Weekly Traffic Control Report

August 19, 2022

2022 RTC Preventive Maintenance Project
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874

Sunday 8/21/2022

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Mill Street: Terminal Way to McCarran Boulevard

Monday 8/22/2022

Micro-Surfacing
Mill Street: Terminal Way to McCarran Boulevard
E Prater Way: Vista Boulevard to City Limits
Boxington Way: Lincoln Way to Lillard Drive
Purina Way: Spice Islands Drive to Greg Street
Snider Way: Stanford Way to Steneri Way
Spice Islands Court: Spice Islands Drive to Cul De Sac

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Mill Street: Terminal Way to McCarran Boulevard
E Greenbrae Drive: Stanford Way to McCarran Boulevard
Franklin Way: Spice Islands Drive to Kleppe Lane
Boxington Way: Lincoln Way to Lillard Drive
Purina Way: Spice Islands Drive to Greg Street
Snider Way: Stanford Way to Steneri Way
Spice Islands Court: Spice Islands Drive to Cul De Sac

Tuesday 8/23/2022

Micro-Surfacing
15th Street: C Street to Prater Way
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
Hulda Court: Hulda Way to End

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Mill Street: Terminal Way to McCarran Boulevard
E Greenbrae Drive: Stanford Way to McCarran Boulevard
Franklin Way: Spice Islands Drive to Kleppe Lane
15th Street: C Street to Prater Way
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
Hulda Court: Hulda Way to End

Wednesday 8/24/2022

Micro-Surfacing
Southeast Connector: Pembroke Drive to Clean Water Way

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Southeast Connector: Pembroke Drive to Clean Water Way
Mill Street: Terminal Way to McCarran Boulevard
15th Street: C Street to Prater Way
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
Hulda Court: Hulda Way to End

Thursday 8/25/2022

Micro-Surfacing
Southeast Connector: Pembroke Drive to Clean Water Way

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Southeast Connector: Pembroke Drive to Clean Water Way
Boxington Way: Lincoln Way to Lillard Drive
Purina Way: Spice Islands Drive to Greg Street
Snider Way: Stanford Way to Steneri Way
Spice Islands Court: Spice Islands Drive to Cul De Sac

Friday 8/26/2022

Micro-Surfacing
Southeast Connector: Pembroke Drive to Clean Water Way

Pavement Striping (Night Work – 7:00 p.m. – 7:00 a.m.)
Southeast Connector: Pembroke Drive to Clean Water Way
15th Street: C Street to Prater Way
Deming Way: Spice Islands Drive to End
Dermody Way: Glendale Avenue to End
Hulda Court: Hulda Way to End

 

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) Phase 4 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction will continue on Geiger Grade from S. Virginia to Veteran’s Parkway. Shoulder closures are possible during this phase of the project.

 

KINGS ROW REHABILITATION PROJECT – PHASE 2 – WYOMING AVENUE TO MCCARRAN BOULVARD
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

  • Kings Row is closed to northbound (uphill) traffic between McCarran Boulevard and Wyoming Avenue. Traffic accessing Kings Row is encouraged to use the residential side streets and access the Kings Row area via McCarran Boulevard to Kings Row southbound or Wyoming Avenue and Conway Lane to the neighborhood streets.
  • Drivers should expect delays and rerouting when looking to access Kings Row neighborhood, look for signs and traffic control devices; please drive slowly.
  • On street parking is not allowed along Kings Row during construction working hours (7:00 a.m. to 5:00 p.m.); however, overnight parking within the work zone is permitted.

 

LEMMON DRIVE SEGMENT 1 – US 395 TO MILITARY ROAD
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

For additional information on construction status, visit the Project website at http://northvalleysimprovements.com/lemmon-drive/.

 

MILL STREET COMPLETE STREET – MILL STREET FROM TERMINAL WAY TO MCCARRAN BOULEVARD
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Spanish Springs Construction is nearing completion on this project and will address final cleanup and landscape issues throughout the project limits from Terminal Way to McCarran Boulevard. There will be isolated closures in the outside lanes. The southbound to westbound turnpocket at McCarran Boulevard will be closed for paving.

 

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

Phase 1: Pyramid Way to Sullivan Lane (Sparks):

  • Drivers may see daily intermittent shoulder and lane closures on Oddie Boulevard during daytime working hours.
  • Construction crews constructing sidewalk, curb and gutter, grade planter/landscape and road median.
  • Roadwork activities:
    • Traffic Swap” (Oddie Boulevard westbound traffic will be shifted to the eastbound lanes.)
    • Pyramid Way: intermittent lane closures between 9:00 a.m. – 2:00 p.m.
    • Paving Operations starting Monday, August 29, 2022  until Friday, Septemeber 16, 2022.
      • Rock Intersection (north side) closure with detour
      • 12th Intersection (north side) closure with detour
      • Sullivan: lane closures during construction hours

One lane in each direction will be maintained along Oddie Boulevard. For additional information on construction status and time-lapse pictures, visit the Project website at http://Oddiewellsproject.com. 

 

PECKHAM LANE REHABILITATION PROJECT
RTC Project Manager, Andrew Jayankura, P.E., PTOE, RSP1 – (775) 332-2139

Roadway Rehabilitation of Peckham Lane between S. Vriginia Street and Baker Lane have begun and will continue till Mid-October 2022. Detours will be in place around the vicinity of the project.

 

RENO CONSOLIDATED 20-01 – MAYBERRY DRIVE, CALIFORNIA AVENUE, FIRST STREET
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

California Avenue – westbound traffic will be closed on California Avenue at Booth Street beginning on Wednesday, June 22, 2022 for roadway reconstruction. The detour is anticipated to be in effect for approximately six weeks. Westbound traffic will be detoured at Booth Street to Foster Drive to Hunter Lake Drive to Mayberry Drive to California Avenue. Eastbound traffic will not be affected.

California Avenue is closed to through traffic.  Local traffic may access properties along California Avenue and Westfield Avenue from Hunter Lake Drive.

 

RENO CONSOLIDATED 22-01 – SKY MOUNTAIN DRIVE, SKY VALLEY DRIVE
RTC Project Manager, Scott Gibson, P.E. – 775-335-1874

Two way traffic is back!
Paving and striping have been completed. The contractor will be making some repairs in various locations so continue to expect some traffic control activities throughout the project.

 

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction Sky Vista project will begin August 15, 2022.  Lane and shoulder closures will be in place.

 

TE SPOT 10 – SOUTH PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of a new roundabout at the intersection of 4th Street and Woodland Avenue will begin August 22, 2022. Lane closures and detours will be in place. The first phase of this project will be relocation of overhead utilities to underground with the roundabout construction starting Spring 2023.

 

TRAFFIC SIGNAL INSTALLATION (TSI) 22-01 PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

Construction of traffic signal at Mill Street and Telegraph Street is on-going with other construction on the Mill Street project. Traffic signal at South Meadows Boulevard and Wilbur May Boulevard construction to begin August 2022.

See weekly traffic report archive