Weekly Traffic Control Report

April 23, 2020

E PRATER WAY REHABILITATION PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

4/20 – 10/1

The Regional Transportation Commission (RTC) of Washoe County begins construction on a roadway rehabilitation project on East Prater Way between McCarran Boulevard and Sparks Boulevard. Two-way traffic will continue within the construction zone, with one lane in each direction. The project is expected to take about six months to complete. See attached Project Location Map by clicking here.

  • April 20 – June 19: The first phase of construction, expected to take about three months, will shift traffic to the south side of Prater Way. Signalized intersections at Howard Drive and Pullman Drive will remain open, but some side streets, including Woodside Drive, Marracco Drive, East Greenbrae Drive and Station Street will be closed to traffic at Prater Way. Traffic from side streets will be detoured to Howard Drive or Pullman Drive.

 

The RTC appreciates the community’s patience during the construction process and reminds the community that the roadway will be smoother and safer when the improvements are complete. This project represents a $5.6-million investment in our community funded with fuel tax funds.

Construction has been classified as an essential service by Governor Sisolak. Construction crews have implemented safety and social-distancing precautions.

 

ITS PHASE 2B PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

4/27– 5/15

No work planned waiting on NDOT project on I580.

 

RENO CONSOLIDATED 19-01 PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

4/20 – 5/1

The Regional Transportation Commission (RTC) of Washoe County is almost finished with the reconstruction of the segment of Sutro Street between Selmi Drive and North McCarran Boulevard. The reconstruction includes replacing the roadway, sidewalks, curbs and gutters.

Drivers can expect detours during the construction process, for everyone’s safety:

  • April 20 – May 1: Sutro Street between Selmi Drive and North McCarran Boulevard will be closed to traffic. Drivers will be detoured to Clear Acre Lane and Selmi Street. Drivers will still be able to exit from the Maverik gas station onto Sutro Street.

 

The RTC appreciates the community’s patience during the construction process and reminds the community that the roadway will be smoother and safer when the improvements are complete. This project is part of a larger project, called Reno Consolidated 19-01, which represents a $4.3 million investment in our community funded with fuel tax funds.

 

TE SPOT 8 – PACKAGE 1
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

4/27-5/1

Lane closures at McCarran at Neil and Keystone at 7th for signal equipment installation

 

TE SPOT 8 – PACKAGE 2
RTC Project Manager, Andrew Jayankura, P.E., PTOE. – (775) 332-2139

Traffic signal at Red Rock/Silver Lake is now operational. *Caution* – westbound-left (Silver Lake to Red Rock movement) is a yield condition until permanent striping is done in late April/early May.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

South Virginia Street:

  • Plumb Ln to Mt Rose St/Holcomb Ave: two-way traffic with isolated shoulder and street parking closures to install project appurtenances.
  • Mt Rose St/Holcomb Ave to Center St/Mary St: traffic is reduced to southbound only.
    • Northbound traffic through traffic is detoured at Holcomb Ave to Center St to Liberty St.
    • Northbound traffic can also use Mt Rose St to Plumas St to Liberty St.
  • Center St/Mary St to Liberty St: traffic is detoured.
    • Southbound traffic is detoured to Liberty St. to Sinclair St to Holcombonb Avenue.
    • Northbound traffic is detoured to Holcomb Ave to Center St. Travelers with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave, Center St, Plumas St, or Haskell St; which include:
      • Pueblo St, Arroyo St, Vassar St, La Rue Ave, Martin St, Taylor St, Cheney St, St Lawrence Ave, Thoma St, California St, Moran St, and Stewart St.

Center Street/Mary Street at Virginia Street:

  • Roundabout work in this area requires closure of Mary St at Virginia St.
  • Detours will be in place.

North Virginia Street:

  • West Stadium Parking Garage to 9th Street: is reduced to one-lane in each direction

 

For the most up to date information on traffic control, please visit the Virginia Street Website.  