PROJECT DETAILS
RTC Project No. 211007
RTC Project Manager (PM)
Roy Flores, P.E., M.P.A.
(775) 335-1881
rflores@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax
Design Firm: Jacobs Engineering Group
Construction Contractor: To be determined
PROJECT DESCRIPTION
The Mill Street Widening project limits are from Kietzke Lane to Terminal Way, approximately 0.75 miles in total length. Proposed improvements include widening Mill Street from Kietzke Lane to the I-580 southbound on-ramp from four to five lanes. Proposed improvements on Mill Street from the I-580 northbound on-ramp Interchange to Terminal Way include a raised median, widening of the roadway is not included and the existing four travel lanes will be maintained. The project improvements also exclude the I-580 interchange which was recently improved with NDOT’s Spaghetti Bowl Xpress (SBX) Project.
LATEST NEWS
Consultant continues to progress on the Final Design. Geotechnical investigation will begin this month.
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2022 – Fall 2022
Final Design: Winter 2023 – Spring 2024
Construction: Summer 2024
FINANCIAL INFORMATION
Total Project Estimate: $60,000,000
Funding Source: RTC Fuel Tax
Post updated on: April 27, 2022