Weekly Traffic Control Report

August 16, 2018

REGIONAL TRANSPORTATION COMMISSION TRAFFIC CONTROL REPORT

WEEKLY TRAFFIC CONTROL REPORT

August 16, 2018

11:23 AM PST

4TH STREET AND PRATER WAY BUS RAPID TRANSIT PROJECT
Construction is in progress.  For current traffic information Click here.

  • Traffic control and work zones will be in place and changing frequently, use caution and look for flaggers for direction.
  • Expect traffic delays.

 

2018 PREVENTIVE MAITENANCE PROGRAM
This schedule contains temperature sensitive work and may be modified if weather conditions are unfavorable.

Thursday 8/16
Pavement Crack Sealing
Longley Ln: Houston Dr to Rock Blvd

Cashill Blvd: McCarran Blvd to Skyline Blvd

Airway Dr: Neil Rd to Longley Ln

Neil Rd: Del Monte Ln to McCarran Blvd

Del Monte Ln: Neil Rd to View Crest Dr

Lakeside Dr: Huffaker Ln to north side park gate

Foothill Rd: Virginia St to Caribou Rd

Carat Dr: Double Diamond Pkwy to Steamboat Pkwy

Rio Wrangler Pkwy: Western Skies Dr to Steamboat Pkwy

Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Wedge Pkwy: Mount Rose Hwy to Whites Creek Ln

Thomas Creek Rd: Zolezzi Ln to Mount Rose Hwy

Arrowcreek Pkwy: Thomas Creek Rd to private entrance gate

Eastlake Blvd: cattle guard at north end

 Pavement Patching
University Terrace: Vine St to Sierra St

Ralston St: Fifth St to University Terrace

Sierra St: Virginia St to California Ave

Micro Surfacing
Galleria Pkwy: Disc Dr to Los Altos Pkwy

Chip Seal
Los Altos Pkwy: Vista Blvd to Goodwin Dr

Pavement Striping – NIGHT WORK (7:00 PM to 5:00 AM)
Galleria Pkwy: Disc Dr to Los Altos Pkwy

 

Friday 8/17
Pavement Crack Sealing
Longley Ln: Houston Dr to Rock Blvd

Cashill Blvd: McCarran Blvd to Skyline Blvd

Airway Dr: Neil Rd to Longley Ln

Neil Rd: Del Monte Ln to McCarran Blvd

Del Monte Ln: Neil Rd to View Crest Dr

Lakeside Dr: Huffaker Ln to north side park gate

Foothill Rd: Virginia St to Caribou Rd

Carat Dr: Double Diamond Pkwy to Steamboat Pkwy

Rio Wrangler Pkwy: Western Skies Dr to Steamboat Pkwy

Steamboat Pkwy: Damonte Ranch Pkwy to Rio Wrangler Pkwy

Wedge Pkwy: Mount Rose Hwy to Whites Creek Ln

Thomas Creek Rd: Zolezzi Ln to Mount Rose Hwy

Arrowcreek Pkwy: Thomas Creek Rd to private entrance gate

Eastlake Blvd: cattle guard at north end

Pavement Patching
Sierra St: Virginia St to California Ave

Sixth St: Ralston St to Virginia St

Arlington Ave: First St to Sixth St

Liberty St: Arlington Ave to Center St

Chip Seal
Red Rock Rd: Bird Springs Rd to Spoke Rd

Saturday 8/18
Micro Surfacing
Larkin Cir: Greg St to cul-de-sac

Spice Islands Ct: Spice Islands Dr to cul-de-sac

 

ITS PROJECT – PHASE 2A
Work will include conduit and pull box installation at the following locations:

  • N Virginia St between Comstock and 15th St – Work complete
  • Wells St EB on ramp, shoulder area – Work complete
  • McCarran between Greg and Nugget – Night work begins week of 8/26-9/7; southbound slow lane closure.
  • McCarran between Prater and Baring – Day work begins week of 9/10-9/28; occasional shoulder closure northbound direction.

 

SOUTHEAST CONNECTOR PROJECT
From Greg St to South Meadows Pkwy and Veterans Pkwy (5.5 miles)

  • The Southeast connector is open to traffic. The speed limit is 45 mph. Look for traffic signs and use caution as everyone becomes familiar with the new roadway, signalized intersections, and the multi-use path.
  • Intermittent shoulder closures and single lane closures in specific locations will occur over the next several months.Details will be provided on this weekly report.
  • More information is available at the project website www.SouthEastConnector.com.

 

 

 