Weekly Traffic Control Report

August 17, 2018

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

WEEKLY TRAFFIC CONTROL REPORT

August 17, 2018

2:20 PM PST

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT
Construction is in progress.  For current traffic information Click here.

  • Traffic control and work zones will be in place and changing frequently, use caution and look for flaggers for direction.
  • Expect traffic delays.

 

2018 PREVENTIVE MAITENANCE PROGRAM
This schedule contains temperature sensitive work and may be modified if weather conditions are unfavorable.

Saturday 8/18/2018

Micro Surfacing

Spice Islands Court: Spice Islands Drive To Cul-De-Sac

Larkin Circle: Greg Street to Cul-De-Sac

 

Monday 8/20/2018

 

Pavement Crack Sealing (Night Work: 7:00 Pm To 5:00 Am)

Rock Boulevard: Victorian Avenue to McCarran Boulevard

Greenbrae Drive: Rock Boulevard to 4th Street

El Rancho Drive: Sullivan Lane to Moorepark Circle

Victorian Avenue: Pyramid Way to Stanford Way

Fifth Street: West Street to East End Cul-De-Sac

Longley Lane: Houston Drive to Rock Boulevard

Neil Road: Neil/Kietzke Round-A-Bout to McCarran Boulevard

Foothill Road: Caribou Road to South Virginia Street

Eastlake Boulevard: Cattleguard at North End To 1,750’ North

 

Micro Surfacing

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Chip Seal (2017 Preventive Maintenance Project)

McCurry Boulevard: West Side of Northwood to 53’ East Of Sr 431

Village Boulevard: North Side of Lakeshore to West Side Eagle Drive

College Drive: West Side of Village to East Side of State Route 431

Country Club Drive: North Side of Lakeshore to South Side of Sr 431

Lakeshore Boulevard: West Side of East Sr 28 to East Side of West Sr 28

Pavement Striping (Night Work: 7:00 Pm To 5:00 Am)

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Wingfield Hills Road: Wingfield Parkway to Vista Boulevard

South Wingfield Parkway: Wingfield Hills Road to Vista Boulevard

Larkin Circle: Greg Street to Cul-De-Sac

Spice Islands Court: Spice Islands Drive To Cul-De-Sac

 

Tuesday 8/21/2018

Pavement Crack Sealing (Night Work: 7:00 Pm To 5:00 Am)

 

Rock Boulevard: Victorian Avenue to McCarran Boulevard

Greenbrae Drive: Rock Boulevard to 4th Street

El Rancho Drive: Sullivan Lane to Moorepark Circle

Victorian Avenue: Pyramid Way to Stanford Way

Fifth Street: West Street to East End Cul-De-Sac

Longley Lane: Houston Drive to Rock Boulevard

Neil Road: Neil/Kietzke Round-A-Bout to McCarran Boulevard

Foothill Road: Caribou Road to South Virginia Street

Eastlake Boulevard: Cattleguard at North End To 1,750’ North

Micro Surfacing

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Red Rock Road: Bird Springs Road to Spoke Road

Chip Seal (2017 Preventive Maintenance Project)

Mccourry Boulevard: West Side of Northwood to 53’ East Of Sr 431

Village Boulevard: North Side of Lakeshore to West Side Eagle Drive

College Drive: West Side of Village to East Side of State Route 431

Country Club Drive: North Side of Lakeshore to South Side of Sr 431

Lakeshore Boulevard: West Side of East Sr 28 to East Side of West Sr 28

Pavement Striping (Night Work: 7:00 Pm To 5:00 Am)

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

North Wingfield Parkway: Wingfield Springs Road to Vista Boulevard

South Wingfield Parkway: Wingfield Hills Road to Vista Boulevard

 

Wednesday 8/22/2018

Pavement Crack Sealing (Night Work: 7:00 Pm To 5:00 Am)

Rock Boulevard: Victorian Avenue to McCarran Boulevard

Greenbrae Drive: Rock Boulevard to 4th Street

El Rancho Drive: Sullivan Lane to Moorepark Circle

Victorian Avenue: Pyramid Way to Stanford Way

Fifth Street: West Street to East End Cul-De-Sac

Longley Lane: Houston Drive to Rock Boulevard

Neil Road: Neil/Kietzke Round-A-Bout to McCarran Boulevard

Foothill Road: Caribou Road to South Virginia Street

Eastlake Boulevard: Cattleguard at North End To 1,750’ North

Micro Surfacing

 

