Weekly Traffic Control Report

August 2, 2019

2019 PREVENTIVE MAINTENANCE PROGRAM
This schedule contains weather/temperature sensitive work and may be modified if weather conditions are unfavorable.

Friday 8/2/2019

Slurry Seal
Eagle Canyon Drive: Pyramid Highway to W Calle De La Platta

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Eagle Canyon Drive: Pyramid Highway to W Calle De La Platta
Seventh Street: Robb Drive to Virginia Street

Saturday 8/3/2019

Slurry Seal
Eagle Canyon Drive: Pyramid Highway to W Calle De La Platta

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Eagle Canyon Drive: Pyramid Highway to W Calle De La Platta
South Meadows Parkway: Double R Boulevard to Cul-De-Sac

Sunday 8/4/2019

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Kirman Avenue: Kuenzli Street to Ryland Street
Condor Way: Airmotive Way to End of Street
Louise Street: Market Street to Mill Street
Automotive Way: Kietzke Lane to Market Street
S 15th Street: Hymer Avenue to Glendale Avenue
S 16th Street: Glendale Avenue to Hymer Avenue
S 18th Street: Glendale Avenue to Crane Way
S 19th Street: Hymer Avenue to Pacific Avenue
S 21st Street: Greg Street to Pacific Avenue
Pacific Avenue: S 21st Street to S 19th Street

Monday 8/5/2019

Slurry Seal
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road
El Rancho Drive: Clearacre Lane to Moorpark Court

Tuesday 8/6/2019

Slurry Seal
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road
David Allen Parkway: Kiley Parkway East to Fortunato Loop

Wednesday 8/7/2019

Slurry Seal
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Vista Boulevard: Brierley Way to Los Altos Parkway (South)
Red Rock Road: California State Line to Spoke Road
David Allen Parkway: Kiley Parkway East to Fortunato Loop
Lazy 5 Parkway: Pyramid Highway to David Allen Parkway

Thursday 8/8/2019

Slurry Seal
Red Rock Road: California State Line to Spoke Road
Red Rock Road: Adobe Drive to Moya Boulevard

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Red Rock Road: California State Line to Spoke Road
Red Rock Road: Adobe Drive to Moya Boulevard
South Meadows Parkway: Double R Boulevard to Cul-De-Sac

Friday 8/9/2019

Slurry Seal
Red Rock Road: California State Line to Spoke Road
Red Rock Road: Adobe Drive to Moya Boulevard

Pavement Striping (Nightwork 7:00 PM to 5:00 AM)
Red Rock Road: California State Line to Spoke Road
Red Rock Road: Adobe Drive to Moya Boulevard

 

 

CALIFORNIA AVENUE AND KEYSTONE AVENUE INTERSECTION ENHANCEMENT

From Newlands Cir to Booth St

Starting July 11, 2019, at 6:00 a.m. through August 8, 2019:

  • California Ave/Keystone Ave Intersection will be closed to traffic in both directions in the construction zone.
  • Booth St is now open to traffic between Westfield Ave and Idlewild Dr.  and Business access off Booth St will be provided between California Ave and Westfield Ave during this  same time period.
  • Keystone Ave is now open to northbound and Southbound traffic from and to Foster.
  • Keystone Ave will not be accessible from California Ave.

Detours will be in place during construction. For safety reasons, there is no pedestrian access through California Ave from Newlands Cir to Booth St during construction.

In early August the California Ave/Keystone Ave intersection will reopen before Reno High School is back in session.

 

NORTH VALLEYS 3 INTERSECTION IMPROVEMENT PROJECT

New traffic signal at the intersection of N. Virginia and Lemmon Drive

Lane closures for traffic signal conduit installation.

 

RENO CONSOLIDATED 19-03 Project – Sierra Highlands Drive, Colbert Drive, Hammill Lane, Ralston Street, and Ohm Place.

Ralston Street between University Terrace and 11th Street;  Starting August 5th at 7:00 am thru October 3rd construction will be in progress with traffic controls in place along Ralston Street.

For the safety of you and your vehicle, parking on the street will be prohibited within the construction zones from 7am-7pm, Monday through Friday. During construction, we will also provide access for trash pickup on Tuesdays – please place your Green Waste cans out on Tuesday for pickup. For additional street parking, a nearby side street must be used; please adhere to the “no parking” restrictions.

