PROJECT DETAILS
RTC Project No. 0227004

RTC Project Manager (PM)
Alex Wolfson, P.E., PTOE, RSP1
(775) 335-1880
awolfson@rtcwashoe.com

RTC Engineering Department

(775) 348-0171

Design Firm:  Kimley-Horn and Associates

Construction Contractor:  To be determined

PROJECT DESCRIPTION
Sparks Intelligent Corridors project will provide additional information to drivers in the Spanish Springs area regarding travel delays and recommended alternate routes. The project also proposes to automatically adjust traffic signal timings based on delays resulting from incidents or construction.

In addition, the project will install traffic signal fiber at the following locations:

  • Baring Boulevard – Sparks Boulevard to Vista Boulevard
  • Vista Boulevard – Baring Boulevard to Los Altos Parkway
  • Los Altos Parkway – Sparks Boulevard to Ion Drive

LATEST NEWS
Development and testing of software is currently underway. Installation of traffic signal fiber will occur in 2024.

SCHEDULE
Planning:  N/A
Environmental: N/A
Preliminary Design: October 2022 –  June 2023
Final Design: Summer 2023 – Fall 2023
Construction: Winter 2023 – Spring 2024

FINANCIAL INFORMATION
Total Project Estimate:$1,500,000
Funding Source:  RTC Fuel Tax

 