PROJECT DETAILS
RTC Project No. 212064

RTC Project Manager (PM)
Judy Tortelli, P.E.
(775) 335-1824
jtortelli@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: Nichols Consulting Engineers

Construction Contractor: Granite Construction Company

PROJECT DESCRIPTION
Rehabilitation and/or reconstruction of the following streets:

  • Mayberry Drive from Memory Lane to California Avenue
  • California Avenue from Hunter Lake Drive to Booth Street

Construction work may include removal and replacement of the roadway structural section, mill and fill, sidewalk and curb and gutter replacement as necessary, correction of localized drainage deficiencies, reconstruction of existing curb ramps, reconstruction of driveways, and other incidentals necessary for the rehabilitation and/or reconstruction of the street segments within the Project limits.

May 27 to June 30, 2020

Virtual Project Presentation

Presentation (pdf format)

***Comment Form*** please submit comments by June 30, 2020

Notice

Post Card

FAQs First Street

FAQs Mayberry Drive

Vicinity Map

Cross Sections

Conceptual Design – California Avenue & Mayberry Drive Intersection

Conceptual Design – California Avenue from Hunter Lake Drive to Booth Street

***Comment Matrix*** (coming in July 2020)

LATEST NEWS
Granite Construction Company completed all underground storm drain work and are constructing retaining walls.  The geometric improvements at the California Avenue and Mayberry Drive intersection are in place.  Coordination with NV Energy to relocate power poles is ongoing. Power pole relocations will be complete after the retaining wall is placed.

One lane in each direction on Mayberry Drive will be maintained during the concrete placement phase of construction. For the safety of the workers and the community, California Avenue from Hunter Lake Drive to Mayberry Drive will be closed to thru traffic. Please adhere to traffic control signage and slow down while traveling through the construction zone. Construction is anticipated to be complete in August 2022.

SCHEDULE
Planning: September 2019 – January 2020
Environmental: N/A
Preliminary Design: January – March 2020
Final Design: April 2020 – January 2022
Construction: March  – August 2022

FINANCIAL INFORMATION
Total Project Estimate: $5,360,000
Funding Source: RTC Fuel Tax

 

Post updated on: May 27, 2022

Reno Consolidated 20-01 (Mayberry Drive, California Avenue, First Street) Project Map