PROJECT DETAILS
RTC Project No. 0531014

RTC Project Manager (PM)
Garrett Rodgers
(775) 332-2139
grodgers@rtcwashoe.com

RTC Engineering Department
(775) 348-0171

Design Firm: CA Group

Construction Contractor: To be determined

PROJECT DESCRIPTION
The Steamboat Parkway Improvement Project includes several upgrades and widening along Steamboat Parkway between Damonte Ranch Parkway and Veterans Parkway. The following are included in this project:

  • Widen the intersection of Steamboat Parkway and Veterans Parkway.
    • Add an additional eastbound through-lane.
    • Add an additional north-to-west turn lane.
    • Add an additional south-to-east turn lane.
    • Add an additional west-to-north turn pocket.
  • Widen Steamboat Parkway from Marketplace Drive to Veterans Parkway from four lanes to six lanes (three lanes in each direction).
    • Realign/adjust the south-to-east lanes at Damonte Ranch Parkway to Steamboat Parkway for better lane utilization.
    • Remove all Flashing Yellow Arrow Signals on Steamboat Parkway at Marketplace Drive and Veterans Parkway due to safety.

Steamboat Improvements – Preliminary Rollplot (April 2022)
Steamboat Improvements – Preliminary Landscape (April 2022)

LATEST NEWS
The RTC and consultant engineer have completed final design and are working through right of way acquisitions. Construction will follow with anticipated start of early 2024.

 

Subscribe for Steamboat Parkway Updates



Virtual Community Meeting – May 16, 2022
RTC Steamboat Parkway FAQs

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Current to November 2022
Final Design: November 2022 to May 2023
Construction: Spring 2024

FINANCIAL INFORMATION
Total Project Estimate:
$9,929,796
Funding Source: Regional Road Impact Fee (RRIF)


Post updated on: September 6, 2023

Steamboat Parkway Improvement Project Map