PROJECT DETAILS
RTC Project No. 222028

RTC Project Manager (PM)
Judy Tortelli, P.E.
(775) 335-1824
jtortelli@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: Stantec

Construction Contractor: to be determined

PROJECT DESCRIPTION
Rehabilitation and/or reconstruction of Prater Way from Howard Drive to Sparks Boulevard.  Construction work may include removal and replacement of the roadway structural section, mill and fill, sidewalk and curb and gutter replacement as necessary, correction of localized drainage deficiencies, reconstruction of existing curb ramps, reconstruction of driveways, replacement of sanitary sewer infrastructure, and other incidentals necessary for the rehabilitation and/or reconstruction of the street within the Project limits.

A Fact Sheet, Map of the Project area, and other information are available for download below:
Map
Fact Sheet
Clear Zone Evaluation

Thursday, January 9, 2020 Public Kick-off Meeting
Notice
Presentation
Display Boards

LATEST NEWS
Topographic field survey, base mapping and geotechnical investigation are complete.  Preliminary design is underway and coordination with local agencies and stakeholders is ongoing.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: August – November 2019
Final Design: December – February 2020
Construction: April – October 2020

FINANCIAL INFORMATION
Total Project Estimate: $5,000,000
Amount Approved: $5,000,000
Funding Source: RTC Fuel Tax

 

Post updated on:  June 29, 2020