Weekly Traffic Control Report

August 11, 2023

2023 PREVENTIVE MAINTENANCE PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874
**Note: This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Sunday 8/13/2023
Micro-Surfacing (Slurry) 5pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
E. Greg Street: McCarran Boulevard to R/R Crossing
Wedekind Road: Sutro Street to Lund Lane
Coliseum Way: Peckham Lane to Moana Lane
Talbot Lane: Turn-Around at South End to Redfield Parkway
Meadowood Mall Link: Meadowood Mall Circle to McCarran Boulevard
Meadowood Mall Way: Kietzke Lane to Virginia Street
Louie Lane: Barron Way to Longley Lane
Patriot Boulevard: Virginia Street to Colbert Lane

Monday 8/14/2023
Micro-Surfacing (Slurry) 5pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
E. Greg Street: McCarran Boulevard to R/R Crossing
Wedekind Road: Sutro Street to Lund Lane
Coliseum Way: Peckham Lane to Moana Lane
Talbot Lane: Turn-Around at South End to Redfield Parkway
Meadowood Mall Link: Meadowood Mall Circle to McCarran Boulevard
Meadowood Mall Way: Kietzke Lane to Virginia Street
Louie Lane: Barron Way to Longley Lane
Patriot Boulevard: Virginia Street to Colbert Lane

Tuesday 8/15/2023
Pavement Striping 7pm – 7am 
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
E. Greg Street: McCarran Boulevard to R/R Crossing
Wedekind Road: Sutro Street to Lund Lane
Coliseum Way: Peckham Lane to Moana Lane
Talbot Lane: Turn-Around at South End to Redfield Parkway
Meadowood Mall Link: Meadowood Mall Circle to McCarran Boulevard
Meadowood Mall Way: Kietzke Lane to Virginia Street
Louie Lane: Barron Way to Longley Lane
Patriot Boulevard: Virginia Street to Colbert Lane

Wednesday 8/16/2023
Micro-Surfacing (Slurry)
College Drive: Village Boulevard to State Route 431
Mays Boulevard: Southwood Boulevard to Lakeshore Boulevard

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
College Drive: Village Boulevard to State Route 431
Mays Boulevard: Southwood Boulevard to Lakeshore Boulevard

Thursday 8/17/2023
Micro-Surfacing (Slurry)
Lakeshore Boulevard: State Route 28 to Village Boulevard

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
Lakeshore Boulevard: State Route 28 to Village Boulevard

Friday 8/18/2023
Micro-Surfacing (Slurry)
Southwood Boulevard: State Route 28 to State Route 28

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard
Southwood Boulevard: State Route 28 to State Route 28

Saturday 8/19/2023
Micro-Surfacing (Slurry)
Terminal Way: Plumb/Terminal to Plumb/Terminal

Pavement Striping 7pm – 7am
Sparks Boulevard: Baring Boulevard to Pyramid Highway
Disc Drive: Sparks Boulevard to Vista Boulevard

4TH STREET AND WOODLAND AVENUE ROUNDABOUT INSTALLATION
RTC Project Manager, Garrett Rodgers, P.E. – (775) 332-2139

Construction of the eastbound travel lanes and roundabout has begun. Intermittent flagging operations at this intersection could cause delays of up to 20 minutes. Normal construction hours are 7:00 a.m. – 5:00 p.m., Monday through Friday.

Mesa Park Road is closed again and will remain closed through Phase 2 of construction. This closure has been extended through late September while construction of the following occurs:

  • 4th Street eastbound lanes and islands
  • Southern portion of the roundabout

The project is anticipated to be completed by Fall of 2023.
For more information, visit https://www.4th-woodland-roundabout.com/

ARROWCREEK PARKWAY REHABILITATION PROJECT
RTC Project Manager, Kimberly Diegle, P.E. – (775) 335-1844

Lane reductions will be in place on Arrowcreek Parkway, Damonte Ranch Parkway, and S. Virginia Street in the project area.

CALIFORNIA AVENUE RECONSTRUCTION-NEWLANDS CIRCLE TO ARLINGTON PROJECT
RTC Project Manager, Scott Gibson, P.E. – (775) 335-1874

Paving has been completed and the contractor is completing final activities like raising utilities, striping and landscaping.

HOLCOMB AVENUE REHABILITATION PROJECT
RTC Project Manager, Amanda Callegari, P.E. – (775) 335-1881

Two-way traffic will be maintained on Holcomb during striping and utility operations.

Parking on street will be limited within areas of improvements until striping is completed.

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE 4 PROJECT
RTC Project Manager, Alex Wolfson, P.E., PTOE, RSP1 – (775) 332-2139

Minor shoulder closures may occur for final construction items.

ODDIE/WELLS PROJECT – PYRAMID WAY (SPARKS) TO I-80 WESTBOUND RAMPS (RENO)
RTC Project Manager, Maria Paz Fernandez, P.E. – (775) 335-1861

  • One traffic lane in each direction will be maintained along Oddie Boulevard.

Phase 1 – Pyramid Way to Sullivan Lane (Sparks):

  • Construction crews are finishing landscape work.

Phase 2 – Sullivan Lane (Sparks) to east of US 395 Ramps (Reno):

  • New traffic pattern – two-way traffic on the northside of Oddie Boulevard
  • Construction crews working on southside of Oddie Boulevard installing underground conduit for street lighting, storm drain and retaining curb

Phase 3 – east of US 395 Ramps to Sutro Street (Reno):

  • Intermittent traffic lane shifts during construction hours.
  • Traffic swapped to the southside.
  • Montello Street (half intersection closure) Monday, July 24 through Friday, September 29. Detours in place.
  • Construction crews working on storm drain installation and underground conduit.
  • US 395 Ramps overnight weekend closures starting Thursday, August 10 at 7:00pm through Monday, August 14 at 5:00am.

Phase 4 – Sutro Street to I-80 Ramps (Reno):

  • TENTATIVE – Storm Drain (underground) work to start August 21. Intermittent traffic lane shifts during construction hours.

For additional information on construction status and time-lapse pictures, visit the project website at http://Oddiewellsproject.com

SKY VISTA WIDENING AND REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

Lane and shoulder closures will be in place.

 

See weekly traffic report archive