PROJECT DETAILS
RTC Project No. 211005

RTC Project Manager (PM)
Maria Paz Fernandez, P.E.
(775) 335-1861
mpazfernandez@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm:  To be determined
Construction Contractor:  To be determined

PROJECT DESCRIPTION
Design and construct a two-way cycle track on Center Street from Cheney Street to 9th Street.

LATEST NEWS
On April 2019 the RTC Board approved the RTC Downtown Feasibility Study preferred alternative.  The Request For Proposals (RFP) was advertised and the received proposals are being evaluated for selection.

SCHEDULE
Planning:
April 2019
Environmental: N/A
Preliminary Design: to be determined
Final Design:  to be determined
Construction: to be determined

FINANCIAL INFORMATION
T
otal Project Estimate:
Amount Approved: $1,080,000.00
Funding Source: RTC Fuel Tax