Vassar St, Taylor St, Cheney St, St Lawrence Ave, Moran St, and Stewart St.

Center Street and Mary Street at Virginia Street:

  • ROAD CLOSURE: Work in this area will require closure of either Center St or Mary St at Virginia St. During limited instances, both streets may be closed at the same time.
  • Detours will be in place.

For the most up to date information on traffic control, please visit the Virginia Street Website.  