Ohm Place from Mill Street to 500 feet south (NV Energy Corporate Yard entrance) contruction will begin August 5th thru the middle of October.  Traffic controls will be in place with Ohm Place closed for construction from 8/5 to 8/9 and again from 9/23 to 10/10.  NVE Business access will be detoured to the street west of Ohm Place.

 

RENO CONSOLIDATED 19-02 Project – North Hills Boulevard from Golden Valley Road to Buck Drive and The intersection of Hunter Lake Drive at Foster Drive.

North Hills Blvd:
Construction activities start on Monday August 5.
Traffic Control set up and minimal impact to traffic.
Demolition and drainage work with shoulder closures.

Hunter Lake/Foster Dr:
Construction to start by the end of August.

 

SPARKS CONSOLIDATED 19-01 – 15TH STREET, FRANKLIN WAY, HULDA COURT, AND EL RANCHO DRIVE

Starting July 29, 2019, at 7:00 a.m. through Saturday, August 3, 2019:

  • 15th Street
    • From C Street to Prater Way open to traffic in both directions in the construction zone.  Construction crews will be working on concrete improvements and clean up in preparation for Hot August Nights.
    • From Victorian Avenue to C Street closed to thru traffic.  Businesses and residences within the closure will be provided access from Victorian Avenue or the Alley on 16th Street between Victorian Avenue and C Street.  Traffic will be detoured at 15th Street to 16th to C Street or Victorian Avenue and to Victorian Plaza Circle to C Street or Victorian Avenue.  Construction crews will be working on utilities, median, and concrete improvements.
  •  C Street from 16th to 15th Street open to eastbound traffic only in the construction zone.  Traffic will be detoured at 15th Street to Victorian Avenue to 16th Street.  Construction crews will be working on utilities and concrete improvements
  • El Rancho Drive from G Street to Oddie Blvd will be open to traffic in both directions.  Traffic lanes will be moved over to the west half of the roadway for construction of concrete improvements on the east side and roadway paving.
  • Traffic on Franklin Way from East Greg Street to Spice Islands Drive will be open to southbound traffic only in the construction zone.  Northbound traffic will be detoured at Spice Islands Drive to Purina Way to East Greg Street.  Construction crews will be working on concrete improvements.
  • Hulda Court traffic will be impacted with driveway closures for concrete improvements.

Starting August 8, 2019, at 7:00 a.m. through Saturday August 10, 2019:

  • 15th Street from Victorian to Prater Way open to traffic in both directions for Hot August Nights.
  • C Street from 16th to 15th Street eopne to traffic in both directions for Hot August Nights.
  • El Rancho Drive from G Street to Oddie Blvd will be open to traffic in both directions.  Traffic lanes will be moved over to the west half of the roadway for construction of concrete improvements on the east side and roadway paving.
  • Traffic on Franklin Way from East Greg Street to Spice Islands Drive will be open to northbound traffic only in the construction zone.  Southbound traffic will be detoured at Greg Street to Purina Way to Spice Island Drive.  Construction crews will be working on concrete improvements.

Pedestrian detours will be in place during construction.  El Rancho Drive pedestrian detour will be from Oddie Blvd into Paradise Park, down to Elementary Drive, and south to G St using existing sidewalk on the west side El Rancho Dr.  For safety reasons, there is no pedestrian access on the east side of El Rancho Drive from G St to Oddie Blvd during construction.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION

Construction is occurring from Plumb Ln through Mt Rose St and on select side streets within the Midtown areas.

  • Between Plumb Ln and Mt Rose St traffic will be reduced to southbound only, northbound traffic will be detoured at Wells Ave to Vassar St.
  • The following side streets are also under construction and closed to through traffic, local access is provided:
    • Tahoe/Saint Lawrence (between Virginia St and Forest St)
    • Moran (between Virginia St and Center St)
    • East Taylor (between Virginia St and Center St)
    • Martin (between Virginia St and Haskell St)
    • Arroyo (between Virginia St and Haskell St)

For the most up to date information on traffic control, please visit the Virginia Street Website.  

 

See weekly traffic report archive