ITS PHASE 2B PROJECT
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

4/20– 4/27

No Work planned

 

RENO CONSOLIDATED 19-01 PROJECT
RTC Project Manager, Judy Tortelli, P.E. – (775) 335-1824

4/13 – 4/28

The Regional Transportation Commission (RTC) of Washoe County is almost finished with the reconstruction of the segment of Sutro Street between Selmi Drive and North McCarran Boulevard. The reconstruction includes replacing the roadway, sidewalks, curbs and gutters.

Drivers can expect detours during the construction process, for everyone’s safety:

  • April 13 – April 28: Sutro Street between Selmi Drive and North McCarran Boulevard will be closed to traffic. Drivers will be detoured to Clear Acre Lane and Selmi Street. Drivers will still be able to exit from the Maverik gas station onto Sutro Street.

The RTC appreciates the community’s patience during the construction process and reminds the community that the roadway will be smoother and safer when the improvements are complete. This project is part of a larger project, called Reno Consolidated 19-01, which represents a $4.3 million investment in our community funded with fuel tax funds.

 

TE SPOT 8 – PACKAGE 1
RTC Project Manager, Blaine Petersen, P.E. – (775) 335-1871

4/20-4/30

Lane closures at Evans and Enterprise then McCarran at Neil for signal equipment installation

 

TE SPOT 8 – PACKAGE 2
RTC Project Manager, Andrew Jayankura, P.E., PTOE. – (775) 332-2139

Traffic signal at Red Rock/Silver Lake is now operational. *Caution* – westbound-left (Silver Lake to Red Rock movement) is a yield condition until permanent striping is done in late April/early May.

 

VIRGINIA STREET BUS RAPID TRANSIT EXTENSION
RTC Project Manager, Jeff Wilbrecht, P.E. – (775) 335-1872

South Virginia Street:

  • Plumb Ln to Mt Rose St/Holcomb Ave: two-way traffic with isolated shoulder and street parking closures to install project appurtenances.
  • Mt Rose St/Holcomb Ave to Center St/Mary St: traffic is reduced to southbound direction only.
    • Northbound traffic through traffic is detoured at Holcomb Ave to Center St to Liberty St.
    • Northbound traffic can also use Mt Rose St to Plumas St to Liberty St.
  • Center St/Mary St to Liberty St: traffic is detoured.
    • Southbound traffic is detoured to Liberty St. to Sinclair St to Holcombonb Avenue.
    • Northbound traffic is detoured to Holcomb Ave to Center St.

Travelers with the final destination within the construction zone can utilize one of the many side streets from Holcomb Ave, Center St, Plumas St, or Haskell St; which include:

    • Pueblo St, Arroyo St, Vassar St, La Rue Ave, Martin St, Taylor St, Cheney St, St Lawrence Ave, Thoma St, California St, Moran St, and Stewart St.

Center Street and Mary Street at Virginia Street:

  • Roundabout work in this area requires closure of Mary St at Virginia St.
  • Detours will be in place.

North Virginia Street:

  • West Stadium Parking Garage to 9th Street: is reduced to one-lane in each direction