Weekly Traffic Control Report

December 17, 2021

2021 RTC PREVENTIVE MAINTENANCE
RTC Project Manager, Scott Gibson, P.E., – (775) 335-1874

No work scheduled.

 

ITS PHASE 3
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of underground infrastructure is complete.  Final fiber optic splicing work is in progress at:

  • Rock Boulevard from Greg Street to Victorian Avenue.

 

LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

 Q&D continues work on the new retaining wall near Walgreens.

  • Drivers may see shoulder and lane closures on Lemmon Drive from Sky Vista Parkway/Buck Drive to just east of the Walgreens driveway during daytime working hours.
  • Access to Walgreens driveway and the access road from Lemmon Drive will be closed for approximately four months.  Please use Sky Vista Parkway to access Walgreens.

This week drivers can expect to see additional traffic control including orange barrels on the outside lanes of Lemmon Drive from Sky Vista Parkway/Buck Drive to Military Road as crews prepare for roadway widening.

 

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)

RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1: Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see intermittent shoulder and/or lane closures on Oddie Boulevard during daytime working hours.
  • Granite construction crews are doing underground work, excavating/forming/pouring footings.
  • On Pyramid Way ( between J Street and I Street): intermittent closure of southbound lane from 9:00AM and 4:00PM.

One lane in each direction will be maintained along Oddie Boulevard.  For additional information on construction status, visit the Project website at http://Oddiewellsproject.com

 

TE SPOT 10 – FUEL TAX
RTC Project Manager, Sara Going, P.E. – (775) 335-1897

Construction continues at the following locations:

  • Sparks Boulevard & Ion Drive
  • Veterans Parkway & Long Meadow Drive

Travelers should expect shoulder closures at all locations while construction crews complete trenching work and construct new pedestrian ramps and sidewalks. Though roadways will remain open to traffic, the number of travel lanes may be temporarily reduced from 9:00AM to 3:00PM Monday through Friday.

 

TE SPOT 10 – NORTH
RTC Project Manager, Andrew Jayankura, P.E., PTOE – (775) 332-2139

Construction will be postponed until next spring for pavement slurry seal.  The intersection is open for normal operations.

New roadway configuration in place. Please use caution driving through the intersection.

See weekly traffic report archive