MILL STREET CAPACITY AND SAFETY

Status: Upcoming Projects

PROJECT DETAILS
RTC Project No. 211007

RTC Project Manager (PM)
Kimberly Diegle, P.E.
(775) 335-1884
kdiegle@rtcwashoe.com

RTC Engineering Department
(775) 348-0171

Design Firm: Jacobs Engineering Group

Construction Contractor: To be determined

PROJECT DESCRIPTION
The Mill Street Capacity and Safety project limits are from 500 feet west of Kietzke Lane to Terminal Way, and is approximately 0.75 miles in total length. Proposed improvements include widening Mill Street from four to five lanes 300 feet west of  Kietzke Lane to the I-580 southbound entrance ramp,  a free-flow right turn from eastbound Mill Street to southbound 1-580, and a new signalized intersection at Mill Street and Golden Lane in conjunction with the closure of Mill Street access from Redwood Place and Louise Street. Intersection safety and operational improvements will be made by adding a raised center median through the project, allowing right-in / right-out only movements to/from Mill Street at the intersections of Reservation Drive and Matley Lane.  The project will also improve ADA accessible facilities, drainage facilities, and will underground existing overhead utilities.  The project excludes the I-580 interchange which was recently improved with NDOT’s Spaghetti Bowl Xpress (SBX) project.

LATEST NEWS
The RTC is  progressing the final design and right of way process for Mill Street improvements. Please visit www.millstreetwidening.com for additional information.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2022 – Winter 2022
Final Design: Spring 2023 – Summer 2024
Construction: Late 2024 through 2025

FINANCIAL INFORMATION
Total Project Estimate: $31,407,880
Funding Source: RTC Fuel Tax

Post updated on: March 22, 2024

Mill Street Capacity and Safety Project Map