Weekly Traffic Control Report

December 26, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Monday 12/30  –  Friday 1/3
No work is scheduled.  Work will resume on Monday 1/6.

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Monday December 30
Lane Closures on California and Foster to facilitate some corrective work and pedestrian railing installation.

 

ITS PHASE 2B PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Monday 12/23 – Friday 12/27
No work during holidays

Monday 12/30 – Tuesday 12/31
Pullbox replacement on Baring Boulevard and Truckee Lane with occasional lane and shoulder closures

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Friday 12/13 – Monday 12/23
Occasional lane closure for signal equipment installation for a new traffic signal at the intersection of N Virginia Street and Lemmon Drive.

Traffic signal activation tentatively scheduled for 12/30/19.

 

TE SPOT 8 – PACKAGE 1
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Thursday 1/2
Construction of new traffic signal at Evans Avenue and Enterprise Road, possible lane and shoulder closures.

 

TE SPOT 8 – PACKAGE 2
RTC Project Manager, Andrew Jayankura, P.E., PTOE. – (775) 332-2139

Red Rock Road at Silver Lake Boulevard Traffic Signal Installation
• Traffic Control in effect weekdays from 7 a.m. to 5 p.m. throughout December.
• Eastbound, westbound, southbound traffic lanes will be reduced to one lane for underground utility work.
• Expect flagger operation through the project for equipment and materials moving throughout the project.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

Virginia Street:

  • Mt Rose St/Holcomb Ave to Martin St – traffic is reduced to southbound direction only. Traffic control will shift lanes throughout this section of Virginia St.
  • Northbound through traffic is detoured at Holcomb Ave to Center St to Liberty St. Drivers can also use Mt Rose Street to northbound Haskell St to Martin St to Virginia St. Two-way traffic is available north of Martin St.
  • Northbound traffic with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave or Haskell St, which include:
    • Pueblo St, Arroyo St, Caliente St, Vassar St, Taylor St, Cheney St, St Lawrence Ave, Moran St, and Stewart St.

Starting in early 2020, traffic control will extend northward from Martin St towards Liberty St.

Center Street and Mary Street at Virginia Street:

  • ROAD CLOSURE: Work in this area will require closure of either Center St or Mary St at Virginia St. During limited instances both streets may be closed at the same time.
  • Detours will be in place.

For the most up to date information on traffic control, please visit the Virginia Street Website.  