PROJECT DETAILS
RTC Project No. 222027

RTC Project Manager (PM)
Judy Tortelli, P.E.
(775) 335-1824
jtortelli@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: CFA

Construction Contractor: Spanish Springs Construction, Inc.

PROJECT DESCRIPTION
Rehabilitation and/or reconstruction the following streets:
• 15th Street from C Street to Prater Way
• Franklin Way from the Union Pacific Rail Road crossing to East Greg Street
• Sidewalk on the east side of El Rancho Drive from G Street to Oddie Boulevard

Construction work may include removal and replacement of the roadway structural section, mill and fill, sidewalk and curb and gutter replacement as necessary, correction of localized drainage deficiencies, reconstruction of existing curb ramps, reconstruction of driveways, and other incidentals necessary for the rehabilitation and/or reconstruction of the street segments within the Project limits

LATEST NEWS
Construction of all roadway work is complete. Rectangular rapid flashing beacons are scheduled for installation in February 2020.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Complete
Final Design: Complete
Construction: July 2019 to May 2020

FINANCIAL INFORMATION
Total Project Estimate: $1,400,000
Amount Approved: $3,200,000
Funding Source: RTC Fuel Tax

Currently, the project is approved for design, construction, and engineering during construction.

 

Post updated on: January 27, 2020