PROJECT DETAILS
RTC Project No. 512017

RTC Project Manager (PM)
Warren Call, P.E.
775-335-1881
Wcall@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm:
Atkins North America

Construction Contractor: To be determined

PROJECT DESCRIPTION
Widening from one lane in each direction to two lanes in each direction with a center turn lane and rehabilitation of Sky Vista Parkway from Silver Lake Drive to just east of Vista Knolls Parkway. Project will include street lighting, eight-foot sidewalks and five-foot bike lanes on both sides of the roadway.

LATEST NEWS
Currently under preliminary design. Geotechnical Exploration is complete.

Schedule
Planning: Winter 2018-2019
Preliminary Design: February 2020 to October 2020
Final Design: October 2020 to January 2021
Construction: Spring 2022

FINANCIAL INFORMATION
Total Project Estimate: $11,300,000
Funding Source: RTC Fuel Tax

Post updated on: September 28, 2020