Weekly Traffic Control Report

December 6, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Friday 12/6
Utility Adjustments
Mira Loma Drive: McCarran Boulevard to Veterans Parkway
Maestro Drive: Colbert Drive to Double R Boulevard
Sierra Center Parkway: Virginia Street to Maestro Drive
South Meadows Parkway: Gateway Drive to Veterans Parkway
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway
Double Diamond Parkway: Double R Boulevard to Double R Boulevard

Monday 12/9
Pavement Striping
Plumb Lane: Sharon Way to Arlington Avenue

Tuesday 12/10
Pavement Crack Sealing
Fourth Street: Keystone Avenue to West Street
Kuenzli Street: Kietzke Avenue to Girioux Street
Lake Street: Second Street to Plaza Street
Liberty Street: Center Street to Holcomb Avenue
Wells Avenue: Virginia Street to Kuenzli Street
Locust Street: Casazza Drive to Ryland Street
Ryland Street: Kirman Avenue to Mill Street
Kirman Avenue: Ryland Street to Plumb Lane
Second Street: Girioux Street to Kietzke Lane

Utility Adjustments
Los Altos Parkway: Vista Boulevard (South) to Goodwin Road
Vista Boulevard: Brierley Way to Wingfield Parkway
Los Altos Parkway: Vista Boulevard to Promedio Parkway
Eagle Canyon Drive: Pyramid Highway to West Calle De La Plata

Wednesday 12/11
Pavement Crack Sealing
Fourth Street: Keystone Avenue to West Street
Kuenzli Street: Kietzke Avenue to Girioux Street
Lake Street: Second Street to Plaza Street
Liberty Street: Center Street to Holcomb Avenue
Wells Avenue: Virginia Street to Kuenzli Street
Locust Street: Casazza Drive to Ryland Street
Ryland Street: Kirman Avenue to Mill Street
Kirman Avenue: Ryland Street to Plumb Lane
Second Street: Girioux Street to Kietzke Lane

Utility Adjustments
Los Altos Parkway: Vista Boulevard (South) to Goodwin Road
Vista Boulevard: Brierley Way to Wingfield Parkway
Los Altos Parkway: Vista Boulevard to Promedio Parkway
Eagle Canyon Drive: Pyramid Highway to West Calle De La Plata

Thursday 12/12
Pavement Crack Sealing
Fourth Street: Keystone Avenue to West Street
Kuenzli Street: Kietzke Avenue to Girioux Street
Lake Street: Second Street to Plaza Street
Liberty Street: Center Street to Holcomb Avenue
Wells Avenue: Virginia Street to Kuenzli Street
Locust Street: Casazza Drive to Ryland Street
Ryland Street: Kirman Avenue to Mill Street
Kirman Avenue: Ryland Street to Plumb Lane
Second Street: Girioux Street to Kietzke Lane

Utility Adjustments
Mira Loma Drive: McCarran Boulevard to Veterans Parkway
Maestro Drive: Colbert Drive to Double R Boulevard
Sierra Center Parkway: Virginia Street to Maestro Drive
South Meadows Parkway: Gateway Drive to Veterans Parkway
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway
Double Diamond Parkway: Double R Boulevard to Double R Boulevard

Friday 12/13
Utility Adjustments
Mira Loma Drive: McCarran Boulevard to Veterans Parkway
Maestro Drive: Colbert Drive to Double R Boulevard
Sierra Center Parkway: Virginia Street to Maestro Drive
South Meadows Parkway: Gateway Drive to Veterans Parkway
Double R Boulevard: Damonte Ranch Parkway to South Meadows Parkway
Double Diamond Parkway: Double R Boulevard to Double R Boulevard

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

The road is open with no controls.  Signal work that remains will occur later this year and may require traffic control for a short period of time.

 

ITS PHASE 2B PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

12/3  –  12/13
Conduit installation on Disc Dr between Sparks Blvd and Vista Blvd.  WB lane closures and driveway closures.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

12/6/19 – 1/3/20
Occasional lane closure for signal equipment installation for a new traffic signal at the intersection of N Virginia Street and Lemmon Drive.

 

RENO CONSOLIDATED 19-03 – SIERRA HIGHLANDS DRIVE, COLBERT DRIVE, HAMMILL LANE, RALSTON STREET, AND OHM PLACE
RTC Project Manager, Warren Call, P.E. – (775) 335-1881

Road work on Sierra Highlands Drive, Colbert Drive, Hammill Lane, Ralston Street, and Ohm Place is complete.  The roads are open with no restrictions.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

Roadway closures will be in place for construction of the roundabout at the intersections of Virginia Street and Center Street/Mary Street. Businesses will always remain accessible.

Virginia Street:

  • Mt Rose St/Holcomb Ave to Martin St – traffic is reduced to southbound direction only. Traffic control will shift lanes throughout this section of Virginia St.
  • Northbound through traffic is detoured at Holcomb Ave to Center St to Liberty St. Drivers can also use Mt Rose Street to northbound Haskell St to Martin St to Virginia St. Two-way traffic is available north of Martin St.
  • Northbound traffic with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave or Haskell St, which include:
    • Pueblo St, Arroyo St, Caliente St, Vassar St, Taylor St, Cheney St, St Lawrence Ave, Moran St, and Stewart St.

Center Street and Mary Street at Virginia Street:

  • ROAD CLOSURE: Work in this area will require closure of either Center St or Mary St at Virginia St. During limited instances both streets may be closed at the same time.
  • Detours will be in place.

For the most up to date information on traffic control, please visit the Virginia Street Website.  

See weekly traffic report archive