PROJECT DETAILS
RTC Project No. 0711001

RTC Project Manager (PM)
Bryan Byrne
(775) 335-1865
bbyrne@rtcwashoe.com

RTC Engineering Department
(775) 348-0171

Design Firm: Jacobs Engineering Group, Inc.

Construction Contractor: To be determined

PROJECT DESCRIPTION
Project includes removal and replacement of existing bridge that was constructed in 1937.

LATEST NEWS
RTC and Jacobs Engineering, are commencing the data collection and necessary permitting to begin preliminary design on the Sierra Street Bridge Replacement Project.

SCHEDULE
Planning: N/A
Environmental: Fall 2024 – Fall 2025
Preliminary Design: May 2023 – May 2024
Final Design: June 2024 – May 2026
Construction: To be determined

FINANCIAL INFORMATION
Total Project Estimate: $33,822,128
Funding Source: Federal

  • Bridge Formula Program Off-System – $3.5M (PE) and $12.5M (CON)
  • Surface Transportation Block Grant (STBG) Bridge – $10.8M (CON)

 

Post updated on: August 28, 2023

Sierra Street Bridge Replacement Project Map