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Red Rock Road: Bird Springs Road to Spoke Road

Chip Seal (2017 Preventive Maintenance Project)

Mccourry Boulevard: West Side of Northwood to 53’ East Of Sr 431

Village Boulevard: North Side of Lakeshore to West Side Eagle Drive

College Drive: West Side of Village to East Side of State Route 431

Country Club Drive: North Side of Lakeshore to South Side of Sr 431

Lakeshore Boulevard: West Side of East Sr 28 to East Side of West Sr 28

Pavement Striping (Night Work: 7:00 Pm To 5:00 Am)

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Galleria Parkway: Disc Drive to Los Altos Parkway

Red Rock Road: Bird Springs Road to Spoke Road

 

Thursday 8/23/2018

Pavement Crack Sealing (Night Work: 7:00 Pm To 5:00 Am)

Rock Boulevard: Victorian Avenue to McCarran Boulevard

Greenbrae Drive: Rock Boulevard to 4th Street

El Rancho Drive: Sullivan Lane to Moorepark Circle

Victorian Avenue: Pyramid Way to Stanford Way

Fifth Street: West Street to East End Cul-De-Sac

Longley Lane: Houston Drive to Rock Boulevard

Neil Road: Neil/Kietzke Round-A-Bout to McCarran Boulevard

Foothill Road: Caribou Road to South Virginia Street

Eastlake Boulevard: Cattleguard at North End To 1,750’ North

Micro Surfacing

 

 Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Los Altos Parkway: Promedio Parkway to Pyramid Way

Pavement Striping (Night Work: 7:00 Pm To 5:00 Am)

Los Altos Parkway: Promedio Parkway to Pyramid Way

Los Altos Parkway: Vista Boulevard (North) To Vista Boulevard (South)

Galleria Parkway: Disc Drive to Los Altos Parkway

Larkin Circle: Greg Street to Cul-De-Sac

Spice Islands Court: Spice Islands Drive To Cul-De-Sac

 

Friday 8/24/2018

 Pavement Crack Sealing (Night Work: 7:00 Pm To 5:00 Am)

Rock Boulevard: Victorian Avenue to McCarran Boulevard

Greenbrae Drive: Rock Boulevard to 4th Street

El Rancho Drive: Sullivan Lane to Moorepark Circle

Victorian Avenue: Pyramid Way to Stanford Way

Fifth Street: West Street to East End Cul-De-Sac

Longley Lane: Houston Drive to Rock Boulevard

Neil Road: Neil/Kietzke Round-A-Bout to McCarran Boulevard

Foothill Road: Caribou Road to South Virginia Street

Eastlake Boulevard: Cattleguard at North End To 1,750’ North

Micro Surfacing

Disc Drive: Sparks Boulevard to Pyramid Way

Pavement Striping (Night Work: 7:00 Pm To 5:00 Am)

Disc Drive: Sparks Boulevard to Pyramid Way

 

 

ITS PROJECT – PHASE 2A
Work will include conduit and pull box installation at the following locations:

  • N Virginia St between Comstock and 15th St – Work complete
  • Wells St EB on ramp, shoulder area – Work complete
  • McCarran between Greg and Nugget – Night work begins week of 8/26-9/7; southbound slow lane closure.
  • McCarran between Prater and Baring – Day work begins week of 9/10-9/28; occasional shoulder closure northbound direction

 

SOUTHEAST CONNECTOR PROJECT
From Greg St to South Meadows Pkwy and Veterans Pkwy (5.5 miles)

  • The Southeast connector is open to traffic. The speed limit is 45 mph. Look for traffic signs and use caution as everyone becomes familiar with the new roadway, signalized intersections, and the multi-use path.
  • Intermittent shoulder closures and single lane closures in specific locations will occur over the next several months.Details will be provided on this weekly report.
  • More information is available at the project website www.SouthEastConnector.com.

 

 

 