Weekly Traffic Control Report

February 18, 2022

2021 RTC PREVENTIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E., – (775) 335-1874

No work scheduled.

 

GOLDEN VALLEY AT BECKWOURTH – TRAFFIC SIGNAL PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction will begin March 7, 2022.

 

LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

 Q&D continues work on the new retaining wall near Walgreens.

  • Drivers may see shoulder and lane closures on Lemmon Drive from Sky Vista Parkway/Buck Drive to just east of the Walgreens driveway during daytime working hours.
  • Access to Walgreens driveway and the access road from Lemmon Drive will be closed for approximately four months.  Please use Sky Vista Parkway to access Walgreens.

This week drivers can expect to see additional traffic control including orange barrels on the outside lanes of Lemmon Drive from Sky Vista Parkway/Buck Drive to Military Road as crews prepare for roadway widening.

 

MILL STREET COMPLETE STREET – 1-580 to MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Spanish Springs Construction continues work on the south side of Mill Street between McCarran Boulevard and Rock Boulevard.  The two right eastbound lanes will be closed and eastbound traffic will be reduced to one lane.  Business and side street access will be maintained.

Electrical work between Telegraph Street and Rock Boulevard will take place. The outside eastbound lane will be closed to accommodate that work.

 

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

El Rancho Drive – Greenbrae Drive to Oddie Boulevard (Sparks)

  • Construction work is in progress and expected to continue until mid-March.
  • One lane in each direction will be maintained.
  • Access will be maintained, but alternate routes are recommended.

Phase 1: Pyramid Way to Sullivan Lane (Sparks)

  • Drivers may see intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Construction crews are doing underground electrical work, excavating/forming/building retaining walls.
  • Sullivan Lane closure from Monday, February 21 – Friday, February 25. Detour in place with alternative routes taking Prater Way and Greenbrae Drive.

One lane in each direction will be maintained along Oddie Boulevard.  For additional information on construction status and time-lapse pictures, visit the Project website at Oddiewellsproject.com .

 

TE SPOT 10 – FUEL TAX
RTC Project Manager, Sara Going, P.E. – (775) 335-1897

No work scheduled.  Construction will continue in March 2022.

 

TE SPOT 10 – NORTH
RTC Project Manager, Andrew Jayankura, P.E., PTOE – (775) 332-2139

Construction will be postponed until next spring for pavement slurry seal.  The intersection is open for normal operations.

New roadway configuration in place.  Please use caution driving through the intersection.