Weekly Traffic Control Report

August 8, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Monday 8/12/2019
Slurry Seal
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard
S 18th Street: Glendale Avenue to Crane Way
S 19th Street: Hymer Avenue to Pacific Avenue
S 21st Street: Greg Street to Pacific Avenue
Pacific Avenue: S 21st Street to S 19th Street
Vista Boulevard: Prater Way to Los Altos Parkway (South)

Tuesday 8/13/2019
Slurry Seal
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard
Vista Boulevard: Prater Way to Los Altos Parkway (South)

Wednesday 8/14/2019
Slurry Seal
Toll Road: Geiger Grade Road to Rim Rock Drive

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Toll Road: Geiger Grade Road to Rim Rock Drive
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard

Thursday 8/15/2019
Slurry Seal
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard

Friday 8/16/2019
Slurry Seal
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road
Toll Road: Geiger Grade Road to Rim Rock Drive

Saturday 8/17/2019
Slurry Seal
Wedge Parkway: Mt. Rose Highway to De Spain Lane
Campus Way: Neil Road to Sierra Center Parkway

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

From Newlands Cir to Booth St

The California Keystone intersection will reopen Friday August 9. There will be intermittent closures on the Southbound Keystone slip ramp through the weekend. The project is now substantially complete.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive

Lane closures for traffic signal conduit installation.

 

RENO CONSOLIDATED 19-01 – SUTRO STREET, LAKE STREET, FIRST STREET AND STATE STREET

The project will involve pavement rehabilitation and reconstruction on State Street from Virginia Street to Sinclair Street, First Street from Center Street to Lake Street, and Lake Street from the southern approach of the Truckee River bridge to First Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the construction zones from 7am-6pm. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions. Access will be maintained to your property for the duration of the project; however, we will coordinate driveway closures individually if your access is being reconstructed. There is also a potential for short traffic delays during asphalt removal and paving operations but we will do our best to get you to and from your residence or business as quickly and safely as possible.

During construction, the RTC RIDE bus service (Sierra Spirit and Routes 1, 5, 9, 13, 14, and 19) may be temporarily impacted within the project area. However, any detours or changes to bus stop locations will be noted in advance at the affected bus stop.

 

Starting August 12, 2019, at 7:00 a.m. through August 16, 2019 at 5:00 p.m.:

  • State Street
    • From Virgina to Sinclair closed to thru traffic. Construction crews will be working on concrete improvements on the south side of the roadway.
    • Businesses and residences within the closure will be provided eastbound access from Virginia and Center. Westbound traffic will be detoured at Sinclair to Liberty to Center.
    • Pedestrian detours will be in place during construction.

 

RENO CONSOLIDATED 19-02 Project – North Hills Boulevard from Golden Valley Road to Buck Drive and The intersection of Hunter Lake Drive at Foster Drive.

North Hills Blvd:
Construction activities start on Monday August 5.
Traffic Control set up and minimal impact to traffic.
Demolition and drainage work with shoulder closures.

Hunter Lake/Foster Dr:
Construction to start by the end of August.

 

RENO CONSOLIDATED 19-03 Project – Sierra Highlands Drive, Colbert Drive, Hammill Lane, Ralston Street, and Ohm Place.

Ralston Street between University Terrace and 11th Street;  Starting August 5th at 7:00 am thru October 3rd construction will be in progress with traffic controls in place along Ralston Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the construction zones from 7am-7pm, Monday through Friday. During construction, we will also provide access for trash pickup on Tuesdays – please place your Green Waste cans out on Tuesday for pickup. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions.

Ohm Place from Mill Street to 500 feet south (NV Energy Corporate Yard entrance) contruction will begin August 6th thru the middle of October. Traffic controls will be in place with Ohm Place closed for construction from 8/6 to 8/9 and again from 9/23 to 10/10. NVE Business access will be detoured to the street west of Ohm Place.

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting August 12, 2019, at 7:00 a.m. through Saturday August 17, 2019:

  • 15th Street
    • From C Street to Prater Way open to traffic in both directions in the construction zone. Construction crews will be working on concrete and improvements.
    • From Victorian Avenue to C Street closed to thru traffic. Businesses and residences within the closure will be provided access from Victorian Avenue or the Alley on 16th Street between Victorian Avenue and C Street. Traffic will be detoured at 15th Street to 16th to C Street or Victorian Avenue and to Victorian Plaza Circle to C Street or Victorian Avenue. Construction crews will be working on landscaping, median, and concrete improvements.
  • El Rancho Drive from G Street to Oddie Blvd will be open to traffic in both directions. Traffic lanes will shift for construction of concrete improvements on the west side of the roadway.
  • Traffic on Franklin Way from East Greg Street to Spice Islands Drive will be open to southbound traffic only in the construction zone. Northbound traffic will be detoured at Spice Islands Drive to Purina Way to East Greg Street. Construction crews will be working on concrete improvements.

Pedestrian detours will be in place during construction.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Between Plumb Ln and Mt Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Regency Way to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    • Tahoe/Saint Lawrence (between Virginia St and Forest St)
    • Moran (between Virginia St and Center St)
    • East Taylor (between Virginia St and Center St)
    • Martin (between Virginia St and Haskell St)
    • Arroyo (between Virginia St and Haskell St)

For the most up to date information on traffic control, please visit the Virginia Street Website.  

 