Weekly Traffic Control Report

August 3, 2018

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

WEEKLY TRAFFIC CONTROL REPORT

August 3, 2018

1:39 PM PST

 

2018 PREVENTIVE MAITENANCE PROGRAM
This schedule contains temperature sensitive work and may be modified if weather conditions are unfavorable.

Sunday 8/5 thru Tuesday 8/7

Pavement Crack Sealing – Night Work (7:00 Pm To 6:00 Am)

Coney Island Dr: Greg Pkwy to Dead End

Deming Way: Spice Island Dr to Glendale Ave

Disc Drive: Pyramid Way to Sparks Blvd

Frazer Ave: 21st Street to Cul De Sac

Galleria Pkwy: Disc Drive to Los Altos Pkwy

Glen Carran Cir: S Stanford Way (S) To S Stanford Way (N)

Hymer Ave: S 21st Street to Dead End

Industrial Way: Coney Island Dr to Glendale Ave

Kleppe Lane: Greg St (E) To Greg St (W)

Larkin Circle: Greg Street to Cul De Sac

Meredith Way: Kleppe Lane to E Glendale Ave

Pittman Ave: 18th Street to Dead End

Purina Way: Spice Island Dr to Greg St

S Stanford Way: Nugget Avenue to Railroad

Shaber Ave: 18th Street to 15th St

Spice Island Ct: Spice Island Dr to Cul De Sac

 

Monday 8/6

Pavement Patching

Los Altos Pkwy: Vista Blvd (S) To Pyramid Hwy

Wingfield Hills Pkwy: S Wingfield Pkwy to 97 S/O Vista

S Wingfield Pkwy: Wingfield Hills Pkwy to Vista Blvd

E Victorian Ave: McCarran Blvd to Pyramid Way

 Tuesday 8/7

Pavement Patching

Foothill Road: Caribou Rd to S Virginia Street

Arrowcreek Pkwy: Thomas Creek Pkwy to Private Entrance

Thomas Creek Rd: Zolezzi Lane to Mt Rose Hwy

Wednesday 8/8/thru Thursday 8/9

Pavement Patching

Thomas Creek Rd: Zolezzi Lane to Mt Rose Hwy

Friday 8/10/ thru Saturday 8/11

Pavement Patching

Eighth Avenue: Sun Valley Dr to Lupin Dr

Lupin Dr: Fifth Avenue to Ninth Ave

Fifth Ave: Sun Valley Dr to Lupin Dr

Highland Ranch Pkwy: Sun Valley Dr to Pyramid Way

Dandini Blvd: Clearacre Lane to 170’ W Of Leonesio Dr

 

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT
Construction is in progress.  For current traffic information Click here.

  • Traffic control and work zones will be in place and changing frequently, use caution and look for flaggers for direction.
  • Expect traffic delays.

 

EVANS AVENUE BICYCLE IMPROVEMENTS PROJECT
From 2nd Street to N McCarran Blvd (1.8 miles)

  • Construction has been completed. Traffic Control has been removed.

 

ITS PROJECT – PHASE 2A
Work will include conduit and pull box installation at the following locations:

  • N Virginia St between Comstock and 15th St – Work complete
  • Wells St EB on ramp, shoulder area – Work complete
  • McCarran between Prater and Baring – Work begins week of 7/30 – 8/31.
  • McCarran between Greg and Nugget – Work begins week of 7/30 – 8/31.

 

SOUTHEAST CONNECTOR PROJECT
From Greg St to South Meadows Pkwy and Veterans Pkwy (5.5 miles)

  • The Southeast connector is open to traffic. The speed limit is 45 mph. Look for traffic signs and use caution as everyone becomes familiar with the new roadway, signalized intersections, and the multi-use path.
  • Intermittent shoulder closures and single lane closures in specific locations will occur over the next several months.Details will be provided on this weekly report.
  • More information is available at the project website www.SouthEastConnector.com.

 

 

 

See weekly traffic report archive