PROJECT DETAILS
RTC Project No. 512012

RTC Project Manager (PM)
Sara Going, P.E.
(775) 335-1897
sgoing@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: Headway Transportation

Construction Contractor:
Package 1 – Sierra Nevada Construction
Package 2 – Titan Electrical Contractors, Inc.
Package 3 – Sierra Nevada Construction
Package 3B – Sierra Nevada Construction

PROJECT DESCRIPTION
This project will construct some of the needed improvements to both pedestrian safety and intersection efficiency identified in the North Valleys Corridor study.

Package 1 (2016) includes pedestrian improvements at four locations on Stead Boulevard, Silver Lake Road, Sky Vista Parkway and Lemmon Drive and intersection geometric improvements at N Virginia Street and Golden Valley Road to accommodate truck turning movements.

Package 2 (2017) is complete, including the installation of signals and intersection improvements at Lemmon Drive/US 395 and Red Rock Road/Moya Boulevard.

Package 3 (2018) Construction of the new signal at the Lemmon Drive/N. Virginia Street intersection.

Package 3B (2020) North Valleys Phase 3B will install a right turn lane for southbound North Virginia Street at the intersection of Panther Drive and sidewalk and bus pads on North Virginia Street.

LATEST NEWS
Package 1: Construction is complete.

Package 2: Construction is complete.

Package 3: Construction is complete.

Package 3B: Construction began on September 30, 2021, and is estimated to be complete at the end of October 2021.

SCHEDULE
Planning: Complete
Environmental: N/A
Preliminary Design: Complete
Final Design: Complete
Construction: 2016 – 2021

FINANCIAL INFORMATION
Total Project Estimate: $5,136,500
Funding Source: Regional Road Impact Fee (RRIF)

 

Post updated on: September 30, 2021