Weekly Traffic Control Report

August 29, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

 

Saturday 8/31/2019
NO WORK SCHEDULED

Sunday 9/1/2019
NO WORK SCHEDULED

Monday 9/2/2019
NO WORK SCHEDULED

 

Tuesday 9/3/2019
Slurry Seal

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Neil Road: Delucchi Lane to Marvel Way

 

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Neil Road: Delucchi Lane to Marvel Way

 

Wednesday 9/4/2019
Slurry Seal

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Mill Street: Wells Avenue to Kietzke Lane

 

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Mill Street: Wells Avenue to Kietzke Lane

 

Thursday 9/5/2019
Slurry Seal

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Greenbrae Drive: Howard Drive to McCarran Boulevard

Marietta Way: Glendale Avenue to End of Pavement

 

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Greenbrae Drive: Howard Drive to McCarran Boulevard

Marietta Way: Glendale Avenue to End of Pavement

 

Friday 9/6/2019
Slurry Seal

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Mira Loma Drive: McCarran Boulevard to Heron’s Landing

 

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Mira Loma Drive: McCarran Boulevard to Heron’s Landing

Mill Street: Wells Avenue to Kietzke Lane

Neil Road: Delucchi Lane to Marvel Way

 

Saturday 9/7/2019
Slurry Seal

Vista Boulevard: Los Altos Parkway to Wingfield Parkway

Ralston Street: Fifth Street to University Terrace

Ryland Street: Holcomb Avenue to Kirman Avenue

Mill Street: Kietzke Lane to I-580 On/Off Ramps

Bible Way: Vassar Street to Mill Street

 

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

The project is now substantially complete. Minor utility work is scheduled for the morning of Saturday September 7th. The road will remain open however the contractor may require a lane closure for a short period of time.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive

Construction on hold until signal equipment arrives mid-November

 

RENO CONSOLIDATED 19-01 – SUTRO STREET, LAKE STREET, FIRST STREET AND STATE STREET

Construction closures and detours for the project will begin Tuesday, September 3. The project is expected to be complete by September 30.

Lake Street will be closed to through traffic from the Truckee River bridge to Second Street. Northbound traffic will be detoured at Mill Street to Wells Avenue to Kuenzli Street and at Liberty Street to Center Street. Southbound traffic will be detoured at Second Street to Virginia Street to Liberty Street to Sinclair Street. Businesses within the closure will be provided southbound access at 2nd Street to westbound 1st Street.

1st Street will be closed to through traffic from Center Street to Lake Street. Businesses within the closure will be provided southbound access at 2nd Street to westbound at 1st Street. Drivers will be able to access the Cal Neva parking garage using Second Street to Lover’s Lane Alley.

All detours will be marked.

This project is part of a larger project called Reno Consolidated 19-01, which will reconstruct and rehabilitate select Reno roadways identified for improvement or maintenance.

To learn more, please visit detours map.

 

RENO CONSOLIDATED 19-02 Project – North Hills Boulevard from Golden Valley Road to Buck Drive and The intersection of Hunter Lake Drive at Foster Drive.

North Hills Blvd:

  • Demolition, sidewalk and drainage work with one lane closure.
  • Two-way traffic maintained at all times.
  • Please share the road to bicyclists.
  • One lane-two way traffic with flaggers between Buck Dr. and Beckwourth Dr.
  • Between Beckwourth Dr. and Golden Valley Rd. traffic is shifted using the center turn lane as a travel lane.
  • Access to the mail drop boxes may be closed for pipe work across the driveways.

Hunter Lake/Foster Dr:

  • Construction to start on Monday September 9th.

 

RENO CONSOLIDATED 19-03 Project – Sierra Highlands Drive, Colbert Drive, Hammill Lane, Ralston Street, and Ohm Place.

Ralston Street between University Terrace and 11th Street; Starting August 5th at 7:00 am thru October 3rd construction will be in progress with concrete removal and replacement for sidewalk and curb/gutters; roadway reconstruction. Traffic controls in place along Ralston Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the Ralston Street construction zones from 7am-7pm, Monday through Friday from August 5th to the first of October. During construction, we will also provide access for trash pickup on Tuesdays – please place your Green Waste cans out on Tuesday for pickup. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions.

Ohm Place construction is schedule to begin Monday, 09/09, with partial cloure. Beginning the week of 09/16 full closure of Ohm Place will be in effect through the beginning of October.

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting August 26, 2019, at 7:00 a.m. through Saturday August 31, 2019:

Drivers can expect the following road and lane closures. All detours will be marked.

15th Street:

  • Tuesday, September 3 – Friday, September 20: 15th Street will be closed to through traffic from C Street to Prater Way during roadway removal and paving. Northbound traffic will be detoured at C Street to 16th Street to Prater Way, or at Victorian Avenue to Pyramid Way to Prater Way. Southbound traffic will be detoured at Prater Way to 16th Street to C Street or to Pyramid Way to Victorian Avenue. Businesses and residences within the closure will be provided southbound access from Prater Way.

C Street/15th Street Intersection:

  • Saturday, September 7: Closed to all traffic from Friday, September 6 at 7 a.m. though midnight for paving.
  • Saturday, September 14: Closed to all traffic from 7 a.m. – 7 p.m. for final paving operations.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Between Plumb Ln and Mt Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Regency Way to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    • East Taylor (between Virginia St and Center St)
    • Martin (between Virginia St and Haskell St)
    • Arroyo (between Virginia St and Haskell St)
    • Cheney (between Virginia St and Center St)
    • Stewart Street (between Virginia St and Center St)
    • Caliente Street (between Virginia St and Haskell St)

For the most up to date information on traffic control, please visit the Virginia Street Website.  

 