Weekly Traffic Control Report

August 15, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM

This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Thursday 8/15/2019
Slurry Seal
Veterans Parkway: South Meadows Parkway to Geiger Grade

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
South Meadows Parkway: Gateway Drive to Double Diamond Parkway

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Veterans Parkway: South Meadows Parkway to Geiger Grade
Sierra Center Parkway: Virginia Street to Maestro Drive
Maestro Drive: Colbert Drive to Double R Boulevard

Friday 8/16/2019
Slurry Seal
Veterans Parkway: South Meadows Parkway to Geiger Grade

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
Neil Road: Neil Lane Round-a-Bout to McCarran Boulevard
Del Monte Lane: Bonde Lane to Neil Lane Round-a-Bout

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Veterans Parkway: South Meadows Parkway to Geiger Grade
South Meadows Parkway: Gateway Drive to Double Diamond Parkway
Toll Road: Geiger Grade Road to Rim Rock Drive

Saturday 8/17/2019
Slurry Seal
Wedge Parkway: Mt. Rose Highway to De Spain Lane
Campus Way: Neil Road to Sierra Center Parkway

Sunday 8/18/2019
Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Wedge Parkway: Mt. Rose Highway to De Spain Lane
Campus Way: Neil Road to Sierra Center Parkway
Veterans Parkway: South Meadows Parkway to Geiger Grade
South Meadows Parkway: Gateway Drive to Double Diamond Parkway
El Rancho Drive: Clearacre Lane to Moorpark Court
Neil Road: Neil Lane Round-a-Bout to McCarran Boulevard
Del Monte Lane: Bonde Lane to Neil Lane Round-a-Bout

Monday 8/19/2019
Slurry Seal
Veterans Parkway: South Meadows Parkway to Geiger Grade

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Veterans Parkway: South Meadows Parkway to Geiger Grade
South Meadows Parkway: Gateway Drive to Double Diamond Parkway

Tuesday 8/20/2019
Slurry Seal
Veterans Parkway: South Meadows Parkway to Geiger Grade

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Veterans Parkway: South Meadows Parkway to Geiger Grade
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
Maestro Drive: Colbert Drive to Double R Boulevard

Wednesday 8/21/2019
Slurry Seal
Veterans Parkway: South Meadows Parkway to Geiger Grade

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
Sparks Boulevard: Interstate-80 to E Prater Way

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Veterans Parkway: South Meadows Parkway to Geiger Grade
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
Neil Road: Neil Lane Round-a-Bout to McCarran Boulevard
Del Monte Lane: Bonde Lane to Neil Lane Round-a-Bout

Thursday 8/22/2019
Slurry Seal
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road

Slurry Seal (Nightwork 7:00 PM to 5:00 AM)
Sparks Boulevard: Interstate-80 to E Prater Way

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road
Sparks Boulevard: Interstate-80 to E Prater Way
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue

Friday 8/23/2019
Slurry Seal
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Zolezzi Lane: Arrowcreek Parkway to Thomas Creek Road
Sparks Boulevard: Interstate-80 to E Prater Way
S Rock Boulevard: Glendale Avenue to Center of Truckee Bridge
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue

Saturday 8/24/2019
Slurry Seal
Highland Ranch Parkway: Sun Valley Road to Pyramid Highway

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

From Newlands Cir to Booth St

The project is now substantially complete.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive

Lane closures for traffic signal conduit installation.

 

RENO CONSOLIDATED 19-01 – SUTRO STREET, LAKE STREET, FIRST STREET AND STATE STREET

The project will involve pavement rehabilitation and reconstruction on State Street from Virginia Street to Sinclair Street, First Street from Center Street to Lake Street, and Lake Street from the southern approach of the Truckee River bridge to First Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the construction zones from 7am-6pm. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions. Access will be maintained to your property for the duration of the project; however, we will coordinate driveway closures individually if your access is being reconstructed. There is also a potential for short traffic delays during asphalt removal and paving operations but we will do our best to get you to and from your residence or business as quickly and safely as possible.

During construction, the RTC RIDE bus service (Sierra Spirit and Routes 1, 5, 9, 13, 14, and 19) may be temporarily impacted within the project area. However, any detours or changes to bus stop locations will be noted in advance at the affected bus stop.

Starting August 19, 2019, at 7:00 a.m. through August 23, 2019 at 6:00 p.m.:

  • State Street
    • From Virgina to Sinclair closed to thru traffic. Construction crews will be working on concrete improvements on the south side of the roadway.
    • Businesses and residences within the closure will be provided eastbound access from Virginia and Center. Westbound traffic will be detoured at Sinclair to Liberty to Center.
    • Pedestrian detours will be in place during construction.
  • First Street
    • From Center to Lake open to westbound traffic only. Eastbound traffic will be detoured at Center to Second to Lake Street. Construction crews will be working on concrete imporvements on the north side of the roadway.
    • Pedestrian detours will be in place during construction.
  • Lake Street
    • From Mill Street to Second Street open to traffic in both directions in the construction zone.

 

 

RENO CONSOLIDATED 19-02 Project – North Hills Boulevard from Golden Valley Road to Buck Drive and The intersection of Hunter Lake Drive at Foster Drive.

North Hills Blvd:

  • Demolition and drainage work with shoulder closures.
  • Two-way traffic maintained at all times. Some sections, mostly north of Beckwourth, one lane closure, with flaggers to direct traffic one way at the time.

Hunter Lake/Foster Dr:

Construction to start by the end of August.

 

RENO CONSOLIDATED 19-03 Project – Sierra Highlands Drive, Colbert Drive, Hammill Lane, Ralston Street, and Ohm Place.

Ralston Street between University Terrace and 11th Street; Starting August 5th at 7:00 am thru October 3rd construction will be in progress with concrete removals. Traffic controls in place along Ralston Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the construction zones from 7am-7pm, Monday through Friday. During construction, we will also provide access for trash pickup on Tuesdays – please place your Green Waste cans out on Tuesday for pickup. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions.

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting August 19, 2019, at 7:00 a.m. through Saturday August 23, 2019:

  • 15th Street
    • From C Street to Prater Way open to traffic in both directions in the construction zone. Construction crews will be working on concrete and improvements.
    • From Victorian Avenue to C Street closed to thru traffic. Businesses and residences within the closure will be provided access from Victorian Avenue or the Alley on 16th Street between Victorian Avenue and C Street. Traffic will be detoured at 15th Street to 16th to C Street or Victorian Avenue and to Victorian Plaza Circle to C Street or Victorian Avenue. Construction crews will be working on landscaping, median, and concrete improvements.
  • El Rancho Drive from G Street to Oddie Blvd will be open to traffic in both directions. Traffic lanes will shift for construction of concrete improvements on the west side of the roadway.
  • Traffic on Franklin Way from East Greg Street to Spice Islands Drive will be open to northbound traffic only in the construction zone. Southbound traffic will be detoured at Greg Street to Purina Way to Spice Island Drive. Construction crews will be working on concrete improvements.

Pedestrian detours will be in place during construction.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Between Plumb Ln and Mt Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Regency Way to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    • Tahoe/Saint Lawrence (between Virginia St and Forest St)
    • Moran (between Virginia St and Center St)
    • East Taylor (between Virginia St and Center St)
    • Martin (between Virginia St and Haskell St)
    • Arroyo (between Virginia St and Haskell St)

For the most up to date information on traffic control, please visit the Virginia Street Website.  